  Evaporator_1, Page 1 of 15  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  15   Thursday, April 14, 2011, 17:03 John WongEmpty38481-7HP-FEBIADProblems resolvedEvap. bolt/washer problems & solutions Thu Apr 14 14:03:17 2011: 
What did we see after the fin diffusion bonding
of Ta fins for FEBIAD-HP (w.o#38481-7)
 6x 
  28   Thursday, August 04, 2011, 17:46 John WongUC238634-8LP-SISProblems resolvedRepacking UCx in new target ovenThursday, August 04, 2011, 17:44: 
All the UCx material from target oven  38634-3
was recovered and repacked in this new oven. 
 200A.jpgreconditioning.jpg 
  51   Tuesday, June 12, 2012, 11:38 John WongUO2/CUCx-heatboat#2 Problems resolvedUC2 flakes - batch#01-04062012: broken seal & TGHT power supply

    

       
            
  
  54   Monday, June 25, 2012, 16:00 John WongUO2/CUCx-heatboat#2 Problems resolvedUC2 flakes - batch#01-04062012: Fiber converters failed

    

       
            
  
  76   Friday, August 23, 2013, 16:11 John WongUO2/CTarget Boat #2 Problems resolvedProcessing UC2 flaskes (batch#06 - 08222013

    

       
            
  
  83   Monday, December 02, 2013, 16:09 Anders Mjos   Problems resolvedTGHT connector repositioned and tightenedThe right connector for the TGHT had rotated.
It has now been repositioned and both connectors
have been tightened to reduce the chance
 Evap1_rotated_TGHT_conductor_2013-12-02.pdf 
  158   Wednesday, July 19, 2017, 14:15 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

    

       
            
  
  161   Thursday, July 20, 2017, 15:35 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

    

       
            
  
  163   Thursday, July 27, 2017, 09:08 Laura Lambert   Problems resolved*hot lab is HOT*

    

       
            
  
  182   Monday, January 22, 2018, 16:20 Marla CervantesUO2/C40282-2 TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#6

    

       
            
 180122-1e-1.jpg 
  186   Monday, January 29, 2018, 14:25 Marla CervantesUO2/C40282-2 TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#7

    

       
            
  
  191   Friday, February 09, 2018, 16:57 Marla CervantesUO2/C40282-2 TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10

    

       
            
  
  195   Friday, March 02, 2018, 16:35 Marla CervantesUO2/C40282-1TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#11

    

       
            
  
  201   Monday, April 09, 2018, 16:53 Laura LambertUO2/C40282-2TARGET BOATProblems resolvedCarbonizing first full length 1step UCx target

    

       
            
  
  212   Tuesday, June 26, 2018, 12:12 Aaron Schmidt   Problems resolvedGloves replaced. Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out. 
The original right one was otrn.
  
  224   Tuesday, October 23, 2018, 10:49 Marla CervantesUC2 LP-SISProblems resolvedConditioning UCx#25

    

       
            
  
  256   Thursday, January 30, 2020, 11:53 Marla CervantesUO2/CP2N-02 Problems resolvedP2N target material carbothermal reduction

    

       
            
  
  265   Tuesday, August 18, 2020, 20:45 Marla CervantesUO2/CP2N-02 Problems resolvedP2N target material carbothermal reduction

    

       
            
  
  5   Tuesday, March 29, 2011, 10:20     ProblemsLoss of cooling waterAccording to Jonathan Aoki, the electricians
will be servicing another MCC which will
result in loss of cooling water for about
  
  16   Monday, April 18, 2011, 18:14 John WongEmpty38295-8HP-FEBIADProblemsSintering target oven coated with TaCMon Apr 18 18:10:53 2011: 
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb
 pumping_down.jpgAutoheating_parameter_setup.jpgvac_curve.jpgoverall_process.jpgoverall_process_2.jpg 