Entry  Thursday, February 23, 2012, 13:38, Anders Mjos, Fixed, , Water leak in chemistry / cold lab Notes_on_water_leak_ISAC_I.docx
 Please see attached file for notes on the water leak from the cold lab fume hood Tuesday Feb 21.
Entry  Friday, May 13, 2011, 11:59, John Wong, Fixed, , Uranium Waste Container Removed from Hotlab 
Fri May 13 11:55:37 2011:  The contain in the uranium waste container was removed and transferred into a beaker and sealed.  The total waste
mass = 12.59g, over 100K CPM.  The container is double bagged and will be removed from the Hotlab. 
Entry  Thursday, January 20, 2022, 13:38, Carla Babcock, , , Testing of spare FUG bias supply 
Tomislav and John Chow tested the spare bias supply located in the rack of the electrical services room. This is a FUG HCN 1400 M-60000, serial 11590-01-01,
PO TR131986 but when it was installed online we found it could not go above about 40kV. It was replaced but not tested until now. Tomislav says:
"We started testing the FuG this morning, in manual mode it is       possible to reach 60 kV, 59.75 according to the display and with    
Entry  Tuesday, February 28, 2012, 12:01, John Wong, , , TIS/RH Users 
Tuesday, February 28, 2012, 11:31
Hi All,
Hope you all find the TIS/RH elog useful :)  There are a few things I want to share with you.  
Entry  Friday, June 24, 2011, 18:00, John Wong, Under Process, , TIS New Users  elog_demo.png
Hi All,
As requested by Pierrer Bricault,  I have added the following users to join the Targets and Ion Source (TIS) elog: 
Grant Minor, Bevan Moss, Don Jackson, Chad Fisher, Travis Cave, David Wang, Tom Lyth, Ron Kuramoto, Maico Dalla Valla, Ron Muller. 
Entry  Wednesday, December 20, 2017, 09:16, Laura Lambert, , , RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 
 Wednesday, December 20, 2017, 09:02
Replaced Argon tank for glove box, full tank of Ar ~2350psi.

Wednesday, January 3, 2018, 11:59
Entry  Wednesday, December 18, 2019, 13:50, Aaron Schmidt, , , Q4-2019 Ball Mill calibration & inspection Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
 Fritsch Pulverisette 5 Ball Mill status:
Wednesday, December 18, 2019, 13:48: 
SN 05.6010 / 03005: Inspected. Ok
Entry  Monday, December 16, 2024, 12:15, Aaron Schmidt, Completed, , Q4 - 2024 Ball Mill Calibration & Inspection  Q4_-_2024_Ball_Mill_Calibration&_Inspection.png
 Fritsch Pulverisette 5 Ball Mill status:
Monday, December 16, 2024, 12:12:
SN 05.6010 / 03005: Inspected. Ok. 
Entry  Tuesday, December 12, 2023, 13:12, Aaron Schmidt, , , Q4 - 2023 Ball Mill Calibration & Inspection  
   Fritsch
Pulverisette 5 Ball Mill status:
Tuesday, December 12, 2023, 13:11:
Entry  Friday, December 16, 2022, 07:36, Aaron Schmidt, , , Q4 - 2022 Ball Mill Calibration & Inspection Q4_-_2022_Ball_Mill_Calibration&_Inspection.png
 Fritsch Pulverisette 5 Ball Mill status:
Friday, December 16, 2022, 07:35 
SN 05.6010 / 03005: Inspected. Ok
Entry  Tuesday, December 07, 2021, 09:23, Aaron Schmidt, , , Q4 - 2021 Ball Mill Calibration & Inspection  Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
 Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected. Ok
 
Entry  Friday, December 04, 2020, 12:58, Aaron Schmidt, , , Q4 - 2020 Ball Mill Calibration & Inspection Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
   Fritsch Pulverisette 5 Ball Mill status:
Monday, July 13, 2020, 11:22: 
Entry  Thursday, July 11, 2024, 13:40, Aaron Schmidt, , , Q2 - 2024 Ball Mill Calibration & Inspection  Q2_-2024_Ball_Mill_Calibration_&_inspection.jfifQ2_-_2024_Clean_up.jfif
Fritsch Pulverisette 5 Ball Mill status:
Thursday, July 11, 2024, 13:39:
SN 05.6010 / 03005: Inspected. Ok. Was dirty inside. Cleaned.
Entry  Friday, June 30, 2023, 12:21, Aaron Schmidt, , , Q2 - 2023 Ball Mill Calibration & Inspection  Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png
  Fritsch Pulverisette
5 Ball Mill status:
Friday, June 30, 2023, 12:20:
Entry  Tuesday, July 12, 2022, 11:08, Aaron Schmidt, , , Q2 - 2022 Ball Mill Calibration & Inspection  20220712_110411.jpg
Fritsch Pulverisette 5 Ball Mill status:
Tuesday, July 12, 2022, 11:06:
SN 05.6010 / 03005: Inspected. Ok
Entry  Tuesday, August 03, 2021, 10:34, Aaron Schmidt, , , Q2 - 2021 Ball Mill Calibration & Inspection  Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf
    Fritsch Pulverisette 5 Ball
Mill status:
Entry  Monday, July 13, 2020, 11:23, Aaron Schmidt, , , Q2 - 2020 Ball mill inspection Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf
  Fritsch Pulverisette
5 Ball Mill status:
Monday, July 13, 2020, 11:22: 
Entry  Friday, July 26, 2019, 13:06, Aaron Schmidt, , , Q2 - 2019 Ball Mill Calibration & Inspection Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf
 Fritsch Pulverisette 5 Ball Mill status:
SN 05.6010 / 03005: Inspected July 5, 2019. Ok
 
Entry  Tuesday, February 09, 2021, 06:56, Aaron Schmidt, , , Planned power outage. 
Tuesday, February 09, 2021, 06:53: Evaporator 2 off. Evaporator 1 ok, Fume hoods ok. Ar glove box off. Ready for planned power outage.
Should last from 0800 to1200. 
Tuesday, February 09, 2021, 11:30: Confirmation there was no EF14/15 trip. Ar Glove box on. Evaporator 2 back on.
Entry  Tuesday, July 19, 2011, 16:26, John Wong, Fixed, , Planetary Ball Mill moved to Hotlab Screen_shot_2011-07-19_at_4.21.04_PM.png
 Tuesday, July 19, 2011, 16:22:  The planetary ball mill was in the coldlab, and now it has moved to the hot lab for the purpose of processing
UCx targets.  The ball mill is installed in front of the fumehood and near by the alpha filters.  The legs are secured in the metal rings so
the machine will not move away during milling.  (see attachment).