499
|
Tuesday, August 18, 2020, 09:26 |
Marla Cervantes | TaC | 44489-15 | TARGET BOAT | Done | TaC coating/sintering | Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated
with TaC and wrapped with 3 layers of Ta, |
|
|
503
|
Sunday, August 30, 2020, 18:28 |
Marla Cervantes | Empty | 44489-13 | | Done | TaC coating/sintering | Sunday, August 30, 2020, 06:47
A short tantalum tube was coated |
|
|
500
|
Tuesday, August 18, 2020, 10:41 |
Marla Cervantes | TaC | 44489-11 | | Done | TaC coating/sintering | Thursday, August 19, 2020, 17:28
A short tantalum tube |
|
|
501
|
Saturday, August 22, 2020, 11:44 |
Marla Cervantes | | 44489-11 | | Done | C-Cartridge test#1 | Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC
and sintered, then it was loaded with a c-cartridge |
|
|
507
|
Thursday, September 17, 2020, 16:11 |
Marla Cervantes | Empty | 44139-9 | LP-SIS | Done | TaC coating/sintering | Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2 |
|
|
525
|
Tuesday, November 24, 2020, 12:56 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Graphite casting conditioning | Tuesday, November 24, 2020, 09:23
A batch of 60 discs of 18 mm diameter
were loaded in a tantalum tube. The tantalum |
|
|
508
|
Monday, September 21, 2020, 17:01 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Conditioning graphite target #3 | Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite
slurry were loaded in a tantalum tube, the |
|
|
555
|
Wednesday, September 08, 2021, 12:43 |
Darwin Ortiz Rosales | | 44139-8-SK | TARGET BOAT | Done | C Conditioning | Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto |
|
|
544
|
Tuesday, March 30, 2021, 19:49 |
Ferran Boix Pamies | Empty | 44139-7-SK | | Done | Parasitic target thermal tests | 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night. |
|
|
484
|
Wednesday, May 27, 2020, 13:04 |
Marla Cervantes | | 44139-7-SK | | Done | Conditioning graphite target #2 | Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr |
|
|
492
|
Saturday, July 25, 2020, 08:58 |
Darwin Ortiz Rosales | ZrC | 44139-7-SK | | In progress | ZrC for Luca's experiments | Friday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs |
|
|
515
|
Friday, October 09, 2020, 09:50 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | Tests, radiation gun for parasitic target | 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on, |
|
|
516
|
Tuesday, October 13, 2020, 11:15 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | foil heating | 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s |
|
|
517
|
Thursday, October 15, 2020, 18:51 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | heat gun plus parasitic target thermal comissioning. | 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. |
|
|
520
|
Tuesday, October 27, 2020, 10:25 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | parasitic target commissioning | 2020-10-27 10:24 setup introduced
yesterday. Pumping over night IGP1: 5.7e-7T.
Water leak check ok. Performing heating elements |
|
|
521
|
Monday, November 02, 2020, 18:32 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | HEA heat treatment | 2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while,
IGP1:1.8e-5T . water leak check ok. |
|
|
548
|
Thursday, April 15, 2021, 18:33 |
Marla Cervantes | Ta | 44139-6-SK | TARGET BOAT | Done | Carbon penetration on Ta | Thursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the |
|
|
669
|
Thursday, August 08, 2024, 11:17 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Done | Graphite foils conditioning |
|
|
|
670
|
Wednesday, August 14, 2024, 07:23 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems | EVAP2 Calibration - Vanadium | Tuesday, August 13, 2024, 17:20 Pressure
kept increasing when turning the turbo pump
on |
|
|
671
|
Wednesday, August 14, 2024, 16:22 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems resolved | EVAP2 Calibration - Vanadium |
|
|