499
|
Tuesday, August 18, 2020, 09:26 |
Marla Cervantes | TaC | 44489-15 | TARGET BOAT | Done | TaC coating/sintering | Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta foil was attached to the end of the tube to be able to measure the temperature during heating
Desired temperature= 1900 C,
Omega Slope set = 0.990,
IGP1 = 3.75e-7 Torr
Autoramp set to TGHT at 0.2 A/min to reach 52 A
Tuesday, August 18, 2020, 13:47
IGP1= 6.8e-7 Torr
TGHT =0 .511 V, 51.3 A
IGP1 = 6.8e-7 Torr
Autoramp set to TGHT at 0.5 A/min to reach 100 A
Tuesday, August 18, 2020, 20:39
IGP1 = 3.3e-7 Torr
Autoramp set to TGHT at 0.5 A/min to reach 430 A
Wednesday, August 19, 2020, 06:57
Autoramp stopped at 402 A
IGP1 = 1.12e-6 Torr
TGHT = 5.6 V, 403.65 A
Autoramp set to TGHT at 1 A/min to reach 500 A
Wednesday, August 19, 2020, 08:59
IGp1 = 1.7e-6 Torr
TGHT = 7.22 V, 500.34 A
After 30 min at 1900 °C, autoramp set to TGHT at -1 A/min to reach 450 A, the ramp will be stopped when the temperature reads 1850 °C
Autoramp stopped at 1845 °C
IGP1 = 1.17e-6 Torr
TGHT = 6.8 V, 472.95 A |
503
|
Sunday, August 30, 2020, 18:28 |
Marla Cervantes | Empty | 44489-13 | | Done | TaC coating/sintering | Sunday, August 30, 2020, 06:47
A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta cap was inserted to the end of the tube to be able to measure the temperature during heating
Desired temperature= 1900 C,
Omega Slope set = 0.990
Sunday, August 30, 2020, 06:48
IGP1 = 3.9e-7 Torr
Autoramp set to 0.5A/min to 400 A
Sunday, August 30, 2020, 18:27
IGP1 8.41e-7 Torr
TGHT = 4.2 V, 327.15 A
Omega = 1367 °C
Sunday, August 30, 2020, 18:49
IGP1 = 9.6e-7 Torr
TGHT = 4.4 V, 337.1 a
Omega = 1402 °C
Sunday, August 30, 2020, 19:25
IGP1 = 9.5e-7 Torr
TGHT = 4.6 A, 347.5 A
Omega = 1472 °C
Autoramp set to 450 A at 0.1A/30s
Sunday, August 30, 2020, 19:59
IGP1 = 8.5e-7 Torr
TGHT = 4.8 V, 360.5 A
Omega = 1510 °C
Sunday, August 30, 2020, 22:07
IGP1 = 7.2e-7 Torr
TGHT = 5.3 V, 392.6 A
Omega = 1675 °C
Sunday, August 30, 2020, 22:16
IGP1 = 7.1e-7 Torr
TGHT = 5.5 V, 403.2 A
Omega = 1678 °C
Autoramp set to 450 at 0.1A/min
Sunday, August 30, 2020, 22:26
IGP1 = 6.9e-7 Torr
TGHT = 5.5 V, 399.15 A
Omega = 1689 °C
Monday, August 31, 2020, 08:08
IGP1 = 4.4e-7 Torr
TGHT = 6.4 V, 453.4
Omega = 1852 °C
Monday, August 31, 2020, 08:12
Autorap set to 0 A at -5 A/min |
500
|
Tuesday, August 18, 2020, 10:41 |
Marla Cervantes | TaC | 44489-11 | | Done | TaC coating/sintering | Thursday, August 19, 2020, 17:28
A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,
a Ta foil was attached to the end of the tube to be able to measure the temperature during heating
Desired temperature= 1900 C,
Omega Slope set = 0.990,
Thursday, August 20, 2020, 17:29
IGP1 = 4.25 e-7 Torr
Autoramp set to 0.5A/min to 400 A
Thursday, August 20, 2020, 20:36
IGP1 = 6.78e-7 Torr
TGHT = 267.7 A, 3.28 V
Autoramp set to 0.4 A/min to 450 A
Friday, August 21, 2020, 10:28
IGP1=7.23e-7 torr
TGHT = 6.3 v, 446.3 A
Omega = 1603 °C
Autoramp set to -5 A/min |
501
|
Saturday, August 22, 2020, 11:44 |
Marla Cervantes | | 44489-11 | | Done | C-Cartridge test#1 | Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC and sintered, then it was loaded with a c-cartridge
Now is currently under vacuum and it will be heated to 2000 °C during 3 days
Saturday, August 22, 2020, 11:43
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
IGP1 = 3.08e-7 Torr
Autoram set to 10A/30 s to 200 A
Saturday, August 22, 2020, 11:59
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
TGHT = 2.36 V, 200.1 A
IGP1 =2.46e-6 Torr
Autoramp set to to 300 A at 5A/30s
Saturday, August 22, 2020, 13:03
TGHT = 7.32 V, 495.3 A
IGP1 = 2.7e-6 Torr
Omega = 2016 °C
AP = 1970.1 °C
Autoramp set to 550 A at 5A/30s
Saturday, August 22, 2020, 13:11
TGHT =7.6 V, 523.2 A
IGP1 = 3.2e-6 Torr
Omega = 2077 °C
Monday, August 24, 2020, 07:59
Voltage increased ~0.2 V while current remained the same indicating an increment in resistance, temperature increment increased accordingly
TGHT = 7.815 V, 520.87 A
Omega = 2126 °C
Monday, August 24, 2020, 08:04
The current was reduced 0.1 A to 519.9
Monday, August 24, 2020, 08:55 Omega = 2112 °C
Monday, August 24, 2020, 09:12
The temperature returned to Omega = 2130 °C
The current was reduced 0.1 A to 519.8
Monday, August 24, 2020, 09:56
TGHT = 7.7 V, 518.3 A
Omega = 2132 °C
Monday, August 24, 2020, 09:59
The current was reduced 0.2 A to 519.6 A
TGHT = 7.7 V, 517.3 A
Monday, August 24, 2020, 10:07 Omega = 2130°C
Monday, August 24, 2020, 10:08
The current was reduced 0.4 A to 519.2 A
TGHT = 7.7 V, 513.5 A
Monday, August 24, 2020, 10:13 Omega = 2129°C
Monday, August 24, 2020, 10:21
Voltage dropped to 7.6 V and temperature reduced to 2105 °C
Monday, August 24, 2020, 10:30
Voltage increased to 7.8 V and temperature increased to 2128 °C
Monday, August 24, 2020, 10:33
The current was reduced 0.4 A to 518.6 A
TGHT = 7.7 V, 513.06 A
Monday, August 24, 2020, 10:38 Omega = 2130 °C
Monday, August 24, 2020, 10:41
The current was reduced 0.4 A to 518.2 A
Monday, August 24, 2020, 10:52 Omega = 2134 °C
Monday, August 24, 2020, 11:13
The current was reduced 0.4 A to 517.8 A
Monday, August 24, 2020, 11:19 Omega = 2128 °C
Monday, August 24, 2020, 11:19
The current was reduced 0.4 A to 517.4 A
Monday, August 24, 2020, 11:22 Omega = 2126
Monday, August 24, 2020, 11:22
The current was reduced 0.4 A to 517.0 A
Monday, August 24, 2020, 11:25 Omega = 2123 °C
Monday, August 24, 2020, 11:26
The current was reduced 0.4 A to 516.6 A
Monday, August 24, 2020, 11:30 Omega = 2109 °C
Monday, August 24, 2020, 11:30
The current was reduced 0.4 A to 516.2 A
Monday, August 24, 2020, 11:36 Omega = 2100 °C
Monday, August 24, 2020, 11:37
The current was reduced 0.4 A to 516.0 A
TGTH = 7.5 V, 512.9 A
Omega = 2095 °C
Monday, August 24, 2020, 14:17
Voltage dropped and later on increased
TGHT = 7.7 V, 517.5 A
Omega = 2120 °C
Monday, August 24, 2020, 14:18
The current was reduced 0.4 A to 515.6 A
TGHT = 7.6 V, 509.4 A
Monday, August 24, 2020, 14:20 Omega = 2125 °C
Monday, August 24, 2020, 14:20
The current was reduced 0.4 A to 515.2 A
Monday, August 24, 2020, 14:22 Omega = 2122 °C
Monday, August 24, 2020, 14:22
The current was reduced 0.4 A to 514.8 A
Monday, August 24, 2020, 14:29 Omega = 2116 °C
Monday, August 24, 2020, 15:27
The voltage dropped as well as the temperature
TGHT = 7.5 V, 512.5 A
Monday, August 24, 2020, 15:28 Omega = 2095 °C
Monday, August 24, 2020, 22:06
TGHT = 7.6 V, 515.9 A
Omega = 2105 °C
Tuesday, August 25, 2020, 09:07
TGHT = 7.6 V, 519.13 A
Omega = 2102 °C
Tuesday, August 25, 2020, 13:02
TGHT = 7.6 V, 518.0 A
Omega = 2116 °C
IGP1 = 3e-7 Torr
Tuesday, August 25, 2020, 13:04
Starting ramp down to 0 A at 5 A/min |
507
|
Thursday, September 17, 2020, 16:11 |
Marla Cervantes | Empty | 44139-9 | LP-SIS | Done | TaC coating/sintering | Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers, and installed in the EVAP2
Desired temperature= 1900 C, Omega Slope = 0.990
Friday, September 18, 2020, 10:56
IGP1 = 4.4e-7 Torr
Leak check performed, no leak observed
Friday, September 18, 2020, 11:16
Power supplies on.
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Autoramp at 0.5A/min to 400A on TGHT and 230A on TBHT
Friday, September 18, 2020, 11:21
Autoramp paused because, TBHT is not ramping
Ramping manually current to 10 A in 0.5 A steps
Friday, September 18, 2020, 11:38
Restarted autoramp (Autoramp at 0.5A/min to 400A on TGHT and 230A on TBHT)
Friday, September 18, 2020, 22:50
IGP1 = 2.04e-6 Torr
TGHT = 5 V, 322.8 A
TBHT = 4 V, 233.1 A
Omega = 1459 °C
Autoramp changed to 0.2 A/min to 450 A
Saturday, September 19, 2020, 10:49
IGP1 = 8e-7 Torr
TGHT = 7.3 V, 449.1 A
TBHT = 4 V, 233.1 A
Omega = 1789 degC
Saturday, September 19, 2020, 13:25
IGP1 = 6.5 e-7 Torr
TGHT 7.2 V, 447.975 A
TBHT = 4.08 V, 233.09 A
Omega = 1785 °C
Saturday, September 19, 2020, 13:26
Starting ramp down at Commence cooling at -2 A/min for TGHT and -1 A/min for TBHT
Monday, September 21, 2020, 09:16
Turning off pumps
Monday, September 21, 2020, 16:47
EVAP2 was vented with air and the tantalum oven was removed, the coating seems sintered. |
525
|
Tuesday, November 24, 2020, 12:56 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Graphite casting conditioning | Tuesday, November 24, 2020, 09:23
A batch of 60 discs of 18 mm diameter were loaded in a tantalum tube. The tantalum tube was wrapped with 3 layers of Ta foil for heat shielding and mounted in the EVAP2. EVAP2 pumped down overnight and Aaron made a leak test this morning (elog 524).
The target material will be heated to 1990 degC. To measure the temperature, the tube has a Ta foil close to the graphite foils and it is held in place with a tantalum spring. Another Ta spring holds the graphite foils in the opposite side of the tube. The temperature will be measured with the Omega pyrometer (slope 0.99)
IGP1 = 6e-7 Torr. Note: The pressure has an usual behavior (see 2020-11-24-IGP1 and 2020-11-24IGP1-zoom out). After ~9 hrs, the pressure became stable (see 2020-11-24IGP1 -stable)
Tuesday, November 24, 2020, 13:00
IGP1 = 6.7e-7 Torr
Good vacuum of 3e-2 Torr and Bad vacuum 5e-2 Torr
The autoramp is set to 80 A at 1 A each 10 s
Tuesday, November 24, 2020, 13:43
IGP1 = 2.7e-5 Torr
TGHT = 1.13 V 80.5 A
Autoramp is set to to 100 A at 1 A each 20 s
Tuesday, November 24, 2020, 13:57
IGP1 = 2.5e-5 Torr and going down
TGHT = 100.2 A, 1.47 V
Autoramp is set to to 120 A at 1 A each 20 s
Tuesday, November 24, 2020, 14:06
IGP1 = 2.09e-5 Torr
TGHT = 1.6 v, 122 A
Autoramp is set to 200 A at 2 A each 10 s
Tuesday, November 24, 2020, 14:18 IGP1 = 5.4e-5 Torr
IGP1 = 1.5e-5 Torr
TGHT = 2.9 V, 200.5 A
Omega = 1123 °C
Autoramp is set to 450 A, conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Tuesday, November 24, 2020, 14:45
The autoramp was stopped at 424 A
TGHT = 421.65 A, 8.353 V
IGP1= 2.5e-5 Torr and going down
Omega 2020 degC
The TGHT current was reduced to 420 A (8.27 V) and the temperature reduced to 2007 degC
Tuesday, November 24, 2020, 21:03
IGP1 = 2.09e-6 Torr
TGHT = 7.899 V, 421.312 A
Temperature = 1870 degC
Autoramp is set to 0 A at 1 A/min |
508
|
Monday, September 21, 2020, 17:01 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Conditioning graphite target #3 | Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite slurry were loaded in a tantalum tube, the tantalum tube was wrapped with 3 Ta heat shields and installed in the EVAP, to measure the temperature, a pack of 4 Ta foils were inserted in each side of the tube.
System is currently pumping down.
Tuesday, September 22, 2020, 07:54
IGP1 = 2e-6 Torr
Good vacuum of 3e-2 Torr and Bad vacuum 5e-2 Torr
The autoramp is set to 50 A at 1 A each 10 s
Tuesday, September 22, 2020, 08:18
IGP1 = 3.7e-6 Torr
TGHT = .586 V, 50.06 A
Autoramp is set to 80 A same conditions.
Tuesday, September 22, 2020, 08:26
IGP1 = 0.0006 Torr
TGHT = .97 V 80.3 A
Autoramp is set to to 100 A at 1 A each 20 s
Tuesday, September 22, 2020, 08:45
IGP1 = 0.003 Torr
TGHT = 1.3 V, 100.5 A
Autoramp is set to 120 A at same conditions
Tuesday, September 22, 2020, 09:36
IGP1 = 0.0001 torr
TGHT = 1.6 v, 122 A
Autoramp is set to 200 A at 2 A each 10 s
Tuesday, September 22, 2020, 10:19
IGP1 = 5.4e-5 Torr
TGHT = 2.9 V, 200.5 A
Omega = 1123 °C
AP = 1164 °C
Autoramp is set to 450 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Tuesday, September 22, 2020, 11:24
TGHT = 447.8 A, 7.4 V
IGP1 = 3.7e-5 Torr
Omega = 1750 °C
AP = 1720.4 °C
Autoramp set to 520 A at same conditions
Tuesday, September 22, 2020, 11:38
TGHT = 8.9 V, 525.8 A
IGP1 = 4.8e-5 Torr
Omega = 1914 °C
AP = 1835.6 °C
Autoramp set to 560 A at same conditions
Tuesday, September 22, 2020, 12:13
Omega 2038 °C
Tuesday, September 22, 2020, 12:14
Current manually reduced to 555 A
TGHT = 9.8 V, 560.8 A
IGP1 = 2.5e-5 Torr
Tuesday, September 22, 2020, 12:17
Omega = 2030 °C
Tuesday, September 22, 2020, 12:19
Current manually reduced to 550 A
TGHT = 9.8 V, 547.8 A
IGP1 = 2.3e-5 Torr
Tuesday, September 22, 2020, 12:27
Omega = 2027 °C
Tuesday, September 22, 2020, 12:27
Current manually reduced to 540 A
TGHT = 9.6 V, 541.6 A
IGP1 = 2e-5 Torr
Tuesday, September 22, 2020, 12:34
Voltage suddenly increased!
TGHT = 10.3 V, 533.8 A
IGP1 = 2.9e-5 Torr
Omega = 2129 °C
Current reduced manually to 520 A to compensate the voltage increment
Tuesday, September 22, 2020, 12:52
Another voltage increment
TGHT = 9.9 V, 519.75 A
IGP1 = 1.9 e-5 Torr
Omega 2108 °C
Current reduced manually to 500 A to compensate the voltage increment
Omega = 2070 °C
Tuesday, September 22, 2020, 13:05
TGHT = 9.4 V, 492.4 A
Omega = 2063 °C
Tuesday, September 22, 2020, 13:08
Another voltage increment! this time it was an spike
Tuesday, September 22, 2020, 16:13
After 5 hours
IGP1 = 6e-6 Torr
TGHT = 9.5 V, 488 A
Autoramp was set to 0 A at 2 A/min
Omega = 2044 °C
AP = 2003.7 °C
Wednesday, September 23, 2020, 16:18
EVAP2 vented with air, target removed. |
555
|
Wednesday, September 08, 2021, 12:43 |
Darwin Ortiz Rosales | | 44139-8-SK | TARGET BOAT | Done | C Conditioning | Wednesday, September 08, 2021, 12:36
297 C discs were loaded onto a Ta tube wrapped in 3 Ta heatshields. (10 of which are analysis discs). They should be the first to be pushed out as they were loaded last.
The discs were loaded upside down to facilitate transfer to final container post conditioning.
a Ta foil disc was placed at the front end and a Ta spring at the back end of the tube.
The weight of the whole system is 254.4 g
Evap 2 was left to reduce pressure overnight.
Target temperature is 2000 C for five hours @ approx 450A
Good vacuum = 3e-2 Torr
Bad vacumm= 5e-2 Torr
Thursday, September 09, 2021, 08:46IGP1= 7.5 e-07 Torr
Will manually ramp up TGHT to 80 A
Thursday, September 09, 2021, 09:09
pressure began to rise at 50A so will leave at 50 A waiting for stabilization.
Current began to shoot up to rapidly, lowered current to 40A.
Thursday, September 09, 2021, 10:34
At IGP1= 1.3e-4 Torr manually increasing current again
Thursday, September 09, 2021, 12:52
IGP1= 8.6e-5 and dropping
TGHT = 60A, 0.87 V
Will begin autoramp to 120A at 1A/min
Thursday, September 09, 2021, 14:06
IGP1= 3.2e-05Torr
TGH T= 120A, 1.9V
Set autoramp to 1A/10s to 200A
Thursday, September 09, 2021, 14:57
IGP1= 1.5e-05 Torr
TGHT = 200A, 3.4V
Set Autoram to 2A/10s to 450A
OMEGA = 1249 C
At 258A OMEGA = 1420 C
continue ramp up at 2A/10s to 450
projected 2000 C is 454 A
Thursday, September 09, 2021, 16:10
Tapped up to 470 A and OMEGA 1993C. Will leave at this current because T may rise.
Thursday, September 09, 2021, 21:21
OMEGA 2011 C
IGP1 = 6.9e-06 Torr
Ramping down @ -1 A/min
Thursday, September 09, 2021, 17:27
Temperature kept around 2000 C by reducing current. It was reduced to 455A and Temperature stabilized . Time of ramp down will be 21:10 |
544
|
Tuesday, March 30, 2021, 19:49 |
Ferran Boix Pamies | Empty | 44139-7-SK | | Done | Parasitic target thermal tests | 2021-03-30 7:48 Target loaded with parasitic target only. No container. Leaving under vacuum over night.
2021-03-31 13:43 Leak check performed. Water on. Need to vent system, electric connection disconnected.
2021-03-31 15:02 First test successfully finished. Venting to introduce container with radiating heating gun.
2021-04-01 14:58 Vacuum 3.5E-7 torr. Leak check done. Ramping up target heater to 100A at 1A/10s
2021-04-01 14:58 Vacuum 5E-7, 100A all ok. Temp foil 24.3DegC. ramping to 500A at 1A/10s.
2021-04-01 14:58 Temp of foil not increasing much. Probably issue with TC. ramping down at 1A/10s to vent and inspect.
2021-04-02 11:03 Target reinstalled, foil TC reinstalled. Vacuum 3E-7 torr. Leak check done. Ramping up container to 500A 1A/10s.
2021-04-02 13:07 Still isues with TC. Container ramped down at 1A/10s. Venting, brought heat gun to check TC.
2021-04-02 15:10 TC connection fixed, origin of issues. Vacuum down to 3E-5 torr. Ramping up container to 200A 1A/10s.
2021-04-02 18:32 TGTH 200A Tc temp 327.5degC. ramping up to 300A. 1A/10s.
2021-04-02 18:32 TGTH 300A Tc temp 500degC. ramping up to 400A. 1A/10s.
2021-04-02 19:17 TGTH 400A Tc temp 618degC. ramping down.
2021-04-03 13:37 Foil was changed, ramped up to 200A at 1A/10s, Temp TC 360degC. Ramping to 300A. Vac 8.6E-6 torr.
2021-04-03 13:59 300A Temp TC 580degC. Ramping to 500A, 1A/10s. Vac 7.6E-6 torr.
2021-04-03 14:36 500A Temp TC 836degC. Ramping to 600A, 1A/10s. Vac 9E-6 torr.
2021-04-03 14:36 600A Temp TC 960degC. Vac 1.1E-5 torr. Ramping down.
2021-04-03 19:00 After venting an opening the evap2, it was found that remaining from a past heat treatment where on the Tantalum container. The sublimation of the material coated the inner walls of the evap.2. Now cleaned.
|
484
|
Wednesday, May 27, 2020, 13:04 |
Marla Cervantes | | 44139-7-SK | | Done | Conditioning graphite target #2 | Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr
TGHT = 0.186 V, 0.028 A
The autoramp is set to 50A:
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 10:40
TGHT = 1.17 V, 50.9 A
PS = 1.21 V, 50 A
IGP1 = 8e-4 Torr and going down
Autoramp is set to 80 A same conditions
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 12:29
TGHT = 1.59 V, 80.04 A
PS = 1.58 V, 80 A
IGP1 = 2e-4 Torr and going down
Autoramp is set to 100 A,conditions:
1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 12:38
TGHT = 1.97 V, 100.35 A
IGP1 = 4e-4 Torr
Autoramp is set to 120 A,conditions:
1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 12:48
TGHT = 2.27 V, 119.1 A
IGP1 = 4e-4 Torr
Autoramp is set to 190 A,conditions:
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 13:03
TGHT = 3.4 V, 191.25 A
IGP1 = 3e-4 Torr
Autoramp is set to 190 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 13:36
TGHT = 7.8 V, 423 A
IGP1 = 3e-4 Torr
Autoramp is set to 450 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 13:43
TGHT = 8.5 V, 451.6 A
IGP1 = 2e-4 Torr
Autoramp is set to 520 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 14:02
TGHT = 10.3 V, 508.16 A
Power supply = 10.39 V, 506 A
Omega = 2000 degC
AP = 2046.4 degC
After 3 hours at 2000 degC, the autoramp was set to 0 A,
conditions: -2 A each 10 s.
Note: There was a voltage drop of 0.6 V (fig. elog-484-fig2) |
492
|
Saturday, July 25, 2020, 08:58 |
Darwin Ortiz Rosales | ZrC | 44139-7-SK | | In progress | ZrC for Luca's experiments | Friday, July 24, 2020, 15:00
Ta tube cotaining 497 ZrC discs wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
good vacuum = 3.00 e-05 Torr
bad vacuum = 5.00 e-05 Torr
Evap 2 was left to pump down over night.
Saturday, July 25, 2020, 08:57
IGP1= 8.7 e-07 Torr
Start ramp at 0.25 A/min to 20 A on TGHT
Saturday, July 25, 2020, 10:07
IGP1= 2.7e -06 Torr
Set ramp target to 30 A
Wednesday, July 29, 2020, 13:11
OMEGA reading 1700 C at 430 A during the night. It was kept at this temperature for 3.5 hours. The OMEGA slope was not changed from 0.990
when IGP1 = 1.2 e-06 Torr and stable, cooling was started at -3A/min at 9 am on this day.
IGP1= 2.2 e-07 Torr now at time of dismounting
|
515
|
Friday, October 09, 2020, 09:50 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | Tests, radiation gun for parasitic target | 2020-10-09 9:48 The target was installed the day before and left pumping over night. IGP1=4.7e-7Torr. leak check when water on, ok. Setting ramp up
2020-10-09 10:16 Ramping up the target to 50A, 1.5A/30s. All good. Going to 200A same rate.
2020-10-09 11:11 Target at 200A. Pyrometer 1170degC. ramping to 300A same rate.
2020-10-09 11:51 Target at 300A. Pyr. 1510. Ramping to 400A same rate.
2020-10-09 12:27 Target at 400A. Pyr. 1820. Ramping to 500A same rate.
2020-10-09 13:01 Target at 500A. Pyr. 2100. Ramping down to 0A 2A/30s. |
516
|
Tuesday, October 13, 2020, 11:15 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | foil heating | 2020-10-13 11:13 Target was left under vacuum over the weekend. IGP1: 1.6e-7T water on- leak check ok. Ramping up 2A/30s to 100A.
2020-10-13 11:47 All ok at 100A. Ramping up, 1A/10s to 200A.
2020-10-13 12:08 All ok at 200A. Temp tc on foil 200degC. Ramping up, 1A/10s to 300A.
2020-10-13 12:08 All ok at 300A. Temp tc on foil 340degC. Ramping up, 1A/10s to 400A.
2020-10-13 12:48 All ok at 400A. Temp tc on foil 474degC. pyro shows 1050degC Ramping up, 1A/10s to 500A.
2020-10-13 13:06 All ok at 500A. Temp tc on foil 615degC. pyro shows 1238degC Ramping down, 1A/10s to 0A.
2020-10-13 17:04 The foil has been replaced due to suspected radiation transparency being the cause of low measured temperatures. A graphite and tantalum pack is now attached. Vacuum is back to IGP1: 9.5e-6T. Ramping up to 100A, 1A/10s.
2020-10-13 17:31 All ok at 100A. Temp tc on foil 80degC. Ramping up, 1A/10s to 200A.
2020-10-13 17:31 All ok at 200A. Temp tc on foil 310degC. Ramping up, 1A/10s to 300A.
2020-10-13 17:31 All ok at 300A. Temp tc on foil 468degC. Ramping up, 1A/10s to 400A.
2020-10-13 17:31 All ok at 400A. Temp tc on foil 598degC. Ramping up, 1A/10s to 500A.
2020-10-13 17:31 All ok at 500A. Temp tc on foil 700degC. Ramping up, 1A/10s to 600A.
2020-10-13 17:31 All ok at 600A. Temp tc on foil 760degC. Ramping down, 1A/20s to 0A.
2020-10-14 17:09 foils for radiation focusing have been replaced and doubled to reduce transmission. IGP1:1.5e-5T , water leak check ok. Ramping up to 100A 1A/10s.
2020-10-14 17:30 All ok at 100A. Temp tc on foil 60degC. Ramping up, 1A/10s to 500A.
2020-10-14 17:50 All ok at 200A. Temp tc on foil 378degC.
2020-10-14 18:10 All ok at 300A. Temp tc on foil 550degC.
2020-10-14 18:10 All ok at 400A. Temp tc on foil 705degC.
2020-10-14 18:10 All ok at 500A. Temp tc on foil 816degC.Ramping up, 1A/10s to 600A.
2020-10-14 18:10 All ok at 600A. Temp tc on foil 906degC.Ramping up, 1A/10s to 625A.
2020-10-14 18:10 All ok at 625A, IGP1: 1.3e-5T. Temp tc on foil 924degC.Ramping up, 1A/10s to 650A.
2020-10-14 19:21 All ok at 650A. Temp tc on foil 940degC.Ramping down, 1A/10s to 0A. Pyrometer on foil 1200degC
|
517
|
Thursday, October 15, 2020, 18:51 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | heat gun plus parasitic target thermal comissioning. | 2020-10-15 18:51 : Setup installed during the day. Pumped down to IGP1:1.5e-5T , water leak check ok. Ramping up to 100A.
2020-10-15 19:30 : A heating element was showing bad signs and failed very early. ramping down and venting. |
520
|
Tuesday, October 27, 2020, 10:25 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | parasitic target commissioning | 2020-10-27 10:24 setup introduced yesterday. Pumping over night IGP1: 5.7e-7T. Water leak check ok. Performing heating elements check.
2020-10-27 10:43 Heating elements check show low cooling. Ramping up target 1A/15s to 200A.
2020-10-27 11:54 all ok 200A, thermocouples show room temperature on cartridge and heat shield. Ramping up target 2A/10s to 300A.
2020-10-27 11:54 all ok 300A, thermocouples show 28/25degC. Ramping up target 2A/10s to 400A.
2020-10-27 11:54 all ok 400A, thermocouples show 36.5/29degC. Ramping up target 2A/10s to 500A.
2020-10-27 11:54 all ok 500A, thermocouples show 48.9/33degC. Ramping up target 2A/15s to 550A.
2020-10-27 12:43 all ok 550A, thermocouples show 55/34degC. Ramping up target 2A/15s to 600A.
2020-10-27 12:43 all ok 600A, thermocouples show 61.5/35.2degC. Ramping up target 2A/15s to 625A.
2020-10-27 13:14 all ok 625A, thermocouples show 64.6/34.2degC. Ramping up target 2A/15s to 650A. |
521
|
Monday, November 02, 2020, 18:32 |
Ferran Boix Pamies | Empty | 44139-7-SK | TARGET BOAT | Done | HEA heat treatment | 2020-11-02 6:32: roughing on
2020-11-02 7:21: Turbo on for a while, IGP1:1.8e-5T . water leak check ok.
2020-11-02 7:47: IGP1:1e-5T . Ramping up target heater to 200A, 1A/10s.
2020-11-02 7:47: TGHT at 275A, pyrometer at 1300degC. Leaving it hot for 24h.
2020-11-04 9:06: After 37h treatment, ramping down to 0A.2A/10s.
2020-11-04 9:46: target ramped down. Venting.
2020-11-04 17:30: Big amounts of outgassing non detected in GP1 coated some inner walls in evap2. The walls got cleaned with acetone. All as before now.
|
548
|
Thursday, April 15, 2021, 18:33 |
Marla Cervantes | Ta | 44139-6-SK | TARGET BOAT | Done | Carbon penetration on Ta | Thursday, April 15, 2021, 18:24
Tantalum samples were loaded in a tantalum testing tube and installed in the EVAP2 to heat under vacuum for 3 days at 2000 degC (~500A, 4kW).
The temperature is measured with the Omega pyrometer (slope 0.98)
Some of the samples are in contact with graphite and enclosed with Ta caps, the other samples are not in contact with carbon.
The testing tube is wrapped with 3 Ta heat shields and is not TaC coated.
Thursday, April 15, 2021, 18:31
IGP1 = 4.5e-7 Torr
Good vacuum = 3e-2 Torr
Bad vacuum = 5e-2Torr
The TGHT will be ramped to 500A at 5A/min
Thursday, April 15, 2021, 20:00
Finished ramping
TGHT = 502 A, 8.22 V, Omega 2012 degC
Sunday, April 18, 2021, 20:38
After 3 days at ~2000 degC, TGHT was ramped at -2A/min to 0A |
669
|
Thursday, August 08, 2024, 11:17 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Done | Graphite foils conditioning |
Aaron Schmidt wrote: |
Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.
Wednesday, August 07, 2024, 15:37: TP on.
Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.
Failed to start.
Thursday, August 08, 2024, 10:00: TP started.
Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.
|
Thursday, August 08, 2024, 10:43
A cartridge was filled with graphite foils and loaded in an uncoated tantalum tube. The tube was wrapped with four Ta-sheets. A Ta-foil was placed in the tube's right end for measuring the temperature.
Green graphite target characteristics
Number of discs |
822 |
Mass of discs |
11.74 g |
Mass of loaded cartridge with normal cap and hole-cap |
31.1290 g |
Mass of tube loaded, w/shields and tantalum cap |
250 g |
Note: A cartridge loaded with graphite foils has not been conditioned before. Thus, there is no reference on what current to use to reach 2000 °C.
The conditioning of a graphite composite target will be used as a reference, but note that the graphite foils are not expected to outgas as the composites since the foils do not contain binders and plasticizers.
Reference: Elog 636 Graphite inside insert Experiment 2 (regular formulation discs)
Initial ramps used in elog 636:
Currently waiting for vacuum to reduce to IGP1= 8.2e-07
Thursday, August 08, 2024, 11:23
Slope: 0.98 (same as slope used for tantalum targets since temperature is measured on Ta foil)
Friday, August 09, 2024, 08:50
Good vacuum 3e-5 Torr
Bad vacuum 5e-5 Torr
Initial IGP1 = 5.06E-7 Torr
Starting ramp at 1A/min to 200 A
Friday, August 09, 2024, 09:40 Pressure started to rise, but temperature is not within pyrometer range yet. Current 42 A, Voltage 0.5 V
Friday, August 09, 2024, 10:46 Pressure started to reduce (peak 1.4e-5 Torr). Temperature is not within pyrometer range yet Current 100 A, Voltage 1.3 V
Friday, August 09, 2024, 11:28 Temperature started to be detected, but not stable enough. Current 135 A, Voltage 1.9 V
Friday, August 09, 2024, 12:54 Temperature 1129 °C, current 196 A, voltage 3 V.
Friday, August 09, 2024, 12:56
Next ramp 0.5A/min while taking temperature readings periodically until 250A
Friday, August 09, 2024, 14:45
IGP1 = 1.0e-6 Torr
Next ramp 1A/min to 480 A aiming at 2000 °C
Friday, August 09, 2024, 17:13
IGP1 = 1.9e-6 Torr, Current 327A, Voltage 5.3V
Ramp changed to 2A/min to 480 A aiming at 2000 °C
Coolded down after 4 hours at ~2000°C
at -2A/min |
670
|
Wednesday, August 14, 2024, 07:23 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems | EVAP2 Calibration - Vanadium | Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on
Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on |
671
|
Wednesday, August 14, 2024, 16:22 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems resolved | EVAP2 Calibration - Vanadium |
Marla Cervantes wrote: |
Tuesday, August 13, 2024, 17:20 Pressure kept increasing when turning the turbo pump on
Tuesday, August 13, 2024, 18:00 Pressure stayed constant when turning the turbo pump on
|
Wednesday, August 14, 2024, 10:18
The turbo pump started up normally. System is purging. and tomorrow the target will be heated.
|
|