Entry  Tuesday, August 18, 2020, 09:26, Marla Cervantes, TaC, 44489-15, TARGET BOAT, Done, TaC coating/sintering  

 Tuesday, August 18, 2020, 09:06

A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,

a Ta foil was attached to the end of the tube to be able to measure the temperature during heating

Desired temperature= 1900 C,

Omega Slope set = 0.990,

IGP1 = 3.75e-7 Torr

Autoramp set to TGHT at 0.2 A/min to reach 52 A


Tuesday, August 18, 2020, 13:47

IGP1=  6.8e-7 Torr

TGHT =0 .511 V, 51.3 A

IGP1 = 6.8e-7 Torr

Autoramp set to TGHT at 0.5 A/min to reach 100 A


Tuesday, August 18, 2020, 20:39

IGP1 = 3.3e-7 Torr

Autoramp set to TGHT at 0.5 A/min to reach 430 A 


Wednesday, August 19, 2020, 06:57 

Autoramp stopped at 402 A

IGP1 = 1.12e-6 Torr

TGHT = 5.6 V, 403.65 A

Autoramp set to TGHT at 1 A/min to reach 500 A 


Wednesday, August 19, 2020, 08:59

IGp1 = 1.7e-6 Torr

 TGHT = 7.22 V, 500.34 A

After 30 min at 1900 °C, autoramp set to TGHT at -1 A/min to reach 450 A, the ramp will be stopped when the temperature reads 1850 °C

Autoramp stopped at 1845 °C

IGP1 = 1.17e-6 Torr

TGHT = 6.8 V, 472.95 A 

Entry  Sunday, August 30, 2020, 18:28, Marla Cervantes, Empty, 44489-13, , Done, TaC coating/sintering 

 Sunday, August 30, 2020, 06:47

A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,

a Ta cap was inserted to the end of the tube to be able to measure the temperature during heating

Desired temperature= 1900 C,

Omega Slope set = 0.990


Sunday, August 30, 2020, 06:48

IGP1 = 3.9e-7 Torr

Autoramp set to 0.5A/min to 400 A 


Sunday, August 30, 2020, 18:27

IGP1 8.41e-7 Torr

TGHT = 4.2 V, 327.15 A

Omega  = 1367 °C 


Sunday, August 30, 2020, 18:49

IGP1 = 9.6e-7 Torr

TGHT = 4.4 V, 337.1 a

Omega = 1402 °C 


Sunday, August 30, 2020, 19:25

IGP1 = 9.5e-7 Torr

TGHT = 4.6 A, 347.5 A

Omega = 1472 °C 

Autoramp set to 450 A at 0.1A/30s


Sunday, August 30, 2020, 19:59

IGP1 = 8.5e-7 Torr

TGHT = 4.8 V, 360.5 A

Omega = 1510 °C


 Sunday, August 30, 2020, 22:07

IGP1 = 7.2e-7 Torr

TGHT = 5.3 V, 392.6 A

Omega = 1675 °C 


 Sunday, August 30, 2020, 22:16

IGP1 = 7.1e-7 Torr

TGHT = 5.5 V, 403.2 A

Omega = 1678 °C

Autoramp set to 450 at 0.1A/min


 Sunday, August 30, 2020, 22:26

IGP1 = 6.9e-7 Torr

TGHT = 5.5 V, 399.15 A

Omega = 1689 °C


Monday, August 31, 2020, 08:08

IGP1 = 4.4e-7 Torr

TGHT = 6.4 V, 453.4

Omega =  1852 °C


Monday, August 31, 2020, 08:12 

Autorap set to 0 A at -5 A/min

Entry  Tuesday, August 18, 2020, 10:41, Marla Cervantes, TaC, 44489-11, , Done, TaC coating/sintering  

Thursday, August 19, 2020, 17:28

 A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,

a Ta foil was attached to the end of the tube to be able to measure the temperature during heating

Desired temperature= 1900 C,

Omega Slope set = 0.990,


Thursday, August 20, 2020, 17:29

IGP1 = 4.25 e-7 Torr

Autoramp set to 0.5A/min to 400 A 


 Thursday, August 20, 2020, 20:36

IGP1 = 6.78e-7 Torr

TGHT = 267.7 A, 3.28 V

Autoramp set to 0.4 A/min to 450 A


Friday, August 21, 2020, 10:28

 IGP1=7.23e-7 torr

TGHT = 6.3 v, 446.3 A

Omega = 1603 °C

Autoramp set to -5 A/min

Entry  Saturday, August 22, 2020, 11:44, Marla Cervantes, , 44489-11, , Done, C-Cartridge test#1 

Saturday, August 22, 2020, 11:41

A Ta short tube was coated with TaC and sintered, then it was loaded with a c-cartridge

Now is currently under vacuum and it will be heated to 2000 °C during 3 days


Saturday, August 22, 2020, 11:43

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

IGP1 = 3.08e-7 Torr 

Autoram set to 10A/30 s to 200 A


 Saturday, August 22, 2020, 11:59

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

TGHT = 2.36 V, 200.1 A

IGP1 =2.46e-6 Torr

Autoramp set to to 300 A at 5A/30s 


Saturday, August 22, 2020, 13:03

TGHT = 7.32 V, 495.3 A

IGP1 = 2.7e-6 Torr

Omega = 2016 °C

AP = 1970.1 °C

Autoramp set to 550 A at 5A/30s


 Saturday, August 22, 2020, 13:11

TGHT =7.6 V, 523.2 A

IGP1 = 3.2e-6 Torr

Omega = 2077 °C


Monday, August 24, 2020, 07:59

Voltage increased ~0.2 V while current remained the same indicating an increment in resistance, temperature increment increased accordingly

TGHT = 7.815 V, 520.87 A

Omega = 2126 °C


Monday, August 24, 2020, 08:04

The current was reduced 0.1 A to 519.9

Monday, August 24, 2020, 08:55 Omega =  2112 °C


Monday, August 24, 2020, 09:12

The temperature returned to Omega = 2130 °C

The current was reduced 0.1 A to 519.8

Monday, August 24, 2020, 09:56

TGHT = 7.7 V, 518.3 A

Omega = 2132 °C 


Monday, August 24, 2020, 09:59 

The current was reduced 0.2 A to 519.6 A

TGHT = 7.7 V, 517.3 A

Monday, August 24, 2020, 10:07  Omega = 2130°C


 Monday, August 24, 2020, 10:08

The current was reduced 0.4 A to 519.2 A

TGHT = 7.7 V, 513.5 A

Monday, August 24, 2020, 10:13  Omega = 2129°C


Monday, August 24, 2020, 10:21

Voltage dropped to 7.6 V and temperature reduced to 2105 °C

Monday, August 24, 2020, 10:30

Voltage increased to 7.8 V and temperature increased to 2128 °C


Monday, August 24, 2020, 10:33

The current was reduced 0.4 A to 518.6 A

TGHT = 7.7 V, 513.06 A

Monday, August 24, 2020, 10:38  Omega = 2130 ­°C


Monday, August 24, 2020, 10:41

 The current was reduced 0.4 A to 518.2 A

Monday, August 24, 2020, 10:52 Omega = 2134 °C

Monday, August 24, 2020, 11:13 

 The current was reduced 0.4 A to 517.8 A

Monday, August 24, 2020, 11:19  Omega = 2128 °C


Monday, August 24, 2020, 11:19 

 The current was reduced 0.4 A to 517.4 A

Monday, August 24, 2020, 11:22  Omega = 2126


Monday, August 24, 2020, 11:22

 The current was reduced 0.4 A to 517.0 A

Monday, August 24, 2020, 11:25  Omega = 2123 °C


Monday, August 24, 2020, 11:26

 The current was reduced 0.4 A to 516.6 A 

Monday, August 24, 2020, 11:30  Omega = 2109 °C


Monday, August 24, 2020, 11:30 

 The current was reduced 0.4 A to 516.2 A

Monday, August 24, 2020, 11:36  Omega = 2100 °C


Monday, August 24, 2020, 11:37

  The current was reduced 0.4 A to 516.0 A

TGTH = 7.5 V, 512.9 A

Omega = 2095 °C


Monday, August 24, 2020, 14:17

Voltage dropped and later on increased 

TGHT = 7.7 V, 517.5 A

Omega = 2120 °C 


Monday, August 24, 2020, 14:18

 The current was reduced 0.4 A to 515.6 A

TGHT = 7.6 V, 509.4 A

Monday, August 24, 2020, 14:20  Omega = 2125 °C


Monday, August 24, 2020, 14:20

The current was reduced 0.4 A to 515.2 A

Monday, August 24, 2020, 14:22  Omega = 2122 °C


Monday, August 24, 2020, 14:22

 The current was reduced 0.4 A to 514.8 A

Monday, August 24, 2020, 14:29  Omega = 2116 °C


Monday, August 24, 2020, 15:27

The voltage dropped as well as the temperature

TGHT = 7.5 V, 512.5 A 

Monday, August 24, 2020, 15:28 Omega = 2095 °C


Monday, August 24, 2020, 22:06

TGHT = 7.6 V, 515.9 A 

Omega = 2105 °C


Tuesday, August 25, 2020, 09:07

TGHT = 7.6 V, 519.13 A

Omega = 2102 °C 


Tuesday, August 25, 2020, 13:02

TGHT = 7.6 V, 518.0 A

Omega = 2116 °C

IGP1 = 3e-7 Torr


Tuesday, August 25, 2020, 13:04 

Starting ramp down to 0 A at 5 A/min 

Entry  Thursday, September 17, 2020, 16:11, Marla Cervantes, Empty, 44139-9, LP-SIS, Done, TaC coating/sintering 

 Thursday, September 17, 2020, 16:10

An LP-SIS was wrapped with 3 Ta layers, and installed in the EVAP2

Desired temperature= 1900 C, Omega Slope = 0.990


Friday, September 18, 2020, 10:56

IGP1 = 4.4e-7 Torr 

Leak check performed, no leak observed


Friday, September 18, 2020, 11:16

Power supplies on.

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Autoramp at 0.5A/min to 400A on TGHT and 230A on TBHT


 Friday, September 18, 2020, 11:21

Autoramp paused because, TBHT is not ramping

Ramping manually current to 10 A in 0.5 A steps


Friday, September 18, 2020, 11:38

Restarted autoramp  (Autoramp at 0.5A/min to 400A on TGHT and 230A on TBHT)


Friday, September 18, 2020, 22:50

IGP1 = 2.04e-6 Torr 

TGHT = 5 V, 322.8 A

TBHT = 4 V, 233.1 A

Omega = 1459 °C

Autoramp changed to 0.2 A/min to 450 A


Saturday, September 19, 2020, 10:49

IGP1 = 8e-7 Torr

TGHT = 7.3 V, 449.1 A

TBHT = 4 V, 233.1 A

Omega = 1789 degC


 Saturday, September 19, 2020, 13:25

IGP1 = 6.5 e-7 Torr

TGHT  7.2 V, 447.975 A

TBHT = 4.08 V, 233.09 A

Omega = 1785 °C


Saturday, September 19, 2020, 13:26

Starting ramp down at Commence cooling at -2 A/min for TGHT and -1 A/min for TBHT 


Monday, September 21, 2020, 09:16

Turning off pumps 


Monday, September 21, 2020, 16:47

EVAP2 was vented with air and the tantalum oven was removed, the coating seems sintered. 

Entry  Tuesday, November 24, 2020, 12:56, Marla Cervantes, , 44139-8-SK , TARGET BOAT, Done, Graphite casting conditioning 2020-11-24-IGP1.JPG2020-11-24IGP1-zoom_out.png2020-11-24-IGP1-stable.JPG2020-11-24-ConditioningProcess.JPG

Tuesday, November 24, 2020, 09:23

A batch of 60 discs of 18 mm diameter were loaded in a tantalum tube. The tantalum tube was wrapped with 3 layers of Ta foil for heat shielding and mounted in the EVAP2. EVAP2 pumped down overnight and Aaron made a leak test this morning (elog 524). 

The target material will be heated to 1990 degC. To measure the temperature, the tube has a Ta foil close to the graphite foils and it is held in place with a tantalum spring. Another Ta spring holds the graphite foils in the opposite side of the tube. The temperature will be measured with the Omega pyrometer (slope 0.99)

IGP1 = 6e-7 Torr. Note: The pressure has an usual behavior (see 2020-11-24-IGP1  and 2020-11-24IGP1-zoom out). After ~9 hrs, the pressure became stable (see 2020-11-24IGP1 -stable)


Tuesday, November 24, 2020, 13:00

IGP1 = 6.7e-7 Torr

Good vacuum of 3e-2 Torr and Bad vacuum 5e-2 Torr

The autoramp is set to 80 A at 1 A each 10 s 


 Tuesday, November 24, 2020, 13:43

IGP1 = 2.7e-5 Torr

TGHT = 1.13 V 80.5 A

Autoramp is set to to 100 A at 1 A each 20 s


Tuesday, November 24, 2020, 13:57 

IGP1 = 2.5e-5 Torr and going down

TGHT = 100.2 A, 1.47 V

Autoramp is set to to 120 A at 1 A each 20 s


Tuesday, November 24, 2020, 14:06 

IGP1 = 2.09e-5 Torr

TGHT = 1.6 v, 122 A

Autoramp is set to 200 A at 2 A each 10 s


Tuesday, November 24, 2020, 14:18 IGP1 = 5.4e-5 Torr

IGP1 = 1.5e-5 Torr

TGHT = 2.9 V, 200.5 A

Omega = 1123 °C

Autoramp is set to 450 A, conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Tuesday, November 24, 2020, 14:45

The autoramp was stopped at 424 A 

TGHT = 421.65 A, 8.353 V

IGP1= 2.5e-5 Torr and going down

Omega 2020 degC

The TGHT current was reduced to 420 A (8.27 V) and the temperature reduced to 2007 degC


Tuesday, November 24, 2020, 21:03

IGP1 = 2.09e-6 Torr

TGHT = 7.899 V, 421.312 A

Temperature = 1870 degC

Autoramp is set to 0 A at 1 A/min 

Entry  Monday, September 21, 2020, 17:01, Marla Cervantes, , 44139-8-SK, TARGET BOAT, Done, Conditioning graphite target #3 Voltage-Increment.JPGConditioning-C-3.JPG

 Monday, September 21, 2020, 16:50

450 graphite foils coated with graphite slurry were loaded in a tantalum tube, the tantalum tube was wrapped with 3 Ta heat shields and installed in the EVAP, to measure the temperature, a pack of 4 Ta foils were inserted in each side of the tube.

System is currently pumping down. 


 Tuesday, September 22, 2020, 07:54

IGP1 = 2e-6 Torr

 Good vacuum of 3e-2 Torr and Bad vacuum 5e-2 Torr

The autoramp is set to 50 A at 1 A each 10 s 


Tuesday, September 22, 2020, 08:18 

IGP1 = 3.7e-6 Torr

TGHT = .586 V, 50.06 A

Autoramp is set to 80 A same conditions.


 Tuesday, September 22, 2020, 08:26

IGP1 = 0.0006 Torr

TGHT = .97 V 80.3 A

Autoramp is set to to 100 A at 1 A each 20 s


Tuesday, September 22, 2020, 08:45

IGP1 = 0.003 Torr 

TGHT = 1.3 V, 100.5 A

Autoramp is set to 120 A at same conditions 


Tuesday, September 22, 2020, 09:36

IGP1 = 0.0001 torr

TGHT = 1.6 v, 122 A

Autoramp is set to 200 A at 2 A each 10 s 


Tuesday, September 22, 2020, 10:19

IGP1 = 5.4e-5 Torr

TGHT = 2.9 V, 200.5 A

Omega = 1123 °C

AP = 1164 °C 

Autoramp is set to 450 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Tuesday, September 22, 2020, 11:24

TGHT = 447.8 A, 7.4 V

IGP1 =  3.7e-5 Torr

Omega = 1750 °C

AP = 1720.4 °C

Autoramp set to 520 A at same conditions


 Tuesday, September 22, 2020, 11:38

TGHT = 8.9 V, 525.8 A

IGP1 = 4.8e-5 Torr

Omega = 1914 °C

AP = 1835.6 °C

Autoramp set to 560 A at same conditions


Tuesday, September 22, 2020, 12:13

Omega 2038 °C 


Tuesday, September 22, 2020, 12:14

Current manually reduced to 555 A 

TGHT = 9.8 V, 560.8 A

IGP1 = 2.5e-5 Torr

Tuesday, September 22, 2020, 12:17 

Omega = 2030 °C


Tuesday, September 22, 2020, 12:19 

Current manually reduced to 550 A 

TGHT = 9.8 V, 547.8 A

IGP1 = 2.3e-5 Torr

Tuesday, September 22, 2020, 12:27 

Omega = 2027 °C


Tuesday, September 22, 2020, 12:27

Current manually reduced to 540 A 

TGHT = 9.6 V, 541.6 A

IGP1 = 2e-5 Torr


Tuesday, September 22, 2020, 12:34

Voltage suddenly increased!

TGHT = 10.3 V, 533.8 A

IGP1 = 2.9e-5 Torr

Omega = 2129 °C

Current reduced manually to 520 A to compensate the voltage increment 


Tuesday, September 22, 2020, 12:52

Another voltage increment 

TGHT = 9.9 V, 519.75 A

IGP1 = 1.9 e-5 Torr

Omega 2108 °C

Current reduced manually to 500 A to compensate the voltage increment 

Omega = 2070 °C


Tuesday, September 22, 2020, 13:05 

TGHT = 9.4 V, 492.4 A

Omega = 2063 °C


Tuesday, September 22, 2020, 13:08

Another voltage increment! this time it was an spike 


Tuesday, September 22, 2020, 16:13

After 5 hours

IGP1 = 6e-6 Torr

TGHT = 9.5 V, 488 A

Autoramp was set to 0 A at 2 A/min 

Omega = 2044 °C

AP = 2003.7 °C


Wednesday, September 23, 2020, 16:18

EVAP2 vented with air, target removed. 

Entry  Wednesday, September 08, 2021, 12:43, Darwin Ortiz Rosales, , 44139-8-SK, TARGET BOAT, Done, C Conditioning 

 Wednesday, September 08, 2021, 12:36

297 C discs were loaded onto a Ta tube wrapped in 3 Ta heatshields. (10 of which are analysis discs).  They should be the first to be pushed out as they were loaded last.

The discs were loaded upside down to facilitate transfer to final container post conditioning.

a Ta foil disc was placed at the front end and a Ta spring at the back end of the tube.

The weight of the whole system is 254.4 g

Evap 2 was left to reduce pressure overnight.

Target temperature is 2000 C for five hours @ approx 450A

Good vacuum = 3e-2 Torr

Bad vacumm= 5e-2 Torr


 Thursday, September 09, 2021, 08:46IGP1= 7.5 e-07 Torr

Will manually ramp up TGHT to 80 A 


Thursday, September 09, 2021, 09:09 

pressure began to rise at 50A so will leave at 50 A waiting for stabilization.

Current began to shoot up to rapidly, lowered current to 40A.  


Thursday, September 09, 2021, 10:34

At IGP1= 1.3e-4 Torr manually increasing current again 


Thursday, September 09, 2021, 12:52 

IGP1= 8.6e-5 and dropping

TGHT = 60A, 0.87 V

Will begin autoramp to 120A at 1A/min


Thursday, September 09, 2021, 14:06

IGP1= 3.2e-05Torr

TGH T= 120A, 1.9V

Set autoramp to 1A/10s to 200A 


Thursday, September 09, 2021, 14:57

IGP1=  1.5e-05 Torr

TGHT = 200A, 3.4V

Set Autoram to 2A/10s to 450A

OMEGA = 1249 C

 At 258A OMEGA = 1420 C

continue ramp up at 2A/10s to 450

projected 2000 C is 454 A


 

Thursday, September 09, 2021, 16:10 

Tapped up to 470 A and OMEGA 1993C.  Will leave at this current because T may rise.  

 


Thursday, September 09, 2021, 21:21

OMEGA 2011 C

IGP1 = 6.9e-06 Torr

Ramping down @ -1 A/min

 


Thursday, September 09, 2021, 17:27

Temperature kept around 2000 C by reducing current.  It was reduced to 455A and Temperature stabilized .  Time of ramp down will be  21:10 

Entry  Tuesday, March 30, 2021, 19:49, Ferran Boix Pamies, Empty, 44139-7-SK , , Done, Parasitic target thermal tests 20210403_174815.jpg20210403_183102.jpg

 2021-03-30 7:48 Target loaded with parasitic target only. No container. Leaving under vacuum over night.

 2021-03-31 13:43 Leak check performed. Water on. Need to vent system, electric connection disconnected.

 2021-03-31 15:02 First test successfully finished. Venting to introduce container with radiating heating gun.

 2021-04-01 14:58 Vacuum 3.5E-7 torr. Leak check done. Ramping up target heater to 100A at 1A/10s20210403_174815.jpg

 2021-04-01 14:58 Vacuum 5E-7, 100A all ok. Temp foil 24.3DegC. ramping to 500A at 1A/10s.

 2021-04-01 14:58 Temp of foil not increasing much. Probably issue with TC. ramping down at 1A/10s to vent and inspect.

 2021-04-02 11:03 Target reinstalled, foil TC reinstalled. Vacuum 3E-7 torr. Leak check done. Ramping up container to 500A 1A/10s. 

 2021-04-02 13:07 Still isues with TC. Container ramped down at 1A/10s. Venting, brought heat gun to check TC.

 2021-04-02 15:10 TC connection fixed, origin of issues. Vacuum down to 3E-5 torr. Ramping up container to 200A 1A/10s.

 2021-04-02 18:32 TGTH 200A Tc temp 327.5degC. ramping up to 300A. 1A/10s.

 2021-04-02 18:32 TGTH 300A Tc temp 500degC. ramping up to 400A. 1A/10s.

 2021-04-02 19:17 TGTH 400A Tc temp 618degC. ramping down.

 2021-04-03 13:37 Foil was changed, ramped up to 200A at 1A/10s, Temp TC 360degC. Ramping to 300A. Vac 8.6E-6 torr.

 2021-04-03 13:59 300A Temp TC 580degC. Ramping to 500A, 1A/10s. Vac 7.6E-6 torr.

 2021-04-03 14:36 500A Temp TC 836degC. Ramping to 600A, 1A/10s. Vac 9E-6 torr.

 2021-04-03 14:36 600A Temp TC 960degC. Vac 1.1E-5 torr. Ramping down. 

2021-04-03 19:00 After venting an opening the evap2, it was found that remaining from a past heat treatment where on the Tantalum container. The sublimation of the material coated the inner walls of the evap.2. Now cleaned.

 

 

Entry  Wednesday, May 27, 2020, 13:04, Marla Cervantes, , 44139-7-SK, , Done, Conditioning graphite target #2 e-log-484.JPGelog-484-fig2.PNG

 Wednesday, May 27, 2020, 10:22

IGP1 = 3.2e-7 Torr

TGHT = 0.186 V, 0.028 A

The autoramp is set to 50A:

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 10:40

 TGHT = 1.17 V, 50.9 A

PS = 1.21 V, 50 A

IGP1 = 8e-4 Torr and going down

Autoramp is set to 80 A same conditions

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr


Wednesday, May 27, 2020, 12:29

TGHT = 1.59 V, 80.04 A

PS = 1.58 V, 80 A

IGP1 =  2e-4 Torr and going down

Autoramp is set to 100 A,conditions:

1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 12:38

TGHT = 1.97 V, 100.35 A

IGP1 = 4e-4 Torr

Autoramp is set to 120 A,conditions:

1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


 Wednesday, May 27, 2020, 12:48

TGHT = 2.27 V, 119.1 A

IGP1 = 4e-4 Torr

Autoramp is set to 190 A,conditions:

1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 13:03

TGHT = 3.4 V, 191.25 A

IGP1 = 3e-4 Torr

Autoramp is set to 190 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 13:36 

TGHT = 7.8 V, 423 A

IGP1 = 3e-4 Torr

Autoramp is set to 450 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr 


Wednesday, May 27, 2020, 13:43

TGHT = 8.5 V, 451.6 A

IGP1 = 2e-4 Torr

Autoramp is set to 520 A,conditions:

2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr  


Wednesday, May 27, 2020, 14:02 

TGHT = 10.3 V, 508.16 A

Power supply = 10.39 V, 506 A

Omega = 2000 degC

AP = 2046.4 degC


After 3 hours at 2000 degC, the autoramp was set to 0 A,

conditions: -2 A each 10 s.


Note: There was a voltage drop of 0.6 V (fig. elog-484-fig2)

Entry  Saturday, July 25, 2020, 08:58, Darwin Ortiz Rosales, ZrC, 44139-7-SK, , In progress, ZrC for Luca's experiments 

Friday, July 24, 2020, 15:00

Ta tube cotaining 497 ZrC discs wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap 2 was left to pump down over night.


Saturday, July 25, 2020, 08:57

IGP1= 8.7 e-07 Torr

Start ramp at 0.25 A/min to 20 A on TGHT 


Saturday, July 25, 2020, 10:07

IGP1= 2.7e -06 Torr

Set ramp target to 30 A 


Wednesday, July 29, 2020, 13:11 

OMEGA reading 1700 C at 430 A during the night.  It was kept at this temperature for 3.5 hours.  The OMEGA slope was not changed from 0.990

when IGP1 = 1.2 e-06 Torr and stable, cooling was started at -3A/min at 9 am on this day.

IGP1= 2.2 e-07 Torr now at time of dismounting

 

Entry  Friday, October 09, 2020, 09:50, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, Tests, radiation gun for parasitic target 

 2020-10-09 9:48 The target was installed the day before and left pumping over night. IGP1=4.7e-7Torr. leak check when water on, ok. Setting ramp up

 2020-10-09 10:16 Ramping up the target to 50A, 1.5A/30s. All good. Going to 200A same rate.

 2020-10-09 11:11 Target at 200A. Pyrometer 1170degC. ramping to 300A same rate. 

 2020-10-09 11:51 Target at 300A. Pyr. 1510. Ramping to 400A same rate.

 2020-10-09 12:27 Target at 400A. Pyr. 1820. Ramping to 500A same rate.

 2020-10-09 13:01 Target at 500A. Pyr. 2100. Ramping down to 0A 2A/30s.

Entry  Tuesday, October 13, 2020, 11:15, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, foil heating 

 2020-10-13 11:13 Target was left under vacuum over the weekend. IGP1: 1.6e-7T water on- leak check ok. Ramping up 2A/30s to 100A.

 2020-10-13 11:47 All ok at 100A. Ramping up, 1A/10s to 200A.

 2020-10-13 12:08 All ok at 200A. Temp tc on foil 200degC. Ramping up, 1A/10s to 300A.

 2020-10-13 12:08 All ok at 300A. Temp tc on foil 340degC. Ramping up, 1A/10s to 400A.

 2020-10-13 12:48 All ok at 400A. Temp tc on foil 474degC. pyro shows 1050degC Ramping up, 1A/10s to 500A.

 2020-10-13 13:06 All ok at 500A. Temp tc on foil 615degC. pyro shows 1238degC Ramping down, 1A/10s to 0A.

 2020-10-13 17:04 The foil has been replaced due to suspected radiation transparency being the cause of low measured temperatures. A graphite and tantalum pack is now attached. Vacuum is back to IGP1: 9.5e-6T. Ramping up to 100A, 1A/10s.

 2020-10-13 17:31 All ok at 100A. Temp tc on foil 80degC. Ramping up, 1A/10s to 200A.

 2020-10-13 17:31 All ok at 200A. Temp tc on foil 310degC. Ramping up, 1A/10s to 300A.

 2020-10-13 17:31 All ok at 300A. Temp tc on foil 468degC. Ramping up, 1A/10s to 400A.

2020-10-13 17:31 All ok at 400A. Temp tc on foil 598degC. Ramping up, 1A/10s to 500A.

2020-10-13 17:31 All ok at 500A. Temp tc on foil 700degC. Ramping up, 1A/10s to 600A.

2020-10-13 17:31 All ok at 600A. Temp tc on foil 760degC. Ramping down, 1A/20s to 0A.

2020-10-14 17:09 foils for radiation focusing have been replaced and doubled to reduce transmission. IGP1:1.5e-5T , water leak check ok. Ramping up to 100A 1A/10s.

2020-10-14 17:30 All ok at 100A. Temp tc on foil 60degC. Ramping up, 1A/10s to 500A. 

2020-10-14 17:50 All ok at 200A. Temp tc on foil 378degC. 

2020-10-14 18:10 All ok at 300A. Temp tc on foil 550degC. 

2020-10-14 18:10 All ok at 400A. Temp tc on foil 705degC. 

2020-10-14 18:10 All ok at 500A. Temp tc on foil 816degC.Ramping up, 1A/10s to 600A.

2020-10-14 18:10 All ok at 600A. Temp tc on foil 906degC.Ramping up, 1A/10s to 625A.

2020-10-14 18:10 All ok at 625A, IGP1: 1.3e-5T. Temp tc on foil 924degC.Ramping up, 1A/10s to 650A.

2020-10-14 19:21 All ok at 650A. Temp tc on foil 940degC.Ramping down, 1A/10s to 0A. Pyrometer on foil 1200degC

 

Entry  Thursday, October 15, 2020, 18:51, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, heat gun plus parasitic target thermal comissioning. 

 2020-10-15 18:51 : Setup installed during the day. Pumped down to IGP1:1.5e-5T , water leak check ok. Ramping up to 100A. 

 2020-10-15 19:30 : A heating element was showing bad signs and failed very early. ramping down and venting. 

Entry  Tuesday, October 27, 2020, 10:25, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, parasitic target commissioning 

 2020-10-27 10:24 setup introduced yesterday. Pumping over night IGP1: 5.7e-7T. Water leak check ok. Performing heating elements check.

 2020-10-27 10:43 Heating elements check show low cooling. Ramping up target 1A/15s to 200A.

 2020-10-27 11:54 all ok 200A, thermocouples show room temperature on cartridge and heat shield. Ramping up target 2A/10s to 300A.

 2020-10-27 11:54 all ok 300A, thermocouples show 28/25degC. Ramping up target 2A/10s to 400A.

 2020-10-27 11:54 all ok 400A, thermocouples show 36.5/29degC. Ramping up target 2A/10s to 500A.

 2020-10-27 11:54 all ok 500A, thermocouples show 48.9/33degC. Ramping up target 2A/15s to 550A.

 2020-10-27 12:43 all ok 550A, thermocouples show 55/34degC. Ramping up target 2A/15s to 600A.

 2020-10-27 12:43 all ok 600A, thermocouples show 61.5/35.2degC. Ramping up target 2A/15s to 625A.

 2020-10-27 13:14 all ok 625A, thermocouples show 64.6/34.2degC. Ramping up target 2A/15s to 650A.

Entry  Monday, November 02, 2020, 18:32, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, HEA heat treatment 20201104_102925.jpg20201104_144831.jpg

2020-11-02 6:32: roughing on

2020-11-02 7:21: Turbo on for a while, IGP1:1.8e-5T . water leak check ok.

2020-11-02 7:47: IGP1:1e-5T . Ramping up target heater to 200A, 1A/10s.

2020-11-02 7:47: TGHT at 275A, pyrometer at 1300degC. Leaving it hot for 24h.

 2020-11-04 9:06: After 37h treatment, ramping down to 0A.2A/10s.

2020-11-04 9:46: target ramped down. Venting.

2020-11-04 17:30: Big amounts of outgassing non detected in GP1 coated some inner walls in evap2. The walls got cleaned with acetone. All as before now.

 

 20201104_102925.jpg

Entry  Thursday, April 15, 2021, 18:33, Marla Cervantes, Ta, 44139-6-SK, TARGET BOAT, Done, Carbon penetration on Ta Ta-samples_heating.JPG

Thursday, April 15, 2021, 18:24

Tantalum samples were loaded in a tantalum testing tube and installed in the EVAP2 to heat under vacuum for 3 days at 2000 degC (~500A, 4kW).

The temperature is measured with the Omega pyrometer (slope 0.98)

Some of the samples are in contact with graphite and enclosed with Ta caps, the other samples are not in contact with carbon.

The testing tube is wrapped with 3 Ta heat shields and is not TaC coated.


Thursday, April 15, 2021, 18:31

IGP1 = 4.5e-7 Torr

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

The TGHT will be ramped to 500A at 5A/min


Thursday, April 15, 2021, 20:00

Finished ramping

TGHT = 502 A, 8.22 V, Omega 2012 degC


Sunday, April 18, 2021, 20:38

After 3 days at ~2000 degC, TGHT was ramped at -2A/min to 0A

    Reply  Thursday, August 08, 2024, 11:17, Marla Cervantes, C, 44139-5 SK, LP TUBE, Done, Graphite foils conditioning GraphiteFoil-Conditioning-EVAP2.JPG

Aaron Schmidt wrote:

Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.

Wednesday, August 07, 2024, 15:37: TP on.

Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.

Failed to start.


Thursday, August 08, 2024, 10:00: TP started. 

Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.


Thursday, August 08, 2024, 10:43

A cartridge was filled with graphite foils and loaded in an uncoated tantalum tube. The tube was wrapped with four Ta-sheets. A Ta-foil was placed in the tube's right end for measuring the temperature.

Green graphite target characteristics
Number of discs 822
Mass of discs 11.74 g
Mass of loaded cartridge with normal cap and hole-cap 31.1290 g
Mass of tube loaded, w/shields and tantalum cap 250 g

 

Note: A cartridge loaded with graphite foils has not been conditioned before. Thus, there is no reference on what current to use to reach 2000 °C.

The conditioning of a graphite composite target will be used as a reference, but note that the graphite foils are not expected to outgas as the composites since the foils do not contain binders and plasticizers. 

 

Reference: Elog 636  Graphite inside insert Experiment 2 (regular formulation discs)  

 

Initial ramps used in elog 636: 

  • 1A/min to 200A 

  • 0.5A/min while taking temperature readings periodically until 250A 

  • At 250 A will let pressure stabilize and then ramp at 1A/min to 2000C or 480A

  •  

Currently waiting for vacuum to reduce to IGP1= 8.2e-07


Thursday, August 08, 2024, 11:23

 

Slope: 0.98 (same as slope used for tantalum targets since temperature is measured on Ta foil) 


 Friday, August 09, 2024, 08:50

Good vacuum 3e-5 Torr

Bad vacuum 5e-5 Torr

Initial IGP1 = 5.06E-7 Torr

Starting ramp at 1A/min to 200 A


Friday, August 09, 2024, 09:40 Pressure started to rise, but temperature is not within pyrometer range yet. Current 42 A, Voltage 0.5 V

Friday, August 09, 2024, 10:46 Pressure started to reduce (peak 1.4e-5 Torr). Temperature is not within pyrometer range yet Current 100 A, Voltage 1.3 V

Friday, August 09, 2024, 11:28 Temperature started to be detected, but not stable enough. Current 135 A, Voltage 1.9 V

Friday, August 09, 2024, 12:54 Temperature 1129 °C, current 196 A, voltage 3 V.


Friday, August 09, 2024, 12:56

Next ramp 0.5A/min while taking temperature readings periodically until 250A


Friday, August 09, 2024, 14:45

IGP1 = 1.0e-6 Torr

Next ramp 1A/min to 480 A aiming at 2000 °C


Friday, August 09, 2024, 17:13

IGP1 = 1.9e-6 Torr, Current 327A, Voltage 5.3V

Ramp changed to 2A/min to 480 A aiming at 2000 °C


Coolded down after 4 hours at ~2000°C

at -2A/min

Entry  Wednesday, August 14, 2024, 07:23, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems, EVAP2 Calibration - Vanadium  TP-not_speeding_up.JPG

Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on

Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on

    Reply  Wednesday, August 14, 2024, 16:22, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems resolved, EVAP2 Calibration - Vanadium  

Marla Cervantes wrote:

Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on

Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on

Wednesday, August 14, 2024, 10:18

The turbo pump started up normally. System is purging. and tomorrow the target will be heated.