  Evaporator_2, Page 1 of 33  Not logged in ELOG logo
ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  67   Friday, April 19, 2013, 09:39 Rick MaharajEmpty  Donethermocouple Feedthru A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator
  
  218   Thursday, June 18, 2015, 11:39 Rick Maharaj    Installation of Extraction Electrode Insulator - New MaterialTuesday June 16, 2015
An Extraction Insulator ITD0381 made
from a different grade of AiN was installed
  
  2   Thursday, July 21, 2011, 17:33 Pierre Bricault   Maintenance Rick mentioned to me that the evaporator is
ready for the next steps of the commissioning
process.
  
  147   Friday, August 01, 2014, 11:47 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningThe maximum current of 580A was reached
at 9:15.
TGHT:RDCUR 578 A
  
  148   Friday, August 01, 2014, 13:27 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningTarget was conditioned for 4 hours at 580A.
Initiating ramp-down sequence @ 2A/min
 
 zrc6_conditioning.png 
  6   Monday, March 19, 2012, 17:10 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets Monday, March 19, 2012, 17:04
 
Target boat contains 4 BeO pellets
  
  10   Thursday, March 22, 2012, 17:56 Nikita BernierBeOTarget boat #1 DoneSintering BeO pellets

    

       
            
  
  11   Thursday, March 29, 2012, 19:30 Nikita BernierBeOTarget boat #1 DoneSintering new BeO pellets Thursday, March 29, 2012, 19:17
 
  
  14   Monday, April 02, 2012, 16:26 Nikita BernierBeOTarget boat #1 DoneSintering new BeO pellets

    

       
            
  
  16   Thursday, April 05, 2012, 16:40 Nikita BernierBeOTarget boat #2 DoneSintering BeO pellets #3Thursday, April 05, 2012, 16:31
Target boat contains 6 BeO
  
  22   Friday, May 18, 2012, 12:19 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 autoramp1.pngievap2autoheat1.png 
  24   Tuesday, May 22, 2012, 12:15 Nikita BernierSiC38481-2HP-SISDoneRe-condition the HP-SIS SiC target

    

       
            
 TGHT-VAC1.JPGTBHT-VAC1.JPG 
  26   Tuesday, May 22, 2012, 16:45 Nikita BernierBeOTarget boat #2 DoneSintering BeO pellets #3

    

       
            
  
  29   Tuesday, May 29, 2012, 15:43 Nikita BernierBeOTarget boat #2 FailedSintering BeO pellets #3

    

       
            
  
  31   Wednesday, June 20, 2012, 17:29 Nikita BernierNiOTa target boat DoneNiO developmentWednesday, June 20, 2012, 17:23
New Target boat, with no coating,
wrapped with a 0.002 inches thick Ta foil,
 NiO_density_measurements.xlsxCasts_thickness.GIF 
  39   Friday, August 10, 2012, 19:57 Nikita Bernier   DoneSintering Ta foil with TaO coating Friday, August 10, 2012, 19:54
 
  
  40   Saturday, August 11, 2012, 19:21 Nikita Bernier   DoneSintering Ta foil with TaO coating

    

       
            
 TaO1.pngTaO2.png 
  41   Monday, August 13, 2012, 13:50 Nikita Bernier   DoneSintering Ta foil with TaO coating

    

       
            
 TaO3.png 
  46   Monday, September 24, 2012, 15:12 Nikita BernierTaC  DoneSintering Ta foil with TaC coating Monday, September 24, 2012, 15:01
The target boat with TaC coating
is being used again. The inside of the boat
 striptool1.PNG 
  47   Monday, September 24, 2012, 18:09 Nikita BernierTaC  DoneSintering Ta foil with TaC coating

    

       
            
 striptool2.PNGstriptool4.PNGstriptool5.PNG 