295
|
Tuesday, May 10, 2016, 11:57 |
Laura Lambert | | 40282-3 | TARGET BOAT | Done | Conditioning Nb samples for Tobias |
John Wong wrote: |
Laura Lambert wrote: |
Wednesday, May 04, 2016, 13:28
Target boat has a layer of niobium foil on the bottom of the boat.
A niobium foil has been made with slots to hold samples [similar to when sintering endcaps] *See attached photos
Larger niobium samples are placed in the slots, holding in place, to avoid warping; smaller niobium sample sitting inside the boat by itself.
Smaller sample closest to OMEGA IR reading [right side]
Boat is wrapped with 1 large layer of Ta foil, wrapped around the boat 3x, careful to avoid touching samples.
Loaded into evap2 yesterday.
Vacuum pump bearings gone - pump replaced this morning by vacuum group.
Pumping down now...
Friday, May 06, 2016, 13:36
HS water valves opened, no leaks detected.
Tapped up manually to 35A.
IGP1 = 2.4e-7 Torr
Setting auto-ramp rate at 0.2A/min to 250A over the weekend.
Will tap up manually monday to final desired temperature of 1400C.
Monday, May 09, 2016, 09:38
OMEGA = 1128C
IGP1 = 1.3e-7 Torr
TGHT = 250A, 3.7V
Tapping up manually to 1400C...
Monday, May 09, 2016, 14:05
Evap2 has reached ~1405C
TGHT = 341A, 5.34V
IGP1 = 1.9e-7 Torr
Will remain at max setpoints for min 4hrs then initiate cool down.
|
Monday, May 09, 2016, 18:18
TGHT at 341A/5.34V for over 4 hours. Vac stables at 1.78e-7 Torr.
Cooling down at 2A/min
|
Tuesday, May 10, 2016, 08:45
Vented in air and opened up this morning.
Samples look good!
|
|
296
|
Wednesday, May 11, 2016, 17:24 |
John Wong | np-SiC | | TARGET BOAT | Done | Temperature Treament of Nanofiber SiC/PAN | Wednesday, May 11, 2016, 17:15
Nanofiber SiC (~50nm grain size)/PAN was prepared at UBC.
SiC 0.50g, DMF 9.0g, PAN 1.0g, tiny bit of SDS.
The fiber mat was stabilized in air at 250C and then cut into discs, initial mass = 0.1072g
Discs were then bounded with PVA on 9 pieces of rounded graphite foil (green mass gained to 0.6031g)
The stack of naofiber SiC/PAN was loaded on to Ta boated (coated) and wrapped with Ta heat shield.
Chamber is currently being pumped down.
Friday, May 13, 2016, 15:00
TGHT at 390A/6.966V. Temp measured at 1615C.
Will keep at that temperature for a few days.
Monday, May 16, 2016, 15:44
Sample has been heated at ~1600C for 4 days. TGHT at 400A/7.02V.
Cooling down at 2A/min
Tuesday, May 17, 2016, 11:18
Chamber vented. Inspecting samples.
|
|
297
|
Thursday, May 19, 2016, 14:38 |
John Wong | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs | The purpose of this experiment is to determined the limiting operating temperature for Beta-SiC. To do so, samples will be heated in sequence to observe any volatile Si coated on the window. The coating is observed above 1400C for the conventional SiC (mixuture of alpha and beta) and this coating leads to HV shorting problem.
Thursday, May 19, 2016, 14:26
Beta-SiC (size ~1um) slurry was prepared and casted on a graphite foil.
Discs are cut into D-shape
Average thickness (including graphite foil) = 0.349mm
Graphite foil = 0.13mm
Actual SiC thickness = 0.219mm (close to normal SiC thickness)
Samples are loaded into a target boat.
Total discs = 120
Total mass = 14.3507g
Thursday, May 19, 2016, 14:32
Omega slope set to = 1.04
Heat-treatment #1: 1400C
Thursday, May 19, 2016, 17:04
TGHT ramping up to 250A at 0.5A/min
|
|
298
|
Friday, May 20, 2016, 08:54 |
Laura Lambert | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs |
John Wong wrote: |
The purpose of this experiment is to determined the limiting operating temperature for Beta-SiC. To do so, samples will be heated in sequence to observe any volatile Si coated on the window. The coating is observed above 1400C for the conventional SiC (mixuture of alpha and beta) and this coating leads to HV shorting problem.
Thursday, May 19, 2016, 14:26
Beta-SiC (size ~1um) slurry was prepared and casted on a graphite foil.
Discs are cut into D-shape
Average thickness (including graphite foil) = 0.349mm
Graphite foil = 0.13mm
Actual SiC thickness = 0.219mm (close to normal SiC thickness)
Samples are loaded into a target boat.
Total discs = 120
Total mass = 14.3507g
Thursday, May 19, 2016, 14:32
Omega slope set to = 1.04
Heat-treatment #1: 1400C
Thursday, May 19, 2016, 17:04
TGHT ramping up to 250A at 0.5A/min
|
Friday, May 20, 2016, 08:53
IGP1 = 9.2e-6 Torr.
Increasing ramping rate to 1.0A/min up to 250A
Friday, May 20, 2016, 09:17
IGP1 = 2.1e-5 Torr
TGHT = 215A, 3.1V
OMEGA = 1035C
Stopping auto-ramp and tapping up manually...
Friday, May 20, 2016, 12:26
OMEGA slope changed to 1.04
OMEGA reached ~1430C and kept there for ~1hr.
no change. no coating on window observed
tapped up manually to OMEGA =1500C
TGHT = 350A, 5.8V
Friday, May 20, 2016, 14:17
Not much change to window.
Might be beginning of light dusting, hard to tell.
Will be better observed after longer period of time at 1500C
Will remain at 1500C over weekend.
|
|
299
|
Tuesday, May 24, 2016, 11:18 |
John Wong | SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) target discs |
Laura Lambert wrote: |
John Wong wrote: |
The purpose of this experiment is to determined the limiting operating temperature for Beta-SiC. To do so, samples will be heated in sequence to observe any volatile Si coated on the window. The coating is observed above 1400C for the conventional SiC (mixuture of alpha and beta) and this coating leads to HV shorting problem.
Thursday, May 19, 2016, 14:26
Beta-SiC (size ~1um) slurry was prepared and casted on a graphite foil.
Discs are cut into D-shape
Average thickness (including graphite foil) = 0.349mm
Graphite foil = 0.13mm
Actual SiC thickness = 0.219mm (close to normal SiC thickness)
Samples are loaded into a target boat.
Total discs = 120
Total mass = 14.3507g
Thursday, May 19, 2016, 14:32
Omega slope set to = 1.04
Heat-treatment #1: 1400C
Thursday, May 19, 2016, 17:04
TGHT ramping up to 250A at 0.5A/min
|
Friday, May 20, 2016, 08:53
IGP1 = 9.2e-6 Torr.
Increasing ramping rate to 1.0A/min up to 250A
Friday, May 20, 2016, 09:17
IGP1 = 2.1e-5 Torr
TGHT = 215A, 3.1V
OMEGA = 1035C
Stopping auto-ramp and tapping up manually...
Friday, May 20, 2016, 12:26
OMEGA slope changed to 1.04
OMEGA reached ~1430C and kept there for ~1hr.
no change. no coating on window observed
tapped up manually to OMEGA =1500C
TGHT = 350A, 5.8V
Friday, May 20, 2016, 14:17
Not much change to window.
Might be beginning of light dusting, hard to tell.
Will be better observed after longer period of time at 1500C
Will remain at 1500C over weekend.
|
Tuesday, May 24, 2016, 11:15
Sample has been heated over the long weekend. Temp dropped to 1400C. TGHT at 350A/5.78V. Vac at 1.5e-7 Torr.
It is hard to tell if there is any coating on the window. Will increase temperature to 1800C
Tuesday, May 24, 2016, 11:43
Temp at 1620C. TGHT at 440A/7.7V.
At this temperature, the coating would have been seen for the conventional SiC target material. But, no much of change on the window since the TGHT was tapped up from 1400C.
Continue to increase TGHT to reach 1800C
Tuesday, May 24, 2016, 11:58
Temp at 1680C/TGHT 470A/8.4C - a very light film on the window was observed. Not sure if this film was left from previous processes; it is just that the target container is getting very bright and hard to see.
Tuesday, May 24, 2016, 12:15
TGHT at 510A/9.16V - Observed coating on window. Omega got interfered, therefore temp is unknown. But it was read at ~1720C before the window was getting coated and temp started to dropped.
Will leave at this stage for now...
Tuesday, May 24, 2016, 16:57
Window is fully coated. Based on the heating curve, at 500A, the temp should be at ~1900C (wrapped with a layer of heat shield). Temperature reader dropped to1340C due to the coating interference.
Cooling down TGHT at 2A/min. And will exam the materials tomorrow...
|
|
335
|
Monday, October 24, 2016, 17:52 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermo test of np-SiC raw powder | Monday, October 24, 2016, 17:43
Two samples were prepared and loaded into the target boat with 1 layer of heat-shied as shown in the attachment#1.
Ingredients used: np-SiC and very small about of 5% PVA to hold the powder together.
Samples were dried in the oven at 110C before loaded in Evap#2.
After dried:
Sample #1 (larger graphite boat, mass =0.3779) = 0.4259g (PVA mass unknown due to solution leaking out from the boat)
Sample #2 = 0.2306g (with 5% PVA of 0.4111g)
Test temperature at 1600C, expect TGHT to be around 400A.
Monday, October 24, 2016, 17:50
Ramping up TGHT to 300A at 0.5A/min. Vac at 2.3e-6 Torr.
Tuesday, October 25, 2016, 12:59
TGHT reached to 300A and stabilized for 10 hours. OMEGA temp reader at 1150C
Continue to ramp up TGHT
Wednesday, October 26, 2016, 15:49
TGHT was ramped up to 450A/7.91V; the temp readers on MIKON and OMEGA were 1489 and 1535, respectively (see attachment).
The temperature was much lower than the previous two tests (see elog #296 and #335). Not sure why...
Will do composition analysis on the sample...
Cooling down at 2A/min.
|
Attachment 1: Capture.JPG
|
|
Attachment 2: 450A_1500C.JPG
|
|
|
336
|
Tuesday, November 15, 2016, 16:51 |
John Wong | np-SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 | Tuesday, November 15, 2016, 16:48
Three samples were prepared (see my logbook#1 page 3, preparing for carbonization).
One layer of Ta foil was used to wrap around the target boat.
Chamber is currently being pumped down
Wednesday, November 16, 2016, 11:04
Ramping up TGHT at 2A/min, set at 350A.
Desired temperature, ~1530C (similar heating condition as raw npSiC heat treatment, elog ID335)
Thursday, November 17, 2016, 10:09
TGHT reached to 350A/5.80V, stayed for over 20 hours. Temp measured at 1276 C (Mikon) and 1270 (Omega), vac at 6.07e-7 Torr.
Stepping up TGHT to reach the desired temp.
|
|
337
|
Thursday, November 17, 2016, 11:15 |
Laura Lambert | np-SiC | | TARGET BOAT | In progress | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 |
John Wong wrote: |
Tuesday, November 15, 2016, 16:48
Three samples were prepared (see my logbook#1 page 3, preparing for carbonization).
One layer of Ta foil was used to wrap around the target boat.
Chamber is currently being pumped down
Wednesday, November 16, 2016, 11:04
Ramping up TGHT at 2A/min, set at 350A.
Desired temperature, ~1530C (similar heating condition as raw npSiC heat treatment, elog ID335)
Thursday, November 17, 2016, 10:09
TGHT reached to 350A/5.80V, stayed for over 20 hours. Temp measured at 1276 C (Mikon) and 1270 (Omega), vac at 6.07e-7 Torr.
Stepping up TGHT to reach the desired temp.
|
Thursday, November 17, 2016, 11:13
TGHT = 400A, 6.73V
IGP1 = 8.2e-7 Torr
OMEGA = 1385C
MIKRON = 1389C
Tapping up manually to 1500C or a max setpoint of 450A
Thursday, November 17, 2016, 11:56
TGHT = 450A, 7.85V
IGP1 = 1.7e-6 Torr
OMEGA = 1502C
MIKRON = 1510C
Friday, November 18, 2016, 10:08
IGP1 = 5.3e-7 Torr
TGHT = 450A, 7.9V
OMEGA = 1510C
MIKRON = 1515C
Evap2 has remained at max setpoints for 23hrs.
Initiating auto-cool at 2.0A/min
|
|
338
|
Friday, November 18, 2016, 17:28 |
John Wong | np-SiC | | TARGET BOAT | Done | Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 |
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, November 15, 2016, 16:48
Three samples were prepared (see my logbook#1 page 3, preparing for carbonization).
One layer of Ta foil was used to wrap around the target boat.
Chamber is currently being pumped down
Wednesday, November 16, 2016, 11:04
Ramping up TGHT at 2A/min, set at 350A.
Desired temperature, ~1530C (similar heating condition as raw npSiC heat treatment, elog ID335)
Thursday, November 17, 2016, 10:09
TGHT reached to 350A/5.80V, stayed for over 20 hours. Temp measured at 1276 C (Mikon) and 1270 (Omega), vac at 6.07e-7 Torr.
Stepping up TGHT to reach the desired temp.
|
Thursday, November 17, 2016, 11:13
TGHT = 400A, 6.73V
IGP1 = 8.2e-7 Torr
OMEGA = 1385C
MIKRON = 1389C
Tapping up manually to 1500C or a max setpoint of 450A
Thursday, November 17, 2016, 11:56
TGHT = 450A, 7.85V
IGP1 = 1.7e-6 Torr
OMEGA = 1502C
MIKRON = 1510C
Friday, November 18, 2016, 10:08
IGP1 = 5.3e-7 Torr
TGHT = 450A, 7.9V
OMEGA = 1510C
MIKRON = 1515C
Evap2 has remained at max setpoints for 23hrs.
Initiating auto-cool at 2.0A/min
|
Friday, November 18, 2016, 17:27
The heat treatment of the fiber mats is done.
Analyzing steps...
|
|
339
|
Tuesday, November 22, 2016, 15:58 |
Laura Lambert | Nb | 40282-3 | TARGET BOAT | Done | Conditioning Nb samples for Doug | Tuesday, November 22, 2016, 15:53
Target boat has a layer of niobium foil on the bottom of the boat.
A niobium foil has been made with slots to hold samples [similar to when sintering endcaps] *See attached photos
Niobium samples are placed in slots, holding in place, to avoid warping.
Smaller samples closest to MIKRON IR reading [left side]
Boat is wrapped with 1 large layer of Ta foil, wrapped around the boat 3x, careful to avoid touching samples.
Loaded into evap2 today.
Pumping down now...
Wednesday, November 23, 2016, 11:45
HS water valves opened, no leaks detected.
Tapped up manually to 35A.
IGP1 = 6.4e-7 Torr
Setting auto-ramp rate at 0.2A/min to max setpoint of 250A.
Will tap up manually to final desired temperature of 1400C.
Wednesday, November 23, 2016, 13:17
IGP1 = 5.9e-7
TGHT = 66A, 0.51V
Vacuum stable.
Increasing ramping rate to 1.0A/min
Thursday, November 24, 2016, 08:46
IGP1 = 3.9e-7 Torr
TGHT = 250A, 3.41V *NOTE: the current set reads 243.8A but the readout is 250A
OMEGA = 1013C
MIKRON has no reading yet
Tapping up manually to 1400C
Thursday, November 24, 2016, 15:42
Samples have remained at ~1400C for 5hrs.
IGP1 = 5.8e-7 Torr
TGHT = 420A, 6.5V
OMEGA = 1410C
MIKRON = 1420C
Initiating auto-cool at 2.0A/min
Friday, November 25, 2016, 11:39
Vented in air and opened up this morning.
Samples look good!
|
Attachment 1: samples.jpg
|
|
Attachment 2: evap2.jpg
|
|
Attachment 3: heating_up.xlsx
|
Attachment 4: visual_of_MIKRON_pointing_at_samples.JPG
|
|
|
344
|
Friday, February 03, 2017, 14:18 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems | Sintering TaC coating on Ta endcaps and springs | Friday, February 03, 2017, 14:17
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]
There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber is currently being pumped down.
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
OMEGA slope = 0.98
Monday, February 06, 2017, 09:29
Power outage this weekend and evap2 tripped off.
Re-pumping down now...
Tuesday, February 07, 2017, 08:54
HS water valves opened, no leaks detected.
IGP1 = 1.9e-7 Torr
Tapped up manually to 35A
Vacuum stable.
IGP1 = 2.0e-7 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.
Final desired temperature = 1800C
Wednesday, February 08, 2017, 09:52
IGP1 = 2.98e-7 Torr
TGHT = 325A, 3.5V
Vacuum stable.
Increasing ramping rate to 1.0A/min
Wednesday, February 08, 2017, 11:46
IGP1 = 6.3e-7 Torr
TGHT = 433A, 4.89V
Increasing max setpoint to TGHT = 500A
OMEGA has still yet to show a temperature...should be reading points at this high in current
Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...
Wednesday, February 08, 2017, 16:03
IGP1 = 4e-7 Torr
TGHT = 500A, 5.75V
OMEGA still not reading
Initiating auto-cool at -2A/min
Will update elog with more details tomorrow
Thursday, February 09, 2017, 10:52
Evap2 was cooled down and opened up this morning.
Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.
Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.
A lot of power was being lost into the heatshield.
See photos attached of target boat sitting at 500A.
The heatshield is currently being ground down in those two spots to accommodate the target boat.
|
Attachment 1: IMG_1526.JPG
|
|
Attachment 2: IMG_1527.JPG
|
|
|
347
|
Thursday, February 09, 2017, 23:28 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermotest: SiC-SiO2-Lys and SiC pellets | Thursday, February 09, 2017, 23:26
There are two types of samples being test for thermal stability:
1. SiC-SiO2-Lys nanofiber mats
2. SiC pellets
(see Lab Book for more info)
Desired temperature: ~1500C
One-Ta heat shield is used, est. TGHT 450A.
Thursday, February 09, 2017, 23:38
TGHT currently at 322A/5.28V, OMEGA 1204C.
Vac 2.9e-6 Torr.
Friday, February 10, 2017, 08:58
TGHT at 400A, temp at 1425C for 8 hours.
Decided to cool down for analysis. Check for carboreduction for SiO2 at 1400C. Then continue to ramp up to 1500C.
Ramping down at 2A/min
Friday, February 10, 2017, 10:47
Rapid out-gas (2.7e-6 to 3.8e-6 Torr) from TGHT 330A until current stopped at 400A (see attachment). Could be the evolution of O2 from SiO2...
|
Attachment 1: striptool_01.JPG
|
|
|
348
|
Tuesday, February 14, 2017, 15:44 |
Laura Lambert | Endcaps | | TARGET BOAT | Problems resolved | Sintering TaC coating on Ta endcaps and springs |
Laura Lambert wrote: |
Friday, February 03, 2017, 14:17
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]
There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber is currently being pumped down.
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
OMEGA slope = 0.98
Monday, February 06, 2017, 09:29
Power outage this weekend and evap2 tripped off.
Re-pumping down now...
Tuesday, February 07, 2017, 08:54
HS water valves opened, no leaks detected.
IGP1 = 1.9e-7 Torr
Tapped up manually to 35A
Vacuum stable.
IGP1 = 2.0e-7 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.
Final desired temperature = 1800C
Wednesday, February 08, 2017, 09:52
IGP1 = 2.98e-7 Torr
TGHT = 325A, 3.5V
Vacuum stable.
Increasing ramping rate to 1.0A/min
Wednesday, February 08, 2017, 11:46
IGP1 = 6.3e-7 Torr
TGHT = 433A, 4.89V
Increasing max setpoint to TGHT = 500A
OMEGA has still yet to show a temperature...should be reading points at this high in current
Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...
Wednesday, February 08, 2017, 16:03
IGP1 = 4e-7 Torr
TGHT = 500A, 5.75V
OMEGA still not reading
Initiating auto-cool at -2A/min
Will update elog with more details tomorrow
Thursday, February 09, 2017, 10:52
Evap2 was cooled down and opened up this morning.
Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.
Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.
A lot of power was being lost into the heatshield.
See photos attached of target boat sitting at 500A.
The heatshield is currently being ground down in those two spots to accommodate the target boat.
|
Tuesday, February 14, 2017, 15:43
Heatshield was ground back and target boat now fits nicely into heatshield without contact.
|
|
349
|
Tuesday, February 14, 2017, 15:48 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps and springs |
Laura Lambert wrote: |
Laura Lambert wrote: |
Friday, February 03, 2017, 14:17
The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.
The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]
There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber is currently being pumped down.
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
OMEGA slope = 0.98
Monday, February 06, 2017, 09:29
Power outage this weekend and evap2 tripped off.
Re-pumping down now...
Tuesday, February 07, 2017, 08:54
HS water valves opened, no leaks detected.
IGP1 = 1.9e-7 Torr
Tapped up manually to 35A
Vacuum stable.
IGP1 = 2.0e-7 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.
Final desired temperature = 1800C
Wednesday, February 08, 2017, 09:52
IGP1 = 2.98e-7 Torr
TGHT = 325A, 3.5V
Vacuum stable.
Increasing ramping rate to 1.0A/min
Wednesday, February 08, 2017, 11:46
IGP1 = 6.3e-7 Torr
TGHT = 433A, 4.89V
Increasing max setpoint to TGHT = 500A
OMEGA has still yet to show a temperature...should be reading points at this high in current
Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...
Wednesday, February 08, 2017, 16:03
IGP1 = 4e-7 Torr
TGHT = 500A, 5.75V
OMEGA still not reading
Initiating auto-cool at -2A/min
Will update elog with more details tomorrow
Thursday, February 09, 2017, 10:52
Evap2 was cooled down and opened up this morning.
Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.
Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.
A lot of power was being lost into the heatshield.
See photos attached of target boat sitting at 500A.
The heatshield is currently being ground down in those two spots to accommodate the target boat.
|
Tuesday, February 14, 2017, 15:43
Heatshield was ground back and target boat now fits nicely into heatshield without contact.
|
Tuesday, February 14, 2017, 15:44
Boat with endcaps and springs reloaded today and pumped back down this afternoon.
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Vacuum stable.
IGP1 = 3.5e-6 Torr
Initiating auto-ramp at 0.2A/min with a final setpoint of 400A.
Final desired temperature = 1800C
Wednesday, February 15, 2017, 10:24
IGP1 = 7.2e-7 Torr
TGHT = 260A, 3.95V
OMEGA = 1158C
Vacuum stable.
Increasing ramping rate to 1.0A/min.
Wednesday, February 15, 2017, 13:02
IGP1 = 2.0e-6 Torr
TGHT = 400A, 6.67V
OMEGA = 1530C
Increasing final setpoint to 450A
Wednesday, February 15, 2017, 13:55
IGP1 = 2.5e-6 Torr
TGHT =450A, 7.7V
OMEGA = 1640C
Increasing final setpoint to 500A
Wednesday, February 15, 2017, 15:13
IGP1 = 1.8e-6 Torr
TGHT = 500A, 8.59V
OMEGA = 1770C
MIKRON = 1740C
Tapping up manually to ~1800C...
Thursday, February 16, 2017, 09:09
IGP1 = 5.28e-7 Torr
TGHT = 520A, 9.1V
OMEGA = 1821C
Target boat has remained at max setpoints for 17.5hrs.
Initiating auto-cool at 1A/min
Thursday, February 16, 2017, 13:49
Increasing auto-cool to 2.0A/min
Friday, February 17, 2017, 16:00
Vented in air and opened up today.
Endcaps looks good see photos attached
|
Attachment 1: IMG_1542.JPG
|
|
Attachment 2: IMG_1545.JPG
|
|
Attachment 3: IMG_1549.JPG
|
|
Attachment 4: IMG_1552.JPG
|
|
|
351
|
Saturday, March 11, 2017, 11:58 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermo test B3 Pellets | Friday, March 10, 2017, 17:29
Three B3 pellets are loaded into the container for thermo test.
(see lab book1 Pg 26, 28-30 for more detail about the materials)
Desired temp ~1500C; one long-sheet of Ta foil is used, est 400A.
Auto ramping 0.5A/min to 300A first. Check later...
Saturday, March 11, 2017, 11:58
Increased TGHT from 300A to 350A last night at ramping rate of 0.5A/min.
Tapped up further from 350A to 400A, 6.92V (2.8kW), Temp measured at ~1550C.
Pressure peaked at 1.5e-6 Torr and coming down when ramping TGHT from 350A to 400A. (see attachment1)
Will remain at the current. Continue monitoring..
Monday, March 13, 2017, 01:14
Temp was held at 1550C for about 1.5days. Vac stabilized at 3.08e-7 torr. TGHT 400A/6.94V.
Initiated cooling at 1A/min.
Next, Materials inspection.
Monday, March 13, 2017, 11:24
Target has been at room temp for about 4 hours. Venting chamber.
|
Attachment 1: heating_curve_900PSI_pellet.JPG
|
|
|
353
|
Friday, March 31, 2017, 12:22 |
John Wong | np-SiC | | TARGET BOAT | In progress | Thermo test: B3 Pellets (13.3K-PSI) | Friday, March 31, 2017, 12:21
Two compressed pellets loaded into the target boat and wrapped with Ta foil. (see lab book p32 for details).
Chamber is pumping down.
Desired temp 1550C, TGHT expected to be around 400A.
Friday, March 31, 2017, 16:31
Auto-ramp at 0.5A/min to reach 350A.
Saturday, April 01, 2017, 12:30
TGHT reached to 350A/5.7V, temp around 1200C - notice voltage is much lower than previous process (ID 351), possible target/heat shield shorted therefore lower temp observed. (This should not cause any damage to the container.)
Continue to ramp up to 400A. Notice some evolution of gasses similar to the previous process (ID351) during ramping up of TGHT around 220A . (see attachment1)
Saturday, April 01, 2017, 13:52
TGHT reached to 400A/6.7V; temp stabilized at 1400C.
Tap up to 1550, TGHT 456A/8.08V (3.7KW, about 1KW higher than before).
Pressure coming down (see attachment 2)
Hold temp for several days.
Saturday, April 01, 2017, 17:22
Temp went up by 10C. Lowered TGHT to 450A.
|
Attachment 1: heating_curve_00.JPG
|
|
Attachment 2: heating_curve_13PSI_pellets_01.JPG
|
|
|
354
|
Wednesday, April 05, 2017, 15:42 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coating on evap1 target boat | Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
|
355
|
Thursday, April 06, 2017, 08:57 |
Laura Lambert | Empty | | TARGET BOAT | Problems | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Attachment 1: Capture.JPG
|
|
|
356
|
Thursday, April 06, 2017, 11:15 |
Laura Lambert | Empty | | TARGET BOAT | Problems resolved | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Thursday, April 06, 2017, 11:12
Turns out it was just a bad connection.
See attached photos.
|
Attachment 1: IMG_1615.JPG
|
|
Attachment 2: IMG_1611.JPG
|
|
|
357
|
Thursday, April 06, 2017, 13:16 |
Laura Lambert | Empty | 40282-2 | TARGET BOAT | Done | Sintering TaC coating on evap1 target boat |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, April 05, 2017, 15:36
Coated container with TaC coating using spray technique this morning and let dry.
Wrapped with one long layer of Ta heat shield, wrapped around boat 3x
No ends to target boat
Installed in evap2 and pumping down now...
|
Thursday, April 06, 2017, 08:56
Problems with IGP2
Won't turn on, has low voltage output.
See screenshot attached.
|
Thursday, April 06, 2017, 11:12
Turns out it was just a bad connection.
See attached photos.
|
Thursday, April 06, 2017, 13:16
HS water valves opened, no leaks detected.
Tapped up manually to 35A
Waited almost 2hrs
IGP1 = 9.9e-7 Torr
Initiating auto-ramp at 0.2A/min to 400A
Final desired temperature = 1900C
OMEGA slope = 0.98
Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.
Monday, April 10, 2017, 09:26
IGP1 = 1.79e-7 Torr
TGHT = 400A, 6.47V
OMEGA = 1505C
Tapping up manually to 1900C...
Monday, April 10, 2017, 11:46
TGHT tripped off at 410A, ~1530C
Water is still on and good flow.
Vacuum was stable ~1.8e-7 Torr.
No power trips according to controls.
Not sure of reasoning behind trip.
Initially tried tapping back-up, no current was being applied.
Turned off and back on TGHT power supply - this restarted things and now works again.
Have tapped back up to 35A, vacuum still good.
Restarting auto-ramp to 400A at 1.0A/min
Monday, April 10, 2017, 13:13
Vacuum looks good.
IGP1 = 1.1e-7 Torr
TGHT = 127A, 1.30V
Increasing ramping rate to 2.0A/min
Monday, April 10, 2017, 16:08
IGP1 = 1.5e-7 Torr
TGHT = 400A, 6.24V
OMEGA = 1510V
Increasing auto ramp setpoint to 450A at a rate of 0.2A/min
Wednesday, April 12, 2017, 11:06
IGP1 = 2.96e-7 Torr
TGHT = 555A, 9.74V
OMEGA = 1935C
Has remained at max setpoints overnight.
Initiating auto-cool at 2.0A/min
Thursday, April 13, 2017, 11:59
vented in air and opened up this morning.
container looks good.
see photo attached.
|
Attachment 1: IMG_1653.JPG
|
|
|