  11   Thursday, February 23, 2012, 13:38 Anders MjosFixed Water leak in chemistry / cold lab

 Please see attached file for notes on the water leak from the cold lab fume hood Tuesday Feb 21.

Attachment 1: Notes_on_water_leak_ISAC_I.docx
  5   Friday, May 13, 2011, 11:59 John WongFixed Uranium Waste Container Removed from Hotlab

Fri May 13 11:55:37 2011:  The contain in the uranium waste container was removed and transferred into a beaker and sealed.  The total waste mass = 12.59g, over 100K CPM.  The container is double bagged and will be removed from the Hotlab. 

  40   Thursday, January 20, 2022, 13:38 Carla Babcock  Testing of spare FUG bias supply

Tomislav and John Chow tested the spare bias supply located in the rack of the electrical services room. This is a FUG HCN 1400 M-60000, serial 11590-01-01, PO TR131986 but when it was installed online we found it could not go above about 40kV. It was replaced but not tested until now. Tomislav says:

"We started testing the FuG this morning, in manual mode it is possible to reach 60 kV, 59.75 according to the display and with the load we have 1.6 mA. From the DC HV point of view, at least in manual mode no problem.

When we looked at the HV through a 1000:1 voltage divider in the oscilloscope there is a situation, the coupling in graphs 4 and 5, attached, is AC, and it was taken at 55 kV. The 200 mV scale represents 200 V because of the divider. There is a strong noise of 200 Vpp at 55 kV, it can be interpreted as ripple of 0.36%, we usually ask in FuGs 10-5 or 0.001%. Also there are random peaks of 1 V in the divider (1000V in the output) that indicate a possible failure of the PWM circuit that generates the high voltage.

Because of issues like these Friedhelm replaced the old ITW power supply, these instabilities caused problems in the experiments, so I am not sure if it is necessary to continue testing this PS. We can only do a remote test that I do not expect to give different results from what we have now, maybe we will find an issue and it does not go beyond 40 kV, and we can check long term stability, the DC value should remain very constant for at least 8 hrs."

  12   Tuesday, February 28, 2012, 12:01 John Wong  TIS/RH Users

Tuesday, February 28, 2012, 11:31

Hi All,

Hope you all find the TIS/RH elog useful :)  There are a few things I want to share with you.  

Did you know that you can make comments to the existing entries by using the "REPLY" function, so you can keep all the related entries in the same subjects?  Yap!  By doing that, we all keep the elogs organized :) 

If you are using shared computers, please remember to log out when you finish with the elog.  I suggest you to NOT check the "Keep me logged in..." box when you sign in. 

If you have any questions/comments please feel free to let me know.  

 

TIS/RH admin,

John Wong

 

*** All users are subscribed to the General elog.  If you do not want to receive emails from the General elog, you can unsubscribe by disable the automatic email notifications in the "Config" setting. ***

 

 

  7   Friday, June 24, 2011, 18:00 John WongUnder Process TIS New Users

Hi All,

As requested by Pierrer Bricault,  I have added the following users to join the Targets and Ion Source (TIS) elog: 

Grant Minor, Bevan Moss, Don Jackson, Chad Fisher, Travis Cave, David Wang, Tom Lyth, Ron Kuramoto, Maico Dalla Valla, Ron Muller. 

Here is the link: https://elog.triumf.ca/TIS/

Your login names and temporary passwords are your first and last name (no spacing & all low cases, eg. Maico's user and password: maicodallavalla).  Once you're logged in, please change your password. 

I have created a few more elogs for the Remote Handling group:  RH-Cyclotron, RH-Conditioning Station, RH-Yield Station.  All new elogs entries come with the default attributes, "TYPE" and "Category".  These attributes and the dropdown options can be added and changed.  See "Evaporator_1" logbook how I have created 4 attributes: Target, Number, Source, Status. There are also many other functions, see the attachment for a few examples. Try using the elog; let me know how you would like to change it to work better for you and the group, and I'll do my best.

 If you have any question, please feel free to ask.  

 

TIS-Elog Administrator, 

John Wong

Attachment 1: elog_demo.png
elog_demo.png
  19   Wednesday, December 20, 2017, 09:16 Laura Lambert  RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2

 Wednesday, December 20, 2017, 09:02

Replaced Argon tank for glove box, full tank of Ar ~2350psi.


Wednesday, January 3, 2018, 11:59

Water turned back on, no leaks detected.

Glove box checked, O2 and H2O levels good.


 

  28   Wednesday, December 18, 2019, 13:50 Aaron Schmidt  Q4-2019 Ball Mill calibration & inspection

 Fritsch Pulverisette 5 Ball Mill status:

Wednesday, December 18, 2019, 13:48: 

SN 05.6010 / 03005: Inspected. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

 

See attached.

Attachment 1: Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
  64   Monday, December 16, 2024, 12:15 Aaron SchmidtCompleted Q4 - 2024 Ball Mill Calibration & Inspection

 Fritsch Pulverisette 5 Ball Mill status:

Monday, December 16, 2024, 12:12:

SN 05.6010 / 03005: Inspected. Ok. 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

 

Attachment 1: Q4_-_2024_Ball_Mill_Calibration&_Inspection.png
Q4_-_2024_Ball_Mill_Calibration&_Inspection.png
  51   Tuesday, December 12, 2023, 13:12 Aaron Schmidt  Q4 - 2023 Ball Mill Calibration & Inspection

   Fritsch Pulverisette 5 Ball Mill status:

Tuesday, December 12, 2023, 13:11:

SN 05.6010 / 03005: Inspected. Ok

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

  44   Friday, December 16, 2022, 07:36 Aaron Schmidt  Q4 - 2022 Ball Mill Calibration & Inspection

 Fritsch Pulverisette 5 Ball Mill status:

Friday, December 16, 2022, 07:35 

SN 05.6010 / 03005: Inspected. Ok

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q4_-_2022_Ball_Mill_Calibration&_Inspection.png
Q4_-_2022_Ball_Mill_Calibration&_Inspection.png
  39   Tuesday, December 07, 2021, 09:23 Aaron Schmidt  Q4 - 2021 Ball Mill Calibration & Inspection

 Tuesday, December 07, 2021, 09:23:

SN 05.6010 / 03005: Inspected. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
  36   Friday, December 04, 2020, 12:58 Aaron Schmidt  Q4 - 2020 Ball Mill Calibration & Inspection

   Fritsch Pulverisette 5 Ball Mill status:

Monday, July 13, 2020, 11:22: 

SN 05.6010 / 03005: Inspected. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
  59   Thursday, July 11, 2024, 13:40 Aaron Schmidt  Q2 - 2024 Ball Mill Calibration & Inspection

Fritsch Pulverisette 5 Ball Mill status:

Thursday, July 11, 2024, 13:39:

SN 05.6010 / 03005: Inspected. Ok. Was dirty inside. Cleaned.

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q2_-2024_Ball_Mill_Calibration_&_inspection.jfif
Attachment 2: Q2_-_2024_Clean_up.jfif
  48   Friday, June 30, 2023, 12:21 Aaron Schmidt  Q2 - 2023 Ball Mill Calibration & Inspection

  Fritsch Pulverisette 5 Ball Mill status:

Friday, June 30, 2023, 12:20:

SN 05.6010 / 03005: Inspected. Ok

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png
Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png
  43   Tuesday, July 12, 2022, 11:08 Aaron Schmidt  Q2 - 2022 Ball Mill Calibration & Inspection

Fritsch Pulverisette 5 Ball Mill status:

Tuesday, July 12, 2022, 11:06:

SN 05.6010 / 03005: Inspected. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: 20220712_110411.jpg
20220712_110411.jpg
  38   Tuesday, August 03, 2021, 10:34 Aaron Schmidt  Q2 - 2021 Ball Mill Calibration & Inspection

    Fritsch Pulverisette 5 Ball Mill status:

Tuesday, August 03, 2021, 10:33 

SN 05.6010 / 03005: Inspected. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
  33   Monday, July 13, 2020, 11:23 Aaron Schmidt  Q2 - 2020 Ball mill inspection

  Fritsch Pulverisette 5 Ball Mill status:

Monday, July 13, 2020, 11:22: 

SN 05.6010 / 03005: Inspected. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

 

Attachment 1: Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
  26   Friday, July 26, 2019, 13:06 Aaron Schmidt  Q2 - 2019 Ball Mill Calibration & Inspection

 Fritsch Pulverisette 5 Ball Mill status:

SN 05.6010 / 03005: Inspected July 5, 2019. Ok

 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

 

See attached.

Attachment 1: Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
  37   Tuesday, February 09, 2021, 06:56 Aaron Schmidt  Planned power outage.

Tuesday, February 09, 2021, 06:53: Evaporator 2 off. Evaporator 1 ok, Fume hoods ok. Ar glove box off. Ready for planned power outage.

Should last from 0800 to1200.

Tuesday, February 09, 2021, 11:30: Confirmation there was no EF14/15 trip. Ar Glove box on. Evaporator 2 back on.

  8   Tuesday, July 19, 2011, 16:26 John WongFixed Planetary Ball Mill moved to Hotlab

 Tuesday, July 19, 2011, 16:22:  The planetary ball mill was in the coldlab, and now it has moved to the hot lab for the purpose of processing UCx targets.  The ball mill is installed in front of the fumehood and near by the alpha filters.  The legs are secured in the metal rings so the machine will not move away during milling.  (see attachment).

Attachment 1: Screen_shot_2011-07-19_at_4.21.04_PM.png
Screen_shot_2011-07-19_at_4.21.04_PM.png