  Lab Maintenance, Page 2 of 4  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Status Test Subject Text Attachments
  44   Friday, December 16, 2022, 07:36 Aaron Schmidt  Q4 - 2022 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2022_Ball_Mill_Calibration&_Inspection.png 
  43   Tuesday, July 12, 2022, 11:08 Aaron Schmidt  Q2 - 2022 Ball Mill Calibration & Inspection Fritsch
Pulverisette 5 Ball Mill status:
 20220712_110411.jpg 
  42   Thursday, April 07, 2022, 12:21 Aaron SchmidtFixed Ar glove box roughing pump.Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to
  
  41   Thursday, April 07, 2022, 12:00 Aaron SchmidtUnder Process Ar Glove box issue & LaC removal. Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure
  
  40   Thursday, January 20, 2022, 13:38 Carla Babcock  Testing of spare FUG bias supplyTomislav and John Chow tested the spare
bias supply located in the rack of the electrical
services room. This is a FUG HCN 1400 M-60000,
  
  39   Tuesday, December 07, 2021, 09:23 Aaron Schmidt  Q4 - 2021 Ball Mill Calibration & Inspection  Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected.
 Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  38   Tuesday, August 03, 2021, 10:34 Aaron Schmidt  Q2 - 2021 Ball Mill Calibration & Inspection      Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  37   Tuesday, February 09, 2021, 06:56 Aaron Schmidt  Planned power outage.Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage.
  
  36   Friday, December 04, 2020, 12:58 Aaron Schmidt  Q4 - 2020 Ball Mill Calibration & Inspection     Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  35   Wednesday, September 16, 2020, 10:42 Aaron Schmidt  Ball Mill troubleshoot. Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan"
  
  34   Wednesday, August 05, 2020, 19:50 Darwin Ortiz RosalesFixed1Hot Lab Glove Box RegenerationWednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration
of the glovebox was started.
  
  33   Monday, July 13, 2020, 11:23 Aaron Schmidt  Q2 - 2020 Ball mill inspection  Fritsch  Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  32   Monday, July 13, 2020, 11:07 Aaron Schmidt  Eye wash temp Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg
  
  31   Friday, April 24, 2020, 16:27 Anders Mjos  Lab check in


   
        
            
 20200422_154045506_iOS.jpg 
  30   Wednesday, April 08, 2020, 11:40 Anders Mjos  Lab check inChecked in on the labs and other equipment
yesterday. Everything looks ok, including
the glove box Ar supply. Recorded O2 and
  
  29   Monday, January 13, 2020, 13:27 Aaron SchmidtUnder Process Leaking pipe in HC area Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
 
 Leak_location.jpg20200113_113443.jpg20200113_120206.jpg 
  28   Wednesday, December 18, 2019, 13:50 Aaron Schmidt  Q4-2019 Ball Mill calibration & inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  27   Friday, September 27, 2019, 13:55 Aaron Schmidt  DI water supply leak outside room 06 - ISAC B1 Friday, September 27, 2019, 13:54: 
There is a pin hole water leak coming
from the DIW supply pipe going into the ISAC
 ISAC_B1_leak_-_1.jpegISAC_B1_leak_-_2.jpegISAC_B1_leak_-_4.jpegISAC_B1_leak_-_5.jpg 
  26   Friday, July 26, 2019, 13:06 Aaron Schmidt  Q2 - 2019 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July
 Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  25   Wednesday, April 24, 2019, 10:19 Aaron SchmidtFixed Cold Lab back sink leak 
 Wednesday, April 24, 2019,
10:00:
  