19
|
Wednesday, December 20, 2017, 09:16 |
Laura Lambert | | | RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 | Wednesday, December 20, 2017, 09:02
Replaced Argon tank |
|
|
20
|
Tuesday, January 23, 2018, 11:58 |
Laura Lambert | | | All BeO removed from Labs! | Tuesday, January 23, 2018, 11:55
Portable glove box with everything
inside, contaminated beakers, pellets and |
|
|
21
|
Wednesday, January 31, 2018, 13:35 |
Laura Lambert | | | New lab safety mirrors installed in hot lab | Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been
installed in the hot lab, now all locations |
|
|
22
|
Monday, April 09, 2018, 15:59 |
Laura Lambert | Fixed | | Glove box leak in hot lab | Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the |
|
|
23
|
Thursday, February 07, 2019, 10:42 |
Aaron Schmidt | | | Argon Glove box leak / regeneration failure |
A regeneration of the Ar Glove box
had been performed Monday, 04, Feb, 2019. |
7x |
|
24
|
Thursday, March 21, 2019, 07:43 |
Aaron Schmidt | | | Argon Glove box repair & link to nuclear ventilation | The Ar glove box issues ( https://elog.triumf.ca/TIS/General/23
) have been fixed.
Quoted from work permit: |
6x |
|
25
|
Wednesday, April 24, 2019, 10:19 |
Aaron Schmidt | Fixed | | Cold Lab back sink leak |
Wednesday, April 24, 2019,
10:00: |
|
|
26
|
Friday, July 26, 2019, 13:06 |
Aaron Schmidt | | | Q2 - 2019 Ball Mill Calibration & Inspection | Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July |
|
|
27
|
Friday, September 27, 2019, 13:55 |
Aaron Schmidt | | | DI water supply leak outside room 06 - ISAC B1 | Friday, September 27, 2019, 13:54:
There is a pin hole water leak coming
from the DIW supply pipe going into the ISAC |
|
|
28
|
Wednesday, December 18, 2019, 13:50 |
Aaron Schmidt | | | Q4-2019 Ball Mill calibration & inspection | Fritsch Pulverisette
5 Ball Mill status: |
|
|
29
|
Monday, January 13, 2020, 13:27 |
Aaron Schmidt | Under Process | | Leaking pipe in HC area | Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
|
|
|
30
|
Wednesday, April 08, 2020, 11:40 |
Anders Mjos | | | Lab check in | Checked in on the labs and other equipment
yesterday. Everything looks ok, including
the glove box Ar supply. Recorded O2 and |
|
|
31
|
Friday, April 24, 2020, 16:27 |
Anders Mjos | | | Lab check in |
|
|
|
32
|
Monday, July 13, 2020, 11:07 |
Aaron Schmidt | | | Eye wash temp | Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg |
|
|
33
|
Monday, July 13, 2020, 11:23 |
Aaron Schmidt | | | Q2 - 2020 Ball mill inspection | Fritsch |
|
|
35
|
Wednesday, September 16, 2020, 10:42 |
Aaron Schmidt | | | Ball Mill troubleshoot. | Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan" |
|
|
36
|
Friday, December 04, 2020, 12:58 |
Aaron Schmidt | | | Q4 - 2020 Ball Mill Calibration & Inspection | |
|
|
37
|
Tuesday, February 09, 2021, 06:56 |
Aaron Schmidt | | | Planned power outage. | Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage. |
|
|
38
|
Tuesday, August 03, 2021, 10:34 |
Aaron Schmidt | | | Q2 - 2021 Ball Mill Calibration & Inspection | |
|
|
39
|
Tuesday, December 07, 2021, 09:23 |
Aaron Schmidt | | | Q4 - 2021 Ball Mill Calibration & Inspection | Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected. |
|