  Evaporator_2, Page 18 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O#down Source Status Subject
  114   Tuesday, January 28, 2014, 13:09 Laura LambertEmpty40282-4TARGET BOATDoneSintering Ta target boat with TaC coating

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

 Wednesday, January 22, 2014, 18:09

After the boat was heated for ~4hrs, TGHT tripped off on IEVAP2:TBHT2 (see attachment #1, #2). 

Tried clearing the water interlock via EPICS - failed to clear.  Checked the local water valves - ALL VALVES are OPEN 

Tried closing and re-opening the IEVAP2:TBHT2 valves, interlock cleared after a few minutes. 

Maybe a fault in the water signal.  If it happens again, the water signal should be replaced.

Turned back on the power supply - TGHT current/voltage are holding.  Target boat may be OK!

Chamber is a bit warm now.  Will allow time to cool down.

Will vent the chamber tomorrow and the boat will be inspected. 


 

 Thursday, January 23, 2014, 16:18

Chamber vented overnight and was opened up this morning.

Target boat not fully sintered [see attached photos].

Chamber currently being pumped down again in order to continue with sintering TaC coating.

HS cooling water valves were opened, no leaks detected.

Will ramp up to 700A again over the weekend.

 Friday, January 24, 2014, 14:21

Chamber was pumped down to 1.7e-7 Torr.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently sitting at 0A.

Waited 20min, vacuum consistently stable. Auto-ramp initiated at 2.0 A/min and max setpoint to 700A.


 

 Monday, January 27, 2014, 10:05

TGHT reached 700A over the weekend. Measured temp @ 2000C.

TGHT auto-cool inititated at 2.0A/min.


 

 Tuesday, January 28, 2014, 11:53

Chamber cooled down overnight, vented and opened up this morning.

Target boat still has a strip of green, still not fully sintered! [see attached photos].

Chamber currently being pumped down again to attempt sintering - round 3.


 

 Tuesday, January 28, 2014, 13:06

Discussed with Peter. Instead of re-sintering the whole boat by itself, end caps will be inserted for sintering and will be placed further down the boat where the sintering process appears complete.


 

  115   Tuesday, January 28, 2014, 15:46 Laura Lambert 40282-4TARGET BOATFailedSintering TaC coated end caps

 Tuesday, January 28, 2014, 15:43

The target containers end-caps were coated with TaC spray and let dry.

Each cap is wrapped with a small piece of graphite foil and inserted in the target boat. [see attached photo]

The chamber is currently being pumped down overnight.


 Wednesday, January 29, 2014, 11:32

Chamber was pumped down to 1.6e-7 Torr overnight.

HS cooling water valve opened; no leaks detected.

TGHT was stepped up to 35A, voltage max set at 11.05V. TBHT currently at 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 0.2A/min and max setpoint to 580A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 Thursday, January 30, 2014, 09:06

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.4e-7 Torr, TGHT = 283A; stepping ramping rate up to 2.0A/min.


 Thursday, January 30, 2014, 15:53

TGHT reached 580A at 11:45. Measured temp @1650C.

Initiating TGHT auto-cooling now at 2.0A/min.


 Friday, January 31, 2014, 09:04

Chamber cooled down overnight, vented and opened this morning.

Smooth run!


 Friday, January 31, 2014, 11:21

Opened up the end caps, turns out it wasn't such a smooth run...they're not fully sintered 

See attached photo comparison between fully sintered end cap [silver] and end cap from this run [green].

Will re-install and re-sinter next week.


 Wednesday, February 05, 2014, 11:34

End-caps re-installed into EVAP2

Target boat is wrapped with 3 x Ta heat-shield.

Chamber is currently being pumped down.


 Wednesday, February 05, 2014, 14:31

Chamber was pumped down to 5e-7 Torr this morning.

HS cooling water valve opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 11.05V. TBHT currently at 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 0.2A/min and max setpoint to 580A.

Good Vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 Thursday, February 06, 2014, 09:06

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 1.1e-7 Torr, TGHT = 259A; stepping ramping rate up to 2.0A/min.


 Friday, February 07, 2014, 10:10

TGHT reached 580A yesterday. Measured internal temp @ 1500C.

Initiated TGHT auto-cooling this morning at 2.0A/min


 Tuesday, February 11, 2014, 13:30

Vented and opened chamber this morning.

Endcaps are toast  [see pictures attached]

Some of the endcaps broke/fried, others deformed-none useable.

Possibly due to new target boat resulting in more current?

Too much heat with Ta heat shields?

Bad News Bears 


 

  188   Friday, May 01, 2015, 10:50 Laura Lambert 40282-4TARGET BOATIn progressSintering four different ZrC samples

 Friday, May 01, 2015, 10:27

Four different samples of ZrC are loaded into a target boat.

Sample A: ZrC + NO graphite / hand cut

Sample B: ZrC + NO graphite / laser cut

Sample C: ZrC + graphite / hand cut

Sample D: ZrC + graphite / laser cut

A picture showing the different samples is attached [one face-up/ one face-down sample of each side-by-side]

Each sample consists of ~20-25 discs, stacked together and wrapped in graphite sheet [see attachment for photo]

The target boat is wrapped with 3 x Ta heat shield.

EVAP1 pumped down overnight.

HS water valves were opened this morning, no leaks detected.

IGP1 = 5.5e-7 Torr.

Tapping up TGHT manually to 30A...


 Friday, May 01, 2015, 10:54

Tapped up manually to 30A.

Over the course of 20min the vacuum climbed to IGP1 = 1.0 e-5 Torr.

Backed off TGHT to 20A to allow vacuum to stabilize.

Waited ~10min.

Vacuum dropped to IGP1 = 6.5e-6 Torr.

Tapped back-up manually to 30A.

Waited ~45min.

Vacuum stable, IGP1 = 1.2e-5 Torr.

Initiating auto-ramp at 0.1A/min for the TGHT with a max setpoint of 300A / 5.00V.

Good Vacuum = 3.00e-5 Torr. Bad vacuum = 4.00e-5 Torr.


 Monday, May 04, 2015, 11:17

IGP1 = 2e-7 Torr.

TGHT = 274A, 4.75V

Ramp-up limited to 275A due to max voltage being set at 5.0V

Increased max voltage to 10V

Tapping up manually to 1800C and recording data.


 

  189   Monday, May 04, 2015, 17:26 John Wong 40282-4TARGET BOATIn progressSintering four different ZrC samples

Laura Lambert wrote:

 Friday, May 01, 2015, 10:27

Four different samples of ZrC are loaded into a target boat.

Sample A: ZrC + NO graphite / hand cut

Sample B: ZrC + NO graphite / laser cut

Sample C: ZrC + graphite / hand cut

Sample D: ZrC + graphite / laser cut

A picture showing the different samples is attached [one face-up/ one face-down sample of each side-by-side]

Each sample consists of ~20-25 discs, stacked together and wrapped in graphite sheet [see attachment for photo]

The target boat is wrapped with 3 x Ta heat shield.

EVAP1 pumped down overnight.

HS water valves were opened this morning, no leaks detected.

IGP1 = 5.5e-7 Torr.

Tapping up TGHT manually to 30A...


 Friday, May 01, 2015, 10:54

Tapped up manually to 30A.

Over the course of 20min the vacuum climbed to IGP1 = 1.0 e-5 Torr.

Backed off TGHT to 20A to allow vacuum to stabilize.

Waited ~10min.

Vacuum dropped to IGP1 = 6.5e-6 Torr.

Tapped back-up manually to 30A.

Waited ~45min.

Vacuum stable, IGP1 = 1.2e-5 Torr.

Initiating auto-ramp at 0.1A/min for the TGHT with a max setpoint of 300A / 5.00V.

Good Vacuum = 3.00e-5 Torr. Bad vacuum = 4.00e-5 Torr.


 Monday, May 04, 2015, 11:17

IGP1 = 2e-7 Torr.

TGHT = 274A, 4.75V

Ramp-up limited to 275A due to max voltage being set at 5.0V

Increased max voltage to 10V

Tapping up manually to 1800C and recording data.


 

 Monday, May 04, 2015, 17:24

Samples have been heated at 1800C for >2 hours. 

Vaccum at 4.3e-7 Torr, TGHT 475A/9.1V. (Direct Vol = 5.3V).

Initiated cooling down process.  Chamber will be vented tomorrow.


 Tuesday, May 05, 2015, 10:22

TGHT reached to 0A. Chamber has already vented. 

Samples will be taken out for examination.


 

  190   Wednesday, May 06, 2015, 13:59 Laura Lambert 40282-4TARGET BOATDoneSintering two different ZrC samples

 Wednesday, May 06, 2015, 13:54

Two different samples of ZrC are wrapped in graphite sheet and loaded into the target boat.

Sample #1 = ZrC

Sample #2 = ZrC+C

Both samples are hand punched with a 18mm die.

The target boat is wrapped with 3x Ta heat shield.

Pumped down this morning.

HS water valves opened, no leaks detected.

IGP1 = 1.5e-6 Torr.

Tapping up manually to 35A...


 Waited ~50min for vacuum to stabilize.

IGP1 = 5.3e-6 Torr.

Initiating auto-ramp at 0.1A/min for the TGHT with a max setpoint of 275A/ 10V

Good vacuum = 3.00e-5 Torr. Bad vacuum = 4.00e-5 Torr.


Wednesday, May 06, 2015, 15:37  

Increasing ramping rate to 0.2A/min


 Thursday, May 07, 2015, 11:15

Stopping auto ramp.

TGHT = 273A.

Tapping up manually and recording data...

IGP1 = 6.6e-7 Torr.


 Thursday, May 07, 2015, 14:21

Increased max voltage to 14V


 Friday, May 08, 2015, 09:33

EVAP2 reached 2000C yesterday evening and remained at max setpoint overnight.

IGP1 = 3.8e-7 Torr

Initiated auto-cool this morning at 2.0A/min.


 Friday, May 08, 2015, 11:32

IGP1 = 2.1e-7 Torr

TGHT = 221A, 3.21V

OMEGA = 1100C

Increasing auto-cool to 5.0A/min.


 Friday, May 08, 2015, 15:53

Vented in air and opened up this afternoon.

See attachment for data results.


 

  191   Friday, May 08, 2015, 15:56 Laura Lambert 40282-4TARGET BOATDoneSintering four different ZrC samples

John Wong wrote:

Laura Lambert wrote:

 Friday, May 01, 2015, 10:27

Four different samples of ZrC are loaded into a target boat.

Sample A: ZrC + NO graphite / hand cut

Sample B: ZrC + NO graphite / laser cut

Sample C: ZrC + graphite / hand cut

Sample D: ZrC + graphite / laser cut

A picture showing the different samples is attached [one face-up/ one face-down sample of each side-by-side]

Each sample consists of ~20-25 discs, stacked together and wrapped in graphite sheet [see attachment for photo]

The target boat is wrapped with 3 x Ta heat shield.

EVAP1 pumped down overnight.

HS water valves were opened this morning, no leaks detected.

IGP1 = 5.5e-7 Torr.

Tapping up TGHT manually to 30A...


 Friday, May 01, 2015, 10:54

Tapped up manually to 30A.

Over the course of 20min the vacuum climbed to IGP1 = 1.0 e-5 Torr.

Backed off TGHT to 20A to allow vacuum to stabilize.

Waited ~10min.

Vacuum dropped to IGP1 = 6.5e-6 Torr.

Tapped back-up manually to 30A.

Waited ~45min.

Vacuum stable, IGP1 = 1.2e-5 Torr.

Initiating auto-ramp at 0.1A/min for the TGHT with a max setpoint of 300A / 5.00V.

Good Vacuum = 3.00e-5 Torr. Bad vacuum = 4.00e-5 Torr.


 Monday, May 04, 2015, 11:17

IGP1 = 2e-7 Torr.

TGHT = 274A, 4.75V

Ramp-up limited to 275A due to max voltage being set at 5.0V

Increased max voltage to 10V

Tapping up manually to 1800C and recording data.


 

 Monday, May 04, 2015, 17:24

Samples have been heated at 1800C for >2 hours. 

Vaccum at 4.3e-7 Torr, TGHT 475A/9.1V. (Direct Vol = 5.3V).

Initiated cooling down process.  Chamber will be vented tomorrow.


 Tuesday, May 05, 2015, 10:22

TGHT reached to 0A. Chamber has already vented. 

Samples will be taken out for examination.


 

 Friday, May 08, 2015, 15:55

see attachment for data results.


 

  192   Wednesday, May 13, 2015, 16:01 Laura Lambert 40282-4TARGET BOATDoneSintering three different ZrC samples

 Wednesday, May 13, 2015, 15:21

Three different samples of ZrC are loaded into a target boat.

Sample A: ZrC + NO graphite

Sample B: ZrC + graphite [1:0.5 molar ratio]

Sample C: ZrC + graphite [1:1 molar ratio]

Each sample consists of 20 discs, stacked together and wrapped in graphite sheet

The target boat is wrapped with 3 x Ta heat shield.

EVAP2 pumping down overnight...


 Thursday, May 14, 2015, 08:20

HS water valves opened up this a.m, no leaks detected.

IGP1 = 6.6e-7 Torr

Tapping up manually to 35A.

Good Vacuum = 3.00 e-5 Torr. Bad Vacuum = 4.00 e-5 Torr.


Thursday, May 14, 2015, 09:51

Tapped up manually to 30A.

After ~25min, vacuum gone up to IGP1 = 3.5e-5 Torr!

Backed off to 20A.

Waited ~10min. IGP1 = 1.75e-5 Torr.

Tapped back up to 25A.

Waited ~20min, IGP1 = 1.4e-5 Torr.

Tapped up to 30A.

Waited ~20min, IGP1 = 2.2e-5 Torr.

Tapped up to 35A

Waited ~50min, IGP1 = 2.5e-5 Torr.

Continuing manual tap-up...


 Thursday, May 14, 2015, 13:27

IGP1 = 9e-6 Torr

Tapped up to 40A.

Waited ~45min, IGP1 = 1e-5 Torr

Initiating auto-ramp at 0.1A/min for the TGHT with a max setpoint of 275A/ 8.0V


 Friday, May 15, 2015, 08:25

Max setpoints were changed to 400A/ 8.0V last night.

Reached 400A ~4.5hrs ago.

IGP1 = 4.9e-5 Torr

Initiating manual tap up and recording data.


 Friday, May 15, 2015, 15:50

Samples remained at ~2000C for ~4 hours [see attachment for data]

IGP1 = 7.8e-7 Torr.

Initiating auto-cool at 1.0A/min.


 Tuesday, May 19, 2015, 08:27

Vented in air and opened up this morning.


 

  374   Wednesday, June 14, 2017, 15:51 Laura LambertSiC40282-4TARGET BOATIn progressSintering SiC pellets

 Wednesday, June 14, 2017, 15:49

Pellets previously made by Marla and weighed.

Pellets are placed inside a small graphite sample tube.

Graphite sample tube loaded with pellets is loaded into a previously TaC coated boat.

Boat is wrapped with 3x Ta heat shields.

Loaded into evap2.

Chamber currently pumping down.


 Thursday, June 15, 2017, 11:24

HS water valves were opened this morning, no leaks detected.

Tapped up manually to 50A, 0.44V

Vacuum currently rising starting to settle.

IGP1 = 1.51e-6 Torr.

One vacuum stabilizes will initiate auto ramp at a rate of 1.0 A/min up to a final set point of 150 A.

Final desired temperature of 1800C.


 

  375   Friday, June 16, 2017, 10:42 Marla CervantesSiC40282-4TARGET BOATDoneSintering SiC pellets

Laura Lambert wrote:

 Wednesday, June 14, 2017, 15:49

Pellets previously made by Marla and weighed.

Pellets are placed inside a small graphite sample tube.

Graphite sample tube loaded with pellets is loaded into a previously TaC coated boat.

Boat is wrapped with 3x Ta heat shields.

Loaded into evap2.

Chamber currently pumping down.


 Thursday, June 15, 2017, 11:24

HS water valves were opened this morning, no leaks detected.

Tapped up manually to 50A, 0.44V

Vacuum currently rising starting to settle.

IGP1 = 1.51e-6 Torr.

One vacuum stabilizes will initiate auto ramp at a rate of 1.0 A/min up to a final set point of 150 A.

Final desired temperature of 1800C.


 

 Friday, June 16, 2017, 10:37

IGP1 = 7.91e-7 torr.

TGHT = 167 A, 2.3 V.

Tapped up manually to 350A yesterday, remained there overnight.

IGP1 = 4.55e-7 torr

TGHT=350 A, 5.6 V,

Changed slope to 0.98

Checked temperature readings with mikron to confirm slope

Mikron LS = 1260C, RS=1290C

OMEGA= 1295C

Initiating auto ramp at 1.0A/min to a final set point of 450A.

Final desired temperature of 1600C (no longer need to go to 1800C).

*note: graphite sample tube has graphite endcaps inserted


 

  376   Friday, June 16, 2017, 15:14 Laura LambertSiC40282-4TARGET BOATDoneSintering SiC pellets

Marla Cervantes wrote:

Laura Lambert wrote:

 Wednesday, June 14, 2017, 15:49

Pellets previously made by Marla and weighed.

Pellets are placed inside a small graphite sample tube.

Graphite sample tube loaded with pellets is loaded into a previously TaC coated boat.

Boat is wrapped with 3x Ta heat shields.

Loaded into evap2.

Chamber currently pumping down.


 Thursday, June 15, 2017, 11:24

HS water valves were opened this morning, no leaks detected.

Tapped up manually to 50A, 0.44V

Vacuum currently rising starting to settle.

IGP1 = 1.51e-6 Torr.

One vacuum stabilizes will initiate auto ramp at a rate of 1.0 A/min up to a final set point of 150 A.

Final desired temperature of 1800C.


 

 Friday, June 16, 2017, 10:37

IGP1 = 7.91e-7 torr.

TGHT = 167 A, 2.3 V.

Tapped up manually to 350A yesterday, remained there overnight.

IGP1 = 4.55e-7 torr

TGHT=350 A, 5.6 V,

Changed slope to 0.98

Checked temperature readings with mikron to confirm slope

Mikron LS = 1260C, RS=1290C

OMEGA= 1295C

Initiating auto ramp at 1.0A/min to a final set point of 450A.

Final desired temperature of 1600C (no longer need to go to 1800C).

*note: graphite sample tube has graphite endcaps inserted


 

 Friday, June 16, 2017, 15:10

Tapped up manually to 420A and auto ramp at 1.0A/min to 450A.

IGP1= 7.15e-7 torr

TGHT=450 A, 7.85 V

OMEGA = 1605C

Process completed, initiating auto cool at 1.0A/min

Elog entry by Pauline


 Monday, June 19, 2017, 16:18

Vented in air and removed from evap2 this a.m.

Weirdly TGHT had tripped off at 10pm on friday June 16th

TGHT = 58A when it tripped off.

Nothing else tripped.

Power supply was still on.

Water was still running

But, in the epics water control box it showed green boxes for TGHT, HS and CHILLER...but all said trip in yellow next to the boxes...odd...

Also noted, before removing from evap2, noticed both legs were bent and touching heat shield, will look further into this...


 

  432   Thursday, March 07, 2019, 09:22 Darwin Ortiz RosalesEmpty40282-4TARGET BOATDoneTransfer tube TaC coating (Legnaro)

Thursday, March 07, 2019, 09:09

Transfer tube from Legnaro was coated with TaC.

The transfer tube was set in a tantalum boat and wrapped with 3 heat shields,

the legs of the transfer tube were let out of the shielding sheets.

Chamber pump down was started on Wednesday March 06, 2019.

Desired temperature TGHT = 1800 C, Omega slope set = 0.990.

IGP1= 4.48e-07 Torr

Will tap up TGHT manually to 40-50 A and monitor pressure.


 Thursday, March 07, 2019, 10:57

The TGHT current was left at 40 A for 50 min, the pressure achieved was 6.15e-7 Torr

The TGHT was rised to 45 A 11:00 am the pressure rised to 6.18e-7 Torr (11:10am)

The TGHT was rised to 50 A 11:10 am the pressure rised to 6.81e-7 Torr (11:32am)

auto ramp was set to 1 A/min to 300 A

Good vacuum 3e-5 Torr

Bad vaccum 5e-5 Torr

auto ramp was set to 1 A/min to 400 A

auto ramp was set to 1 A/min to 470 A

Final conditions TGHT = 485 A, 8.25V Temperature = 1800 C

The transfer tube stayed at 1800 C for 4 hours

auto ramp was set to -1 A/min to 0 A. 


Friday, March 08, 2019, 16:53 

EVAP2 was vented with air and the transfer tube was unloaded

  451   Wednesday, July 17, 2019, 11:13 Marla CervantesNb40282-4TARGET BOATDoneAnnealing of RRR-Nb test samples

 Wednesday, July 17, 2019, 10:57

Annealing of five RRR Nb samples following cold-working and resistance measurements.  Used to validate computational annealing model developed for SRF studies.  For more information contact Norman Muller, x6398.

Desired temperature 1025 C.

Five Nb samples wrapped with Nb foil were set on a tantalum boat (coated with TaC)

the tantalum boat was wrapped with two tantalum sheets.

The boat was installed in the EVAP2.

The initial vacuum was IGP1 = 1.26e-6 Torr.

Ramping rate 5 A/min to final current of 200 A.


Wednesday, July 17, 2019, 11:18 

At 155 A, the ramping rate was changed to 1 A/min 


Wednesday, July 17, 2019, 11:28 

The ramping was stopped at 167 A.


 Wednesday, July 17, 2019, 11:57

Conditions:

IGP1 = 1.65e-6 Torr


TGHT = 2.54 V, 174.46 A

Temperature ~ 950 C


Wednesday, July 17, 2019, 18:07

IGP1 = 1.16 e-6

TGHT = 3.18 V, 206.7 A

Temperature ~950 C

Cooling ramp 10 A/min 

 Vented with air


Suggestion for future annealing:

  Use tantalum boat without TaC coating.

  465   Monday, November 04, 2019, 14:25 Darwin Ortiz RosalesEndcaps40282-4TARGET BOATDone 

Monday, November 04, 2019, 14:19 

Each endcap is separated with a disc of graphite foil and rolled into packs one pack of 4 and one pack of 8 within a foil envelope in a target boat.

There are also 3 coated springs interspersed.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.99

Will Tap TGHT up to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


 Tuesday, November 05, 2019, 11:30

IGP1 = 9.6e-7 Torr

Autoramp TGHT to 40A at 1A/min


Tuesday, November 05, 2019, 11:44

IGP1= 2.6e-06 Torr

TGHT = 40.8 A, 0.37V

Will leave at 40 A for 1 hour


 Tuesday, November 05, 2019, 12:39

 IGP1=2.5e-6 Torr

TGHT =40.0A, .33V

Start ramping TGHT to 400A at 0.1A/min


Wednesday, November 06, 2019, 09:32

IGP1=7.8e-7 Torr

TGHT = 168.4A, 2.38V

increase ramp speed to 1A/min


 Wednesday, November 06, 2019, 14:07

IGP1= 2.34e-6 Torr

TGHT=400.0 A, 6.98V

set TGHT autoramp to 460A @ 1A/min aiming for 1850C (see attached plot)

 


Wednesday, November 06, 2019, 15:18

OMEGA = 1776 C

TGHT = 460.0A, 8.52V

IGP1= 4.7e-6 Torr

Starting manual tap up to 1810C


Wednesday, November 06, 2019, 15:36

OMEGA=1810 C

TGHT = 468.8A, 8.74V

IGP1=4.14e-6


Wednesday, November 06, 2019, 19:04

OMEGA=1822 C (has been between 1817-1824 C over 3.5 hours )

TGHT=468.8A, 8.67V

IGP1=1.9498e-06 Torr

Start TGHT ramp down at -2A/min


Thursday, November 07, 2019, 09:55

THGT = 0A, 0V overnight

IGP1= 3.2 e-07 Torr

Proceeding with unloading.


End caps looked good for online use.

 

  526   Monday, February 01, 2021, 13:57 Darwin Ortiz RosalesSiC40282-4TARGET BOATDoneSintering of SiC discs for SEM

Monday, February 01, 2021, 13:52  

Ta boat loaded with 20 Disc on either end capped with Ta springs to prevent overexpansion.   discs wrapped Graphite foil and boat wrapped in Ta heat-shields (3 layers).

Sample A on left side and sample B on right side.

Desired temperature= 1800C (expected TGHT 410 A).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap2 left to pump down over night.


 Tuesday, February 02, 2021, 10:01

Pressure stable at IGP1= 7.8e-7 Torr

TGHT autoramp  set to 50 A @ 1/min


Tuesday, February 02, 2021, 13:45

IGP1=3.5e-6 Torr

TGHT =49.9 A, 0.56 V

Ramp at 1A/min to 100A


Wednesday, February 03, 2021, 08:25

IGP1= 5.5 e-07 Torr

TGHT = 100 A, , 1.2 V

Yesterday the camera failed to operate.  Cloud service discontinued.  The TS camera is offline but it is a different provider.  Will start ramping to 400A .

Ramp rate 2A/min


Wednesday, February 03, 2021, 15:55

ramped up to 520 A and 9.1V TGHT

Temperature average 1644 C but suspect actual temperature higher.

Held for 5 hours and started ramp down at -2A/min


Thursday, February 04, 2021, 9:35

IGP1= 2.99e-7 Torr

Begin pumpdown procedure and remove container

Note:  SiC evaporation on most discs.  The temperature was too high.  Need to repeat.

 

 

 

  118   Tuesday, February 18, 2014, 12:19 Laura LambertEmpty40282-3TARGET BOATDoneSintering Ta target boat with TaC coating

 Tuesday, February 18, 2014, 12:12

A new target boat was sprayed with TaC coating and let dry.
The target boat is NOT wrapped with Ta-heat shield.

Thermocouples have been attached to the target boat in order to monitor the internal temperature of the new target boat design. 

The boat was installed in Evap#2, chamber is currently being pumped down.


 Tuesday, February 18, 2014, 14:20

Chamber was pumped down this morning to 2.9e-6 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently at 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 0.2A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr; Bad vacuum: 4.00e-5 Torr.

Temperature reading on left: thermocouple touching edge of target boat; temperature reading on right: thermocouple floating in center of target boat.


 Wednesday, February 19, 2014, 09:11

TGHT has been slowly ramping up overnight at a rate of 0.2A/min

IGP1 = 3.9e-7 Torr, TGHT = 260A; stepping ramping rate up to 2.0A/min


 Wednesday, February 19, 2014, 15:25

IGP1 = 9.4e-7 Torr

Thermocouple T2 = 1267.8C

Internal temp measured with Mikron = 1600C

Increasing max setpoint to 720A due to previous not fully sintered new design of target boat.


 Thursday, February 20, 2014, 09:17

Thermocouple T2 = 1254.5C

Internal temp measured with Mikron = 1811C

IGP1 = 2.6e-7 Torr

Reached max setpoint yesterday evening.

Initiating auto-cooling at 2.0A/min.


 Friday, February 21, 2014, 10:47

Vented and opened chamber this morning.

Target boat not fully sintered. [see attached photos]

Close to a full sinter, and will re-sinter next week with endcaps, so will not re-sinter by itself.


 

  119   Tuesday, February 25, 2014, 16:10 Laura Lambert 40282-3TARGET BOATDoneSintering TaC coated end caps

 Tuesday, February 25, 2014, 16:08

The target containers end-caps were coated with TaC spray and let dry.

The caps are inserted in the target boat vertically with no heat shield and no graphite foil. [see attached photo]

The chamber is currently being pumped down overnight.


 Wednesday, February 26, 2014, 09:54

Chamber was pumped down overnight to 4.2e-7 Torr.

HS cooling water valves opened; no leaks detected.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently at 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 0.2A/min and max setpoint to 700A.

Will ramp up to 700A rather than the usual 580A due to last round of endcaps not fully sintering at 580A with new target boat design.

Good vacuum: 3.00e-5 Torr; Bad vacuum: 4.00e-5 Torr.


 Thursday, February 27, 2014, 09:38

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.8e-7 Torr; TGHT = 311A, 4.3V

Stepping ramping rate up to 2.0A/min.


 Friday, February 28, 2014, 08:53

TGHT reached max setpoint of 700A yesterday evening.

Internal temp measured with Mikron = 1700C

IGP1 = 3e-7 Torr 

Power = 12.95V

Initiating auto-cooling at 2.0A/min.


 Monday, March 03, 2014, 11:46

Vented and opened chamber this morning.

End caps not fully sintered! 

See attached photo comparison of fully sintered [grey], partially sintered from this round [light green] and pre-sinter [dark green].

Will not bother re-sintering, as partial sinter is enough.


 

  121   Friday, March 07, 2014, 11:46 Laura Lambert 40282-3TARGET BOATIn progressSintering TaC coated end caps

 Friday, March 07, 2014, 11:41

The target container end-caps were sintered previously, but did not fully complete the sintering process [See elog entry # 119 EVAP2]

The caps are inserted in the target boat wrapped in graphite foils with 3 x Ta-heat shields.

The chamber was pumped down overnight.

IGP1 = 2e-7 Torr

HS cooling water valves were opened; no leaks detected.

TGHT was stepped up to 35A, voltage max set at 9.05V. TBHT currently at 0A.


 Friday, March 07, 2014, 11:52

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 0.5A/min and max setpoint to 500A.

Will ramp to 500A due to last failed round of end caps breaking with 3-ta heat shields at 580A.

Good vacuum: 3.00e-5 Torr; Bad vacuum: 4.00e-5 Torr.


 Friday, March 07, 2014, 13:21

IGP1 = 8e-7 Torr.

TGHT = 72A

Vacuum stable; therefore, increasing ramping rate up to 1.0A/min


 Friday, March 07, 2014, 14:20

IGP1 = 9.8e-7 Torr

TGHT = 130A

Vacuum stable; therefore, increasing ramping rate up to 2.0A/min


 

  122   Friday, March 07, 2014, 22:25 John Wong 40282-3TARGET BOATProblemsSintering TaC coated end caps

Laura Lambert wrote:

 Friday, March 07, 2014, 11:41

The target container end-caps were sintered previously, but did not fully complete the sintering process [See elog entry # 119 EVAP2]

The caps are inserted in the target boat wrapped in graphite foils with 3 x Ta-heat shields.

The chamber was pumped down overnight.

IGP1 = 2e-7 Torr

HS cooling water valves were opened; no leaks detected.

TGHT was stepped up to 35A, voltage max set at 9.05V. TBHT currently at 0A.


 Friday, March 07, 2014, 11:52

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 0.5A/min and max setpoint to 500A.

Will ramp to 500A due to last failed round of end caps breaking with 3-ta heat shields at 580A.

Good vacuum: 3.00e-5 Torr; Bad vacuum: 4.00e-5 Torr.


 Friday, March 07, 2014, 13:21

IGP1 = 8e-7 Torr.

TGHT = 72A

Vacuum stable; therefore, increasing ramping rate up to 1.0A/min


 Friday, March 07, 2014, 14:20

IGP1 = 9.8e-7 Torr

TGHT = 130A

Vacuum stable; therefore, increasing ramping rate up to 2.0A/min


 

Friday, March 07, 2014, 22:22  

Target current was at 500A before it tripped off on the chiller.   Tried to reset the chiller but to no avail.  Don't know what is going on yet. 

The TGHT/TBHT cooling water is still on, and this should OK while the HOT target boat is cooling down at the moment. 

Will leave it for now and further investigate on Monday



 

  143   Wednesday, July 23, 2014, 15:07 John WongEmpty40282-3LP-SISIn progressSintering TaC coated target container

Wednesday, July 23, 2014, 15:07

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.2A/min.

Chamber is currently being pumped down


 Wednesday, July 23, 2014, 17:40

Vacuum came down to mid 10-6 Torr.

Stepped up TGHT and TBHT to 30A - IG1 @ 1.4e-5 Torr.

Initiated auto-ramping.


 Thursday, July 24, 2014, 17:19

TGHT and TBHT have reached to 100A, and vacuum is coming down to 1.4e-6 Torr.

Increase ramping rate, TGHT to 1A/min, TBHT 0.5A/min.


 Friday, July 25, 2014, 11:26

Target container temperature reaches ~1550C at 580A on TGHT and 230A TBHT, and it has been heated for ~10 hrs.

Auto-cooling initiated at 2A/min.


 

  144   Monday, July 28, 2014, 10:52 Laura LambertEmpty40282-3LP-SISDoneSintering TaC coated target container

John Wong wrote:

Wednesday, July 23, 2014, 15:07

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.2A/min.

Chamber is currently being pumped down


 Wednesday, July 23, 2014, 17:40

Vacuum came down to mid 10-6 Torr.

Stepped up TGHT and TBHT to 30A - IG1 @ 1.4e-5 Torr.

Initiated auto-ramping.


 Thursday, July 24, 2014, 17:19

TGHT and TBHT have reached to 100A, and vacuum is coming down to 1.4e-6 Torr.

Increase ramping rate, TGHT to 1A/min, TBHT 0.5A/min.


 Friday, July 25, 2014, 11:26

Target container temperature reaches ~1550C at 580A on TGHT and 230A TBHT, and it has been heated for ~10 hrs.

Auto-cooling initiated at 2A/min.


 

 Monday, July 28, 2014, 10:50

vented in air and opened this morning. successful run


 