Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance, Page 2 of 4  Not logged in ELOG logo
ID Date Author Status Testdown Subject Text Attachments
  19   Wednesday, December 20, 2017, 09:16 Laura Lambert  RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 Wednesday, December 20, 2017, 09:02
Replaced Argon tank
  
  20   Tuesday, January 23, 2018, 11:58 Laura Lambert  All BeO removed from Labs! Tuesday, January 23, 2018, 11:55
Portable glove box with everything
inside, contaminated beakers, pellets and
  
  21   Wednesday, January 31, 2018, 13:35 Laura Lambert  New lab safety mirrors installed in hot lab Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been
installed in the hot lab, now all locations
 IMG_0237.JPGIMG_0239.JPG 
  22   Monday, April 09, 2018, 15:59 Laura LambertFixed Glove box leak in hot lab Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the
 GetImage.jpgGetImage_(1).jpgGetImage_(2).jpgGetImage_(3).jpg 
  23   Thursday, February 07, 2019, 10:42 Aaron Schmidt  Argon Glove box leak / regeneration failure 
A regeneration of the Ar Glove box
had been performed Monday, 04, Feb, 2019.
 7x 
  24   Thursday, March 21, 2019, 07:43 Aaron Schmidt  Argon Glove box repair & link to nuclear ventilationThe Ar glove box issues ( https://elog.triumf.ca/TIS/General/23
) have been fixed.
Quoted from work permit: 
 6x 
  25   Wednesday, April 24, 2019, 10:19 Aaron SchmidtFixed Cold Lab back sink leak 
 Wednesday, April 24, 2019,
10:00:
  
  26   Friday, July 26, 2019, 13:06 Aaron Schmidt  Q2 - 2019 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July
 Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  27   Friday, September 27, 2019, 13:55 Aaron Schmidt  DI water supply leak outside room 06 - ISAC B1 Friday, September 27, 2019, 13:54: 
There is a pin hole water leak coming
from the DIW supply pipe going into the ISAC
 ISAC_B1_leak_-_1.jpegISAC_B1_leak_-_2.jpegISAC_B1_leak_-_4.jpegISAC_B1_leak_-_5.jpg 
  28   Wednesday, December 18, 2019, 13:50 Aaron Schmidt  Q4-2019 Ball Mill calibration & inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  29   Monday, January 13, 2020, 13:27 Aaron SchmidtUnder Process Leaking pipe in HC area Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
 
 Leak_location.jpg20200113_113443.jpg20200113_120206.jpg 
  30   Wednesday, April 08, 2020, 11:40 Anders Mjos  Lab check inChecked in on the labs and other equipment
yesterday. Everything looks ok, including
the glove box Ar supply. Recorded O2 and
  
  31   Friday, April 24, 2020, 16:27 Anders Mjos  Lab check in


   
        
            
 20200422_154045506_iOS.jpg 
  32   Monday, July 13, 2020, 11:07 Aaron Schmidt  Eye wash temp Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg
  
  33   Monday, July 13, 2020, 11:23 Aaron Schmidt  Q2 - 2020 Ball mill inspection  Fritsch  Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  35   Wednesday, September 16, 2020, 10:42 Aaron Schmidt  Ball Mill troubleshoot. Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan"
  
  36   Friday, December 04, 2020, 12:58 Aaron Schmidt  Q4 - 2020 Ball Mill Calibration & Inspection     Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  37   Tuesday, February 09, 2021, 06:56 Aaron Schmidt  Planned power outage.Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage.
  
  38   Tuesday, August 03, 2021, 10:34 Aaron Schmidt  Q2 - 2021 Ball Mill Calibration & Inspection      Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  39   Tuesday, December 07, 2021, 09:23 Aaron Schmidt  Q4 - 2021 Ball Mill Calibration & Inspection  Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected.
 Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
ELOG V2.9.2-2455