Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance, Page 3 of 4  Not logged in ELOG logo
  ID Date Authordown Status Test Subject Text Attachments
  26   Friday, July 26, 2019, 13:06 Aaron Schmidt  Q2 - 2019 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July
 Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  27   Friday, September 27, 2019, 13:55 Aaron Schmidt  DI water supply leak outside room 06 - ISAC B1 Friday, September 27, 2019, 13:54: 
There is a pin hole water leak coming
from the DIW supply pipe going into the ISAC
 ISAC_B1_leak_-_1.jpegISAC_B1_leak_-_2.jpegISAC_B1_leak_-_4.jpegISAC_B1_leak_-_5.jpg 
  28   Wednesday, December 18, 2019, 13:50 Aaron Schmidt  Q4-2019 Ball Mill calibration & inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  29   Monday, January 13, 2020, 13:27 Aaron SchmidtUnder Process Leaking pipe in HC area Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
 
 Leak_location.jpg20200113_113443.jpg20200113_120206.jpg 
  32   Monday, July 13, 2020, 11:07 Aaron Schmidt  Eye wash temp Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg
  
  33   Monday, July 13, 2020, 11:23 Aaron Schmidt  Q2 - 2020 Ball mill inspection  Fritsch  Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  35   Wednesday, September 16, 2020, 10:42 Aaron Schmidt  Ball Mill troubleshoot. Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan"
  
  36   Friday, December 04, 2020, 12:58 Aaron Schmidt  Q4 - 2020 Ball Mill Calibration & Inspection     Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  37   Tuesday, February 09, 2021, 06:56 Aaron Schmidt  Planned power outage.Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage.
  
  38   Tuesday, August 03, 2021, 10:34 Aaron Schmidt  Q2 - 2021 Ball Mill Calibration & Inspection      Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  39   Tuesday, December 07, 2021, 09:23 Aaron Schmidt  Q4 - 2021 Ball Mill Calibration & Inspection  Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected.
 Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  41   Thursday, April 07, 2022, 12:00 Aaron SchmidtUnder Process Ar Glove box issue & LaC removal. Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure
  
  42   Thursday, April 07, 2022, 12:21 Aaron SchmidtFixed Ar glove box roughing pump.Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to
  
  43   Tuesday, July 12, 2022, 11:08 Aaron Schmidt  Q2 - 2022 Ball Mill Calibration & Inspection Fritsch
Pulverisette 5 Ball Mill status:
 20220712_110411.jpg 
  44   Friday, December 16, 2022, 07:36 Aaron Schmidt  Q4 - 2022 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2022_Ball_Mill_Calibration&_Inspection.png 
  45   Thursday, February 02, 2023, 10:30 Aaron Schmidt  Eyewash & Shower Station OK Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok.
  
  48   Friday, June 30, 2023, 12:21 Aaron Schmidt  Q2 - 2023 Ball Mill Calibration & Inspection   Fritsch  Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png 
  50   Thursday, November 30, 2023, 10:03 Aaron SchmidtFixed Ar Glove box - Blower / solenoid fix On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues
  
  51   Tuesday, December 12, 2023, 13:12 Aaron Schmidt  Q4 - 2023 Ball Mill Calibration & Inspection    Fritsch   
  54   Friday, February 09, 2024, 11:01 Aaron Schmidt  Laser cutter inspection Friday, February 09, 2024, 11:01:
Epilog laser cutter operates. OK
  
ELOG V2.9.2-2455