26
|
Friday, July 26, 2019, 13:06 |
Aaron Schmidt | | | Q2 - 2019 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July |
|
27
|
Friday, September 27, 2019, 13:55 |
Aaron Schmidt | | | DI water supply leak outside room 06 - ISAC B1 | Friday, September 27, 2019, 13:54:
There is a pin hole water leak coming
from the DIW supply pipe going into the ISAC |
|
28
|
Wednesday, December 18, 2019, 13:50 |
Aaron Schmidt | | | Q4-2019 Ball Mill calibration & inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
29
|
Monday, January 13, 2020, 13:27 |
Aaron Schmidt | Under Process | | Leaking pipe in HC area | Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
|
|
32
|
Monday, July 13, 2020, 11:07 |
Aaron Schmidt | | | Eye wash temp | Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg |
|
33
|
Monday, July 13, 2020, 11:23 |
Aaron Schmidt | | | Q2 - 2020 Ball mill inspection | Fritsch |
|
35
|
Wednesday, September 16, 2020, 10:42 |
Aaron Schmidt | | | Ball Mill troubleshoot. | Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan" |
|
36
|
Friday, December 04, 2020, 12:58 |
Aaron Schmidt | | | Q4 - 2020 Ball Mill Calibration & Inspection | |
|
37
|
Tuesday, February 09, 2021, 06:56 |
Aaron Schmidt | | | Planned power outage. | Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage. |
|
38
|
Tuesday, August 03, 2021, 10:34 |
Aaron Schmidt | | | Q2 - 2021 Ball Mill Calibration & Inspection | |
|
39
|
Tuesday, December 07, 2021, 09:23 |
Aaron Schmidt | | | Q4 - 2021 Ball Mill Calibration & Inspection | Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected. |
|
41
|
Thursday, April 07, 2022, 12:00 |
Aaron Schmidt | Under Process | | Ar Glove box issue & LaC removal. | Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure |
|
42
|
Thursday, April 07, 2022, 12:21 |
Aaron Schmidt | Fixed | | Ar glove box roughing pump. | Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to |
|
43
|
Tuesday, July 12, 2022, 11:08 |
Aaron Schmidt | | | Q2 - 2022 Ball Mill Calibration & Inspection | Fritsch
Pulverisette 5 Ball Mill status:
|
|
44
|
Friday, December 16, 2022, 07:36 |
Aaron Schmidt | | | Q4 - 2022 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
45
|
Thursday, February 02, 2023, 10:30 |
Aaron Schmidt | | | Eyewash & Shower Station OK | Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok. |
|
48
|
Friday, June 30, 2023, 12:21 |
Aaron Schmidt | | | Q2 - 2023 Ball Mill Calibration & Inspection | Fritsch |
|
50
|
Thursday, November 30, 2023, 10:03 |
Aaron Schmidt | Fixed | | Ar Glove box - Blower / solenoid fix | On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues |
|
51
|
Tuesday, December 12, 2023, 13:12 |
Aaron Schmidt | | | Q4 - 2023 Ball Mill Calibration & Inspection | Fritsch |
|
54
|
Friday, February 09, 2024, 11:01 |
Aaron Schmidt | | | Laser cutter inspection | Friday, February 09, 2024, 11:01:
Epilog laser cutter operates. OK |
|