Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance, Page 3 of 4  Not logged in ELOG logo
Entry  Friday, July 26, 2019, 13:06, Aaron Schmidt, , , Q2 - 2019 Ball Mill Calibration & Inspection Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
 Fritsch Pulverisette 5 Ball Mill status:
SN 05.6010 / 03005: Inspected July 5, 2019. Ok
 
Entry  Friday, September 27, 2019, 13:55, Aaron Schmidt, , , DI water supply leak outside room 06 - ISAC B1 ISAC_B1_leak_-_1.jpegISAC_B1_leak_-_2.jpegISAC_B1_leak_-_4.jpegISAC_B1_leak_-_5.jpg
 Friday, September 27, 2019, 13:54: 
There is a pin hole water leak coming from the DIW supply pipe going into the ISAC B1 hot lab - rm 06. It appears to be on the solder / joint.
The leak is very small at this point. Mostly just a drip. 
Entry  Wednesday, December 18, 2019, 13:50, Aaron Schmidt, , , Q4-2019 Ball Mill calibration & inspection Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
 Fritsch Pulverisette 5 Ball Mill status:
Wednesday, December 18, 2019, 13:48: 
SN 05.6010 / 03005: Inspected. Ok
Entry  Monday, January 13, 2020, 13:27, Aaron Schmidt, Under Process, , Leaking pipe in HC area Leak_location.jpg20200113_113443.jpg20200113_120206.jpg
 Monday, January 13, 2020, 10:30: Leak noted in HC area by Chad to ISAC Ops.
 
Monday, January 13, 2020, 13:32: The water leak was found to be coming from the sinks in the ISAC B1 Cold Lab. Target cleaning was occurring at
Entry  Monday, July 13, 2020, 11:07, Aaron Schmidt, , , Eye wash temp 
 Temp was noted to be high @ 50 deg C.
Adjusted the regulators to 35 deg C. Ran both the eye-wash station & shower. Waited 20 minutes. Ran them again and tuned.
Monday, July 13, 2020, 10:00: Complete. 
Entry  Monday, July 13, 2020, 11:23, Aaron Schmidt, , , Q2 - 2020 Ball mill inspection Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
  Fritsch Pulverisette
5 Ball Mill status:
Monday, July 13, 2020, 11:22: 
Entry  Wednesday, September 16, 2020, 10:42, Aaron Schmidt, , , Ball Mill troubleshoot. 
 Odd noises reported. Darwin & Marla. "Like a rock caught in a fan"
AS -  Re-installed bolts to run. Note, balancing feet underneath were uneven. Especially the front right foot was roughly 3/8" out of
position. No jars installed.
Entry  Friday, December 04, 2020, 12:58, Aaron Schmidt, , , Q4 - 2020 Ball Mill Calibration & Inspection Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
   Fritsch Pulverisette 5 Ball Mill status:
Monday, July 13, 2020, 11:22: 
Entry  Tuesday, February 09, 2021, 06:56, Aaron Schmidt, , , Planned power outage. 
Tuesday, February 09, 2021, 06:53: Evaporator 2 off. Evaporator 1 ok, Fume hoods ok. Ar glove box off. Ready for planned power outage.
Should last from 0800 to1200. 
Tuesday, February 09, 2021, 11:30: Confirmation there was no EF14/15 trip. Ar Glove box on. Evaporator 2 back on.
Entry  Tuesday, August 03, 2021, 10:34, Aaron Schmidt, , , Q2 - 2021 Ball Mill Calibration & Inspection  Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
    Fritsch Pulverisette 5 Ball
Mill status:
Entry  Tuesday, December 07, 2021, 09:23, Aaron Schmidt, , , Q4 - 2021 Ball Mill Calibration & Inspection  Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
 Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected. Ok
 
Entry  Thursday, April 07, 2022, 12:00, Aaron Schmidt, Under Process, , Ar Glove box issue & LaC removal. 
 Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that the glove box was not regulating pressure properly & the H2O sensor was reading (Very unstable) anywhere from
30 ppm to 0.25%. The box was isolated & checked for leaks. Unable to vent properly except manually.
Entry  Thursday, April 07, 2022, 12:21, Aaron Schmidt, Fixed, , Ar glove box roughing pump. 
Thursday, April 07, 2022, 12:00: While preparing to remove LaC, the roughing pump (1) stopped operating. It didn't appear to seize, just no longer powered
up. Multiple outlets attempted. Vacuum group contacted & they brought us a replacement.
Thursday, April 07, 2022, 12:21: Pump was replaced. (Pump 2).
Entry  Tuesday, July 12, 2022, 11:08, Aaron Schmidt, , , Q2 - 2022 Ball Mill Calibration & Inspection  20220712_110411.jpg
Fritsch Pulverisette 5 Ball Mill status:
Tuesday, July 12, 2022, 11:06:
SN 05.6010 / 03005: Inspected. Ok
Entry  Friday, December 16, 2022, 07:36, Aaron Schmidt, , , Q4 - 2022 Ball Mill Calibration & Inspection Q4_-_2022_Ball_Mill_Calibration&_Inspection.png
 Fritsch Pulverisette 5 Ball Mill status:
Friday, December 16, 2022, 07:35 
SN 05.6010 / 03005: Inspected. Ok
Entry  Thursday, February 02, 2023, 10:30, Aaron Schmidt, , , Eyewash & Shower Station OK 
 Thursday, February 02, 2023, 10:14: Cold Lab Eyewash & shower station ran. Ok.
Entry  Friday, June 30, 2023, 12:21, Aaron Schmidt, , , Q2 - 2023 Ball Mill Calibration & Inspection  Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png
  Fritsch Pulverisette
5 Ball Mill status:
Friday, June 30, 2023, 12:20:
Entry  Thursday, November 30, 2023, 10:03, Aaron Schmidt, Fixed, , Ar Glove box - Blower / solenoid fix 
 On November 10th / 11th a site wide power outage occured. Once power was restored, the Ar glove box had intermittent issues with the solenoids
& blower. The blower did not start & the solenoids often got stuck or ceased operating. 
Yesterday Randy B inspected the connections to see if they were receiving enough power. It was good from the main plug-in, through to the PLC,
Entry  Tuesday, December 12, 2023, 13:12, Aaron Schmidt, , , Q4 - 2023 Ball Mill Calibration & Inspection  
   Fritsch
Pulverisette 5 Ball Mill status:
Tuesday, December 12, 2023, 13:11:
Entry  Friday, February 09, 2024, 11:01, Aaron Schmidt, , , Laser cutter inspection 
 Friday, February 09, 2024, 11:01: Epilog laser cutter operates. OK
ELOG V2.9.2-2455