Entry  Wednesday, June 20, 2012, 17:29, Nikita Bernier, NiO, Ta target boat, , Done, NiO development NiO_density_measurements.xlsxCasts_thickness.GIF
    Reply  Wednesday, June 20, 2012, 22:33, John Wong, NiO, Ta target boat, , Done, NiO development Photo_2012-06-21_8_27_40_AM.png
       Reply  Thursday, June 21, 2012, 18:13, John Wong, NiO, Ta target boat, , Failed, NiO development - Container broke!  NiO_targets_temp.pdfTGHT_0-580A.GIFTGHT_200-580A.GIFTGHT_vs_VOL.GIFNiO_container_broke.png
Message ID: 32     Entry time: Wednesday, June 20, 2012, 22:33     In reply to: 31     Reply to this: 33
Author: John Wong 
Target Material: NiO 
Target Oven W.O#: Ta target boat 
Source:  
Status: Done 
Subject: NiO development 

Nikita Bernier wrote:

Wednesday, June 20, 2012, 17:23

New Target boat, with no coating, wrapped with a 0.002 inches thick Ta foil, contains NiO D-shape discs :

Sample,   # Disks,    Mass (g),    Thickness (mm)

1    12,  1.9396,  1.938

2    13,  0.9592,  0.847

3    25,  2.6675,  3.06

See John's Ipad for their recipes.

Evaporator #2 is now auto-ramping overnight at 0.5 A/min, up to 580 A, with the maximum voltage limited at 14 V, between 3.00e-05 (Good vacuum) and 4.00e-05 Torr (Bad vacuum).


 

Wednesday, June 20, 2012, 22:28

TGHT tripped off at 78A due to high out-gassing pressure.  The current was tapped down to 75A before it was turned back on. 

Changed ramping rate from 0.5A/min to 0.2A/min.  

Initiate auto-ramping... 


 Thursday, June 21, 2012, 08:35

Vacuum has come down to 7e-7 as TGHT is being ramped up at 0.2A/min. (see attachment#1).

Increase TGHT rate to 2A/min.

The temperature should be measured when the heater gets up to around 500A.


 