45
|
Tuesday, February 14, 2012, 21:56 |
John Wong | UO2 | 38481-9 | LP-FEBIAD | Done | UO2/Nb sintering process | Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering process.
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length with tot mass of 61.49g.
The chamber has been pumped down for 7 hrs, vac is currently at 4.6e-6 Torr.
Parament set as follow, see attachment 1.
TGHT ramped up to 57A. Pressure is stabilizing at 3.8e-5 Torr.
Auto heating initiated. 0.1A/min. Max TGHT = 500A.
Sunday, February 19, 2012, 11:41
TGHT has stayed at 500A for >10hrs, Vac levels at 2.9e-6 Torr.
Target cool down initiated @ 2A/min.
Monday, February 20, 2012, 10:23
Target has been cooled down over the weekend. Vac currently at 5.77e-7 Torr.
See attachment#2: UO2_Nb_1_striptool.jpg
Chamber vented in atmosphere.
Monday, February 20, 2012, 16:23
Pumps/ power supplies off.
|
Attachment 1: Screen_shot_2012-02-14_at_9.00.04_PM.png
|
|
Attachment 2: UO2_Nb_1_striptool.jpg
|
|
148
|
Wednesday, May 24, 2017, 09:34 |
Laura Lambert | | | | Maintenance | VACUUM TRIP OFF SETPOINT CHANGED | Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point was changed to 8e-4 Torr when previously it was set to 8e-5 Torr.
Vacuum limits were set to stop at 5e-5 Torr and back-off at 6e-5 Torr
Now vacuum limits will be changed by an order of magnitude in an attempt to speed up the processes in the evaporator.
|
147
|
Tuesday, May 23, 2017, 15:51 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS | Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Attachment 1: UCxFlk_16_temp_readout.jpg
|
|
149
|
Friday, May 26, 2017, 15:23 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Problems | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Attachment 1: evap1_tripped_off_UCxFlk_16.jpg
|
|
Attachment 2: evap1_tripped_off_UCxFlk_16(2).jpg
|
|
Attachment 3: evap1_tripped_off_UCxFlk_16(3).jpg
|
|
Attachment 4: evap1_tripped_off_UCxFlk_16_auto-ramp.jpg
|
|
Attachment 5: evap1_tripped_off_UCxFlk_16_water.jpg
|
|
Attachment 6: evap1_tripped_off_UCxFlk_16(4).jpg
|
|
150
|
Friday, May 26, 2017, 16:09 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
151
|
Monday, May 29, 2017, 08:54 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Problems | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:21
Initially it looks like not enough time had been allowed for the vacuum to settle before initiating the auto-ramp resulting in the vacuum spiking and tripping off the system.
A closer look shows that is not the case.
Note: the vacuum limits were set to stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
The TGHT started to back off when the vacuum was ~6e-6 Torr, this is considered a good vacuum and should not have caused the system to initiate backing off yet.
Over the course of ~1min, evap1 had backed off all the way down to 0A.
At this point the vacuum was now up to ~1.75e-5 Torr and still rising.
~34min after the TGHT had reached 0A, the vacuum eventually reached 8e-4 Torr and tripped off the evaporator.
See photos attached.
|
Attachment 1: evap1_tripped_off_roud2_UCxFlk_16.jpg
|
|
Attachment 2: evap1_tripped_off_roud2_UCxFlk_16(2).jpg
|
|
152
|
Tuesday, May 30, 2017, 07:43 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | processing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May 16th, 2017.
The cast peeled off the glass nicely May 17th, 2017.
Initial UO2 powder used = 50.25g (Inventory R-01032A, UO2 + bottle = 876.80g before use)
Graphite powder used = 10.32g
Green cast dried UO2/C + organic mass = 61.70g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 1 long layer of heat shield and installed in evap1 today.
Chamber pumped down today.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
IG1 = 4.80e-6 Torr
Tapped up to 30A, 0.45V
Waited ~1hr, vacuum stable.
IG1 = 8.3e-6 Torr
Initiating auto-ramp
Wednesday, May 24, 2017, 09:26
IG1 = 5.5e-5 Torr
TGHT = 64A, 0.72V
Vacuum currently yo-yo-ing.
Changing vacuum limits to attempt to speed up process.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Once vacuum settles and vacuum starts to drop will adjust limits again accordingly.
Wednesday, May 24, 2017, 11:17
IG1 = 1.2e-4 Torr
TGHT = 69A, 0.74V
TGHT direct readout = 66A, 0.73V
Thermometer attached to TP = 41.0C
Room temp = 24.0C
Wednesday, May 24, 2017, 13:16
Vacuum going well.
Stable yo-yo-ing at current vacuum limit.
TP = 41.5C, RT = 23.9C
IG1 = 1.2e-4 Torr
TGHT = 71A, 0.77V
Increasing vacuum limit stop to 2.0e-4 Torr.
Thursday, May 25, 2017, 13:03
Vacuum has stabilized.
TGHT = 188A, 1.85V
IG1 = 2.2e-5 Torr.
Adjusting vacuum limits so when 2nd phase starts, vacuum does not spike.
Vacuum limit stop at 5.0e-5 Torr, backing off at 1.0e-4 Torr.
|
Friday, May 26, 2017, 13:40
Everything tripped off this morning at around 4:30am
This was not due to the vacuum spiking as one would expect.
No power bumps according to ISAC controls.
Looking back on elogs [see elog i.d. 145] evap1 had also tripped off during the last round of carbonizing UO2, however last time everything tripped off ~60A.
For last trip off the water valve remained open and on.
This time WV1 showed yellow in the TGHT epics box, off under WV epics box, but black [open] in the WV epics box diagram [see screenshot for better understanding].
Water valves are closed - confirmed in person - water wheels not turning.
Trip-off occured ~275A.
Vacuum was stable at trip-off point; IG1 ~6e-6 Torr
Reason: currently unknown.
|
Friday, May 26, 2017, 15:43
Starting pumping down again this afternoon while trying to understand trip-off - no progress on that end.
IG1 = 4.9e-6 Torr
Tapped up to 40A, 0.24V
Vacuum spiked to 2e-5 Torr
Backed off to 35A, 0.20V
Showing lower voltage output than the last round that had tripped off...but ramping is so early on/ low current, hard to tell...
Vacuum stable.
IG1 = 5.4e-6 Torr
Target boat will be ramped up to 275A [trip-off point] at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TP = 37.9C, RT = 25.2C
|
Monday, May 29, 2017, 08:21
Initially it looks like not enough time had been allowed for the vacuum to settle before initiating the auto-ramp resulting in the vacuum spiking and tripping off the system.
A closer look shows that is not the case.
Note: the vacuum limits were set to stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
The TGHT started to back off when the vacuum was ~6e-6 Torr, this is considered a good vacuum and should not have caused the system to initiate backing off yet.
Over the course of ~1min, evap1 had backed off all the way down to 0A.
At this point the vacuum was now up to ~1.75e-5 Torr and still rising.
~34min after the TGHT had reached 0A, the vacuum eventually reached 8e-4 Torr and tripped off the evaporator.
See photos attached.
|
Tuesday, May 30, 2017, 07:41
Still unsure as to why evap1 tripped off again.
Put evap1 back under vacuum/ turned turbo pump on and opened isolation valve yesterday afternoon.
Vacuum good this morning...nothing tripped off...
Tuesday, May 30, 2017, 08:21
IG1 = 2.3e-6 Torr
Tapped up manually to 40A, 0.24V
Waited ~1hr
IG1 = 4.5e-6 Torr
Initiated auto-ramp at 0.2A/min up to a final setpoint of 250A
Wednesday, May 31, 2017, 09:37
IG1 = 2.4e-6 Torr
TGHT = 250A, 2.57V
Increasing max setpoint to 275A [the trip off point] at a rate of 0.2A/min
Vacuum is currently stable and low; increasing limits to:
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Wednesday, May 31, 2017, 13:39
IG1 = 3.7e-6 Torr
TGHT = 275A, 2.80V
Increasing max setpoint to final setpoint of 520A at a rate of 0.2A/min
Vacuum is currently stable and low; keeping current limits.
Wednesday, May 31, 2017, 15:57
IG1 = 8.14e-6 Torr
TGHT = 300A, 3.08V
Vacuum stable.
Decreasing ramping rate to 0.1A/min for overnight heating.
turbo pump = 40.5C; room temp = 25.1C
Thursday, June 01, 2017, 09:00
IG1 = 4.2e-5 Torr
TGHT = 396A, 4.06V
Vacuum stable.
Increasing ramping rate to 0.2A/min.
turbo pump = 41.6C; room temp = 24.3C
Thursday, June 01, 2017, 13:18
IG1 = 1.25e-4 Torr
TGHT = 439A, 4.48V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
turbo pump = 42.3C; room temp = 24.6C
Thursday, June 01, 2017, 15:48
IG1 = 1.95e-4 Torr
TGHT = 467A, 4.81V
Vacuum stable.
Changing vacuum limits and ramping rate for heating overnight.
Decreasing ramping rate to 0.1A/min
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
turbo pump = 44.1C; room temp = 25.3C
Friday, June 02, 2017, 07:19
IG1 = 1.26e-4 Torr
TGHT = 473A, 4.77V
Vacuum stable.
Changing vacuum limits and ramping rate.
Increasing ramping rate to 0.2A/min
Vacuum limit stop at 2.0e-4 Torr, backing off at 5.0e-4 Torr.
Friday, June 02, 2017, 10:18
IG1 = 2.04e-4 Torr
TGHT = 498A, 5.08V
Vacuum stable.
Changing vacuum limits.
Vacuum limit stop at 3.0e-4 Torr, backing off at 5.0e-4 Torr.
Fan has been inserted - pointed at turbo pump, TP temp's have decreased.
tp = 32.1C; rt = 24.7C
Friday, June 02, 2017, 13:22
IG1 = 2.4e-4 Torr
TGHT = 520A, 5.40V
Vacuum stable and decreasing.
Carbonization process almost complete.
Will remain at max setpoints over the weekend.
TP = 28.2C; RT = 24.5C
Monday, June 05, 2017, 08:51
IG1 = 1.75e-6 Torr
TGHT = 520A, 5.29V
Carbonization process complete!
Remained at max setpoints over the weekend.
Initiating auto cool at 1.0A/min
Tuesday, June 06, 2017, 15:56
Vented in Ar and removed today.
Currently in glove box.
Monday, June 12, 2017, 11:44
Flakes produced: 48.00g
|
165
|
Thursday, September 07, 2017, 14:26 |
Aaron Schmidt | | | | Maintenance | roughing pump oil replaced | Thursday, September 07, 2017, 11:00 -12:00
The roughing pump was disconnected from Evaporator 1, along with the exhaust/ventilation. No contamination was found on swipes.
The oil was refilled.
The roughing pump was then moved away from the PLC to allow access for Dave Morris. The RP can be reconnected and tested after the PLC work is complete.
Work permit # I2017-09-07-1
|
105
|
Thursday, December 11, 2014, 10:17 |
Laura Lambert | | | | Maintenance | water supply shut off for lab closure over holidays | Thursday, December 11, 2014, 10:16
water valve shut off for lab closure over the holidays.
|
106
|
Friday, January 23, 2015, 15:02 |
Laura Lambert | | | | Maintenance | water supply turned back on to EVAP1 and fume hoods | Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1 and fume hoods
|
|