  295   Tuesday, May 10, 2016, 11:57 Laura Lambert 40282-3TARGET BOATDoneConditioning Nb samples for Tobias

John Wong wrote:

Laura Lambert wrote:

 Wednesday, May 04, 2016, 13:28

Target boat has a layer of niobium foil on the bottom of the boat.

A niobium foil has been made with slots to hold samples [similar to when sintering endcaps] *See attached photos

Larger niobium samples are placed in the slots, holding in place, to avoid warping; smaller niobium sample sitting inside the boat by itself.

Smaller sample closest to OMEGA IR reading [right side]

Boat is wrapped with 1 large layer of Ta foil, wrapped around the boat 3x, careful to avoid touching samples.

Loaded into evap2 yesterday.

Vacuum pump bearings gone - pump replaced this morning by vacuum group.

Pumping down now...


 Friday, May 06, 2016, 13:36

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

IGP1 = 2.4e-7 Torr

Setting auto-ramp rate at 0.2A/min to 250A over the weekend.

Will tap up manually monday to final desired temperature of 1400C.


 Monday, May 09, 2016, 09:38

OMEGA = 1128C

IGP1 = 1.3e-7 Torr

TGHT = 250A, 3.7V

Tapping up manually to 1400C...


 Monday, May 09, 2016, 14:05

Evap2 has reached ~1405C

TGHT = 341A, 5.34V

IGP1 = 1.9e-7 Torr

Will remain at max setpoints for min 4hrs then initiate cool down.


 

 Monday, May 09, 2016, 18:18

TGHT at 341A/5.34V for over 4 hours.  Vac stables at 1.78e-7 Torr.

Cooling down at 2A/min


 

 Tuesday, May 10, 2016, 08:45

Vented in air and opened up this morning.

Samples look good!


 

  296   Wednesday, May 11, 2016, 17:24 John Wongnp-SiC TARGET BOATDoneTemperature Treament of Nanofiber SiC/PAN

Wednesday, May 11, 2016, 17:15

Nanofiber SiC (~50nm grain size)/PAN was prepared at UBC. 

SiC 0.50g, DMF 9.0g, PAN 1.0g, tiny bit of SDS.

The fiber mat was stabilized in air at 250C and then cut into discs, initial mass = 0.1072g

Discs were then bounded with PVA on 9 pieces of rounded graphite foil  (green mass gained to 0.6031g)

The stack of naofiber SiC/PAN was loaded on to Ta boated (coated) and wrapped with Ta heat shield. 

Chamber is currently being pumped down.


 Friday, May 13, 2016, 15:00

TGHT at 390A/6.966V.  Temp measured at 1615C. 

Will keep at that temperature for a few days.


 Monday, May 16, 2016, 15:44

Sample has been heated at ~1600C for 4 days.  TGHT at 400A/7.02V. 

Cooling down at 2A/min


 Tuesday, May 17, 2016, 11:18

Chamber vented.  Inspecting samples.


 

  297   Thursday, May 19, 2016, 14:38 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

The purpose of this experiment is to determined the limiting operating temperature for Beta-SiC.  To do so, samples will be heated in sequence to observe any volatile Si coated on the window.  The coating is observed above 1400C for the conventional SiC (mixuture of alpha and beta) and this coating leads to HV shorting problem. 


Thursday, May 19, 2016, 14:26

Beta-SiC (size ~1um) slurry was prepared and casted on a graphite foil. 

Discs are cut into D-shape

Average thickness (including graphite foil) = 0.349mm

Graphite foil = 0.13mm

Actual SiC thickness = 0.219mm (close to normal SiC thickness)

Samples are loaded into a target boat.

Total discs = 120

Total mass = 14.3507g


Thursday, May 19, 2016, 14:32

Omega slope set to = 1.04

Heat-treatment #1: 1400C


 Thursday, May 19, 2016, 17:04

TGHT ramping up to 250A at 0.5A/min


 

  298   Friday, May 20, 2016, 08:54 Laura LambertSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

John Wong wrote:

The purpose of this experiment is to determined the limiting operating temperature for Beta-SiC.  To do so, samples will be heated in sequence to observe any volatile Si coated on the window.  The coating is observed above 1400C for the conventional SiC (mixuture of alpha and beta) and this coating leads to HV shorting problem. 


Thursday, May 19, 2016, 14:26

Beta-SiC (size ~1um) slurry was prepared and casted on a graphite foil. 

Discs are cut into D-shape

Average thickness (including graphite foil) = 0.349mm

Graphite foil = 0.13mm

Actual SiC thickness = 0.219mm (close to normal SiC thickness)

Samples are loaded into a target boat.

Total discs = 120

Total mass = 14.3507g


Thursday, May 19, 2016, 14:32

Omega slope set to = 1.04

Heat-treatment #1: 1400C


 Thursday, May 19, 2016, 17:04

TGHT ramping up to 250A at 0.5A/min


 

 Friday, May 20, 2016, 08:53

IGP1 = 9.2e-6 Torr.

Increasing ramping rate to 1.0A/min up to 250A


 Friday, May 20, 2016, 09:17

IGP1 = 2.1e-5 Torr

TGHT = 215A, 3.1V

OMEGA = 1035C

Stopping auto-ramp and tapping up manually...


 Friday, May 20, 2016, 12:26

OMEGA slope changed to 1.04

OMEGA reached ~1430C and kept there for ~1hr.

no change. no coating on window observed

tapped up manually to OMEGA =1500C

TGHT = 350A, 5.8V


 Friday, May 20, 2016, 14:17

Not much change to window.

Might be beginning of light dusting, hard to tell.

Will be better observed after longer period of time at 1500C

Will remain at 1500C over weekend.


 

  299   Tuesday, May 24, 2016, 11:18 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

Laura Lambert wrote:

John Wong wrote:

The purpose of this experiment is to determined the limiting operating temperature for Beta-SiC.  To do so, samples will be heated in sequence to observe any volatile Si coated on the window.  The coating is observed above 1400C for the conventional SiC (mixuture of alpha and beta) and this coating leads to HV shorting problem. 


Thursday, May 19, 2016, 14:26

Beta-SiC (size ~1um) slurry was prepared and casted on a graphite foil. 

Discs are cut into D-shape

Average thickness (including graphite foil) = 0.349mm

Graphite foil = 0.13mm

Actual SiC thickness = 0.219mm (close to normal SiC thickness)

Samples are loaded into a target boat.

Total discs = 120

Total mass = 14.3507g


Thursday, May 19, 2016, 14:32

Omega slope set to = 1.04

Heat-treatment #1: 1400C


 Thursday, May 19, 2016, 17:04

TGHT ramping up to 250A at 0.5A/min


 

 Friday, May 20, 2016, 08:53

IGP1 = 9.2e-6 Torr.

Increasing ramping rate to 1.0A/min up to 250A


 Friday, May 20, 2016, 09:17

IGP1 = 2.1e-5 Torr

TGHT = 215A, 3.1V

OMEGA = 1035C

Stopping auto-ramp and tapping up manually...


 Friday, May 20, 2016, 12:26

OMEGA slope changed to 1.04

OMEGA reached ~1430C and kept there for ~1hr.

no change. no coating on window observed

tapped up manually to OMEGA =1500C

TGHT = 350A, 5.8V


 Friday, May 20, 2016, 14:17

Not much change to window.

Might be beginning of light dusting, hard to tell.

Will be better observed after longer period of time at 1500C

Will remain at 1500C over weekend.


 

 Tuesday, May 24, 2016, 11:15

Sample has been heated over the long weekend.  Temp dropped to 1400C.  TGHT at 350A/5.78V.  Vac at 1.5e-7 Torr.

It is hard to tell if there is any coating on the window.  Will increase temperature to 1800C


 Tuesday, May 24, 2016, 11:43

Temp at 1620C. TGHT at 440A/7.7V. 

At this temperature, the coating would have been seen for the conventional SiC target material.  But, no much of change on the window since the TGHT was tapped up from 1400C.

Continue to increase TGHT to reach 1800C


 Tuesday, May 24, 2016, 11:58

Temp at 1680C/TGHT 470A/8.4C - a very light film on the window was observed.  Not sure if this film was left from previous processes; it is just that the target container is getting very bright and hard to see.


 Tuesday, May 24, 2016, 12:15

TGHT at 510A/9.16V - Observed coating on window.  Omega got interfered, therefore temp is unknown.  But it was read at ~1720C before the window was getting coated and temp started to dropped.

Will leave at this stage for now...


 Tuesday, May 24, 2016, 16:57

Window is fully coated.  Based on the heating curve, at 500A, the temp should be at ~1900C (wrapped with a layer of heat shield).  Temperature reader dropped to1340C due to the coating interference. 

Cooling down TGHT at 2A/min. And will exam the materials tomorrow... 


 

  335   Monday, October 24, 2016, 17:52 John Wongnp-SiC TARGET BOATDoneThermo test of np-SiC raw powder

Monday, October 24, 2016, 17:43

Two samples were prepared and loaded into the target boat with 1 layer of heat-shied as shown in the attachment#1.

Ingredients used: np-SiC and very small about of 5% PVA to hold the powder together. 

Samples were dried in the oven at 110C before loaded in Evap#2. 

After dried:

Sample #1 (larger graphite boat, mass =0.3779) = 0.4259g (PVA mass unknown due to solution leaking out from the boat)

Sample #2 = 0.2306g (with 5% PVA of 0.4111g)

Test temperature at 1600C, expect TGHT to be around 400A. 


Monday, October 24, 2016, 17:50

Ramping up TGHT to 300A at 0.5A/min. Vac at 2.3e-6 Torr. 


 Tuesday, October 25, 2016, 12:59

TGHT reached to 300A and stabilized for 10 hours.  OMEGA temp reader at 1150C

Continue to ramp up TGHT


 Wednesday, October 26, 2016, 15:49

TGHT was ramped up to 450A/7.91V; the temp readers on MIKON and OMEGA were 1489 and 1535, respectively (see attachment).

The temperature was much lower than the previous two tests (see elog #296 and #335).  Not sure why... 

Will do composition analysis on the sample... 

Cooling down at 2A/min.


 

Attachment 1: Capture.JPG
Capture.JPG
Attachment 2: 450A_1500C.JPG
450A_1500C.JPG
  336   Tuesday, November 15, 2016, 16:51 John Wongnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1

Tuesday, November 15, 2016, 16:48

Three samples were prepared  (see my logbook#1 page 3, preparing for carbonization).

One layer of Ta foil was used to wrap around the target boat. 

Chamber is currently being pumped down


 Wednesday, November 16, 2016, 11:04

Ramping up TGHT at 2A/min, set at 350A.

Desired temperature, ~1530C (similar heating condition as raw npSiC heat treatment, elog ID335)


 Thursday, November 17, 2016, 10:09

TGHT reached to 350A/5.80V, stayed for over 20 hours.  Temp measured at 1276 C (Mikon) and 1270 (Omega), vac at 6.07e-7 Torr. 

Stepping up TGHT to reach the desired temp.


 

  337   Thursday, November 17, 2016, 11:15 Laura Lambertnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1

John Wong wrote:

Tuesday, November 15, 2016, 16:48

Three samples were prepared  (see my logbook#1 page 3, preparing for carbonization).

One layer of Ta foil was used to wrap around the target boat. 

Chamber is currently being pumped down


 Wednesday, November 16, 2016, 11:04

Ramping up TGHT at 2A/min, set at 350A.

Desired temperature, ~1530C (similar heating condition as raw npSiC heat treatment, elog ID335)


 Thursday, November 17, 2016, 10:09

TGHT reached to 350A/5.80V, stayed for over 20 hours.  Temp measured at 1276 C (Mikon) and 1270 (Omega), vac at 6.07e-7 Torr. 

Stepping up TGHT to reach the desired temp.


 

 Thursday, November 17, 2016, 11:13

TGHT = 400A, 6.73V

IGP1 = 8.2e-7 Torr

OMEGA = 1385C

MIKRON = 1389C

Tapping up manually to 1500C or a max setpoint of 450A


Thursday, November 17, 2016, 11:56

TGHT = 450A, 7.85V

IGP1 = 1.7e-6 Torr

OMEGA = 1502C

MIKRON = 1510C


 Friday, November 18, 2016, 10:08

IGP1 = 5.3e-7 Torr

TGHT = 450A, 7.9V

OMEGA = 1510C

MIKRON = 1515C

Evap2 has remained at max setpoints for 23hrs.

Initiating auto-cool at 2.0A/min


 

  338   Friday, November 18, 2016, 17:28 John Wongnp-SiC TARGET BOATDoneHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1

Laura Lambert wrote:

John Wong wrote:

Tuesday, November 15, 2016, 16:48

Three samples were prepared  (see my logbook#1 page 3, preparing for carbonization).

One layer of Ta foil was used to wrap around the target boat. 

Chamber is currently being pumped down


 Wednesday, November 16, 2016, 11:04

Ramping up TGHT at 2A/min, set at 350A.

Desired temperature, ~1530C (similar heating condition as raw npSiC heat treatment, elog ID335)


 Thursday, November 17, 2016, 10:09

TGHT reached to 350A/5.80V, stayed for over 20 hours.  Temp measured at 1276 C (Mikon) and 1270 (Omega), vac at 6.07e-7 Torr. 

Stepping up TGHT to reach the desired temp.


 

 Thursday, November 17, 2016, 11:13

TGHT = 400A, 6.73V

IGP1 = 8.2e-7 Torr

OMEGA = 1385C

MIKRON = 1389C

Tapping up manually to 1500C or a max setpoint of 450A


Thursday, November 17, 2016, 11:56

TGHT = 450A, 7.85V

IGP1 = 1.7e-6 Torr

OMEGA = 1502C

MIKRON = 1510C


 Friday, November 18, 2016, 10:08

IGP1 = 5.3e-7 Torr

TGHT = 450A, 7.9V

OMEGA = 1510C

MIKRON = 1515C

Evap2 has remained at max setpoints for 23hrs.

Initiating auto-cool at 2.0A/min


 

 Friday, November 18, 2016, 17:27

The heat treatment of the fiber mats is done. 

Analyzing steps...


 

  339   Tuesday, November 22, 2016, 15:58 Laura LambertNb40282-3TARGET BOATDoneConditioning Nb samples for Doug

Tuesday, November 22, 2016, 15:53

Target boat has a layer of niobium foil on the bottom of the boat.

A niobium foil has been made with slots to hold samples [similar to when sintering endcaps] *See attached photos

Niobium samples are placed in slots, holding in place, to avoid warping.

Smaller samples closest to MIKRON IR reading [left side]

Boat is wrapped with 1 large layer of Ta foil, wrapped around the boat 3x, careful to avoid touching samples.

Loaded into evap2 today.

Pumping down now...


 Wednesday, November 23, 2016, 11:45

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

IGP1 = 6.4e-7 Torr

Setting auto-ramp rate at 0.2A/min to max setpoint of 250A.

Will tap up manually to final desired temperature of 1400C.


 Wednesday, November 23, 2016, 13:17

IGP1 = 5.9e-7

TGHT = 66A, 0.51V

Vacuum stable.

Increasing ramping rate to 1.0A/min


 Thursday, November 24, 2016, 08:46

IGP1 = 3.9e-7 Torr

TGHT = 250A, 3.41V      *NOTE: the current set reads 243.8A but the readout is 250A

OMEGA = 1013C

MIKRON has no reading yet

Tapping up manually to 1400C


 Thursday, November 24, 2016, 15:42

Samples have remained at ~1400C for 5hrs.

IGP1 = 5.8e-7 Torr

TGHT = 420A, 6.5V

OMEGA = 1410C

MIKRON = 1420C

Initiating auto-cool at 2.0A/min


 Friday, November 25, 2016, 11:39

Vented in air and opened up this morning.

Samples look good!


 

Attachment 1: samples.jpg
samples.jpg
Attachment 2: evap2.jpg
evap2.jpg
Attachment 3: heating_up.xlsx
Attachment 4: visual_of_MIKRON_pointing_at_samples.JPG
visual_of_MIKRON_pointing_at_samples.JPG
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs

 Friday, February 03, 2017, 14:17

The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.

The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]

There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber is currently being pumped down.

Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.

OMEGA slope = 0.98


 Monday, February 06, 2017, 09:29

Power outage this weekend and evap2 tripped off.

Re-pumping down now...


 Tuesday, February 07, 2017, 08:54

HS water valves opened, no leaks detected.

IGP1 = 1.9e-7 Torr

Tapped up manually to 35A

Vacuum stable.

IGP1 = 2.0e-7 Torr

Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.

Final desired temperature = 1800C


 Wednesday, February 08, 2017, 09:52

IGP1 = 2.98e-7 Torr

TGHT = 325A, 3.5V

Vacuum stable.

Increasing ramping rate to 1.0A/min


 Wednesday, February 08, 2017, 11:46

IGP1 = 6.3e-7 Torr

TGHT = 433A, 4.89V

Increasing max setpoint to TGHT = 500A

OMEGA has still yet to show a temperature...should be reading points at this high in current

Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...


 Wednesday, February 08, 2017, 16:03

IGP1 = 4e-7 Torr

TGHT = 500A, 5.75V

OMEGA still not reading

Initiating auto-cool at -2A/min

Will update elog with more details tomorrow


 Thursday, February 09, 2017, 10:52

Evap2 was cooled down and opened up this morning.

Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.

Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.

A lot of power was being lost into the heatshield.

See photos attached of target boat sitting at 500A.

The heatshield is currently being ground down in those two spots to accommodate the target boat.


 

Attachment 1: IMG_1526.JPG
IMG_1526.JPG
Attachment 2: IMG_1527.JPG
IMG_1527.JPG
  347   Thursday, February 09, 2017, 23:28 John Wongnp-SiC TARGET BOATDoneThermotest: SiC-SiO2-Lys and SiC pellets

Thursday, February 09, 2017, 23:26

There are two types of samples being test for thermal stability:

1.  SiC-SiO2-Lys nanofiber mats

2.  SiC pellets

(see Lab Book for more info)

Desired temperature: ~1500C

One-Ta heat shield is used, est. TGHT 450A.


 Thursday, February 09, 2017, 23:38

TGHT currently at 322A/5.28V, OMEGA 1204C.

Vac 2.9e-6 Torr.


 Friday, February 10, 2017, 08:58

TGHT at 400A, temp at 1425C for 8 hours.

Decided to cool down for analysis.  Check for carboreduction for SiO2 at 1400C.  Then continue to ramp up to 1500C. 

Ramping down at 2A/min


 Friday, February 10, 2017, 10:47

Rapid out-gas (2.7e-6 to 3.8e-6 Torr) from TGHT 330A until current stopped at 400A (see attachment).  Could be the evolution of O2 from SiO2... 


 

Attachment 1: striptool_01.JPG
striptool_01.JPG
  348   Tuesday, February 14, 2017, 15:44 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on Ta endcaps and springs

Laura Lambert wrote:

 Friday, February 03, 2017, 14:17

The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.

The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]

There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber is currently being pumped down.

Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.

OMEGA slope = 0.98


 Monday, February 06, 2017, 09:29

Power outage this weekend and evap2 tripped off.

Re-pumping down now...


 Tuesday, February 07, 2017, 08:54

HS water valves opened, no leaks detected.

IGP1 = 1.9e-7 Torr

Tapped up manually to 35A

Vacuum stable.

IGP1 = 2.0e-7 Torr

Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.

Final desired temperature = 1800C


 Wednesday, February 08, 2017, 09:52

IGP1 = 2.98e-7 Torr

TGHT = 325A, 3.5V

Vacuum stable.

Increasing ramping rate to 1.0A/min


 Wednesday, February 08, 2017, 11:46

IGP1 = 6.3e-7 Torr

TGHT = 433A, 4.89V

Increasing max setpoint to TGHT = 500A

OMEGA has still yet to show a temperature...should be reading points at this high in current

Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...


 Wednesday, February 08, 2017, 16:03

IGP1 = 4e-7 Torr

TGHT = 500A, 5.75V

OMEGA still not reading

Initiating auto-cool at -2A/min

Will update elog with more details tomorrow


 Thursday, February 09, 2017, 10:52

Evap2 was cooled down and opened up this morning.

Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.

Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.

A lot of power was being lost into the heatshield.

See photos attached of target boat sitting at 500A.

The heatshield is currently being ground down in those two spots to accommodate the target boat.


 

 Tuesday, February 14, 2017, 15:43

Heatshield was ground back and target boat now fits nicely into heatshield without contact.


 

  349   Tuesday, February 14, 2017, 15:48 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on Ta endcaps and springs

Laura Lambert wrote:

Laura Lambert wrote:

 Friday, February 03, 2017, 14:17

The endcaps are stacked together with a punched out disc of graphite foil placed in between each endcap for separation so endcaps won't fuse together.

The end caps are further wrapped in a larger piece of graphite foil to hold together as a tube [same method used in elogID # 158 and 235]

There are also 4 coated springs, 2 on each side of the endcaps tube, with the endcaps tube residing in the middle of the boat.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber is currently being pumped down.

Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.

OMEGA slope = 0.98


 Monday, February 06, 2017, 09:29

Power outage this weekend and evap2 tripped off.

Re-pumping down now...


 Tuesday, February 07, 2017, 08:54

HS water valves opened, no leaks detected.

IGP1 = 1.9e-7 Torr

Tapped up manually to 35A

Vacuum stable.

IGP1 = 2.0e-7 Torr

Initiating auto-ramp at 0.2A/min with a final setpoint of 450A.

Final desired temperature = 1800C


 Wednesday, February 08, 2017, 09:52

IGP1 = 2.98e-7 Torr

TGHT = 325A, 3.5V

Vacuum stable.

Increasing ramping rate to 1.0A/min


 Wednesday, February 08, 2017, 11:46

IGP1 = 6.3e-7 Torr

TGHT = 433A, 4.89V

Increasing max setpoint to TGHT = 500A

OMEGA has still yet to show a temperature...should be reading points at this high in current

Will go down to the lab and follow up on OMEGA settings to confirm everything is set up ok before proceeding to a higher current...


 Wednesday, February 08, 2017, 16:03

IGP1 = 4e-7 Torr

TGHT = 500A, 5.75V

OMEGA still not reading

Initiating auto-cool at -2A/min

Will update elog with more details tomorrow


 Thursday, February 09, 2017, 10:52

Evap2 was cooled down and opened up this morning.

Turns out both legs on the target boat were touching the new heatshield and therefore had been loosing power.

Normally a boat at 500A would read ~1800C, in this scenario at 500A the boat read ~1000C.

A lot of power was being lost into the heatshield.

See photos attached of target boat sitting at 500A.

The heatshield is currently being ground down in those two spots to accommodate the target boat.


 

 Tuesday, February 14, 2017, 15:43

Heatshield was ground back and target boat now fits nicely into heatshield without contact.


 

 Tuesday, February 14, 2017, 15:44

Boat with endcaps and springs reloaded today and pumped back down this afternoon.

HS water valves opened, no leaks detected.

Tapped up manually to 35A

Vacuum stable.

IGP1 = 3.5e-6 Torr

Initiating auto-ramp at 0.2A/min with a final setpoint of 400A.

Final desired temperature = 1800C


 Wednesday, February 15, 2017, 10:24

IGP1 = 7.2e-7 Torr

TGHT = 260A, 3.95V

OMEGA = 1158C

Vacuum stable.

Increasing ramping rate to 1.0A/min.


 Wednesday, February 15, 2017, 13:02

IGP1 = 2.0e-6 Torr

TGHT = 400A, 6.67V

OMEGA = 1530C

Increasing final setpoint to 450A


 Wednesday, February 15, 2017, 13:55

IGP1 = 2.5e-6 Torr

TGHT =450A, 7.7V

OMEGA = 1640C

Increasing final setpoint to 500A


 Wednesday, February 15, 2017, 15:13

IGP1 = 1.8e-6 Torr

TGHT = 500A, 8.59V

OMEGA = 1770C

MIKRON = 1740C

Tapping up manually to ~1800C...


 Thursday, February 16, 2017, 09:09

IGP1 = 5.28e-7 Torr

TGHT = 520A, 9.1V

OMEGA = 1821C

Target boat has remained at max setpoints for 17.5hrs.

Initiating auto-cool at 1A/min


 Thursday, February 16, 2017, 13:49

Increasing auto-cool to 2.0A/min


 Friday, February 17, 2017, 16:00

Vented in air and opened up today.

Endcaps looks good  see photos attached


 

Attachment 1: IMG_1542.JPG
IMG_1542.JPG
Attachment 2: IMG_1545.JPG
IMG_1545.JPG
Attachment 3: IMG_1549.JPG
IMG_1549.JPG
Attachment 4: IMG_1552.JPG
IMG_1552.JPG
  351   Saturday, March 11, 2017, 11:58 John Wongnp-SiC TARGET BOATDoneThermo test B3 Pellets

Friday, March 10, 2017, 17:29

Three B3 pellets are loaded into the container for thermo test. 

(see lab book1 Pg 26, 28-30 for more detail about the materials)

Desired temp ~1500C; one long-sheet of Ta foil is used, est 400A. 

Auto ramping 0.5A/min to 300A first.  Check later...


 Saturday, March 11, 2017, 11:58

Increased TGHT from 300A to 350A last night at ramping rate of 0.5A/min.

Tapped up further from 350A to 400A, 6.92V (2.8kW), Temp measured at ~1550C. 

Pressure peaked at 1.5e-6 Torr and coming down when ramping TGHT from 350A to 400A. (see attachment1)

Will remain at the current.  Continue monitoring..


 Monday, March 13, 2017, 01:14

Temp was held at 1550C for about 1.5days. Vac stabilized at 3.08e-7 torr.  TGHT 400A/6.94V.

Initiated cooling at 1A/min. 

Next, Materials inspection.


 Monday, March 13, 2017, 11:24

Target has been at room temp for about 4 hours.  Venting chamber.


 

Attachment 1: heating_curve_900PSI_pellet.JPG
heating_curve_900PSI_pellet.JPG
  353   Friday, March 31, 2017, 12:22 John Wongnp-SiC TARGET BOATIn progressThermo test: B3 Pellets (13.3K-PSI)

Friday, March 31, 2017, 12:21

Two compressed pellets loaded into the target boat and wrapped with Ta foil.  (see lab book p32 for details).

Chamber is pumping down.

Desired temp 1550C, TGHT expected to be around 400A.


 Friday, March 31, 2017, 16:31

Auto-ramp at 0.5A/min to reach 350A.


 Saturday, April 01, 2017, 12:30

TGHT reached to 350A/5.7V, temp around 1200C - notice voltage is much lower than previous process (ID 351), possible target/heat shield shorted therefore lower temp observed. (This should not cause any damage to the container.) 

Continue to ramp up to 400A.  Notice some evolution of gasses similar to the previous process (ID351) during ramping up of TGHT around 220A . (see attachment1)


 Saturday, April 01, 2017, 13:52

TGHT reached to 400A/6.7V; temp stabilized at 1400C. 

Tap up to 1550, TGHT 456A/8.08V (3.7KW, about 1KW higher than before).

Pressure coming down (see attachment 2)

Hold temp for several days.


 Saturday, April 01, 2017, 17:22

Temp went up by 10C. Lowered TGHT to 450A.


 

Attachment 1: heating_curve_00.JPG
heating_curve_00.JPG
Attachment 2: heating_curve_13PSI_pellets_01.JPG
heating_curve_13PSI_pellets_01.JPG
  354   Wednesday, April 05, 2017, 15:42 Laura LambertEmpty TARGET BOATIn progressSintering TaC coating on evap1 target boat

 Wednesday, April 05, 2017, 15:36

Coated container with TaC coating using spray technique this morning and let dry.

Wrapped with one long layer of Ta heat shield, wrapped around boat 3x

No ends to target boat

Installed in evap2 and pumping down now...


 

  355   Thursday, April 06, 2017, 08:57 Laura LambertEmpty TARGET BOATProblemsSintering TaC coating on evap1 target boat

Laura Lambert wrote:

 Wednesday, April 05, 2017, 15:36

Coated container with TaC coating using spray technique this morning and let dry.

Wrapped with one long layer of Ta heat shield, wrapped around boat 3x

No ends to target boat

Installed in evap2 and pumping down now...


 

 Thursday, April 06, 2017, 08:56

Problems with IGP2

Won't turn on, has low voltage output.

See screenshot attached.


 

Attachment 1: Capture.JPG
Capture.JPG
  356   Thursday, April 06, 2017, 11:15 Laura LambertEmpty TARGET BOATProblems resolvedSintering TaC coating on evap1 target boat

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, April 05, 2017, 15:36

Coated container with TaC coating using spray technique this morning and let dry.

Wrapped with one long layer of Ta heat shield, wrapped around boat 3x

No ends to target boat

Installed in evap2 and pumping down now...


 

 Thursday, April 06, 2017, 08:56

Problems with IGP2

Won't turn on, has low voltage output.

See screenshot attached.


 

 Thursday, April 06, 2017, 11:12

Turns out it was just a bad connection.

See attached photos.


 

Attachment 1: IMG_1615.JPG
IMG_1615.JPG
Attachment 2: IMG_1611.JPG
IMG_1611.JPG
  357   Thursday, April 06, 2017, 13:16 Laura LambertEmpty40282-2TARGET BOATDoneSintering TaC coating on evap1 target boat

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, April 05, 2017, 15:36

Coated container with TaC coating using spray technique this morning and let dry.

Wrapped with one long layer of Ta heat shield, wrapped around boat 3x

No ends to target boat

Installed in evap2 and pumping down now...


 

 Thursday, April 06, 2017, 08:56

Problems with IGP2

Won't turn on, has low voltage output.

See screenshot attached.


 

 Thursday, April 06, 2017, 11:12

Turns out it was just a bad connection.

See attached photos.


 

Thursday, April 06, 2017, 13:16

HS water valves opened, no leaks detected.

Tapped up manually to 35A

Waited almost 2hrs

IGP1 = 9.9e-7 Torr

Initiating auto-ramp at 0.2A/min to 400A

Final desired temperature = 1900C

OMEGA slope = 0.98

Good vac at 3.0e-5, bad vac at 4.0e-5 Torr.


 Monday, April 10, 2017, 09:26

IGP1 = 1.79e-7 Torr

TGHT = 400A, 6.47V

OMEGA = 1505C

Tapping up manually to 1900C...


 Monday, April 10, 2017, 11:46

TGHT tripped off at 410A, ~1530C

Water is still on and good flow.

Vacuum was stable ~1.8e-7 Torr.

No power trips according to controls.

Not sure of reasoning behind trip.

Initially tried tapping back-up, no current was being applied.

Turned off and back on TGHT power supply - this restarted things and now works again.

Have tapped back up to 35A, vacuum still good.

Restarting auto-ramp to 400A at 1.0A/min


 Monday, April 10, 2017, 13:13

Vacuum looks good.

IGP1 = 1.1e-7 Torr

TGHT = 127A, 1.30V

Increasing ramping rate to 2.0A/min


 Monday, April 10, 2017, 16:08

IGP1 = 1.5e-7 Torr

TGHT = 400A, 6.24V

OMEGA = 1510V

Increasing auto ramp setpoint to 450A at a rate of 0.2A/min


 Wednesday, April 12, 2017, 11:06

IGP1 = 2.96e-7 Torr

TGHT = 555A, 9.74V

OMEGA = 1935C

Has remained at max setpoints overnight.

Initiating auto-cool at 2.0A/min


 Thursday, April 13, 2017, 11:59

vented in air and opened up this morning.

container looks good.

see photo attached.


 

Attachment 1: IMG_1653.JPG
IMG_1653.JPG