  282   Friday, June 03, 2022, 06:21 Darwin Ortiz RosalesUO2/C42218-4LP-IG-LISDoneUCx#39 reduction

Friday, June 03, 2022, 06:24

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous day)

IGP1 = 1.4 e-6 Torr

Good vacuum = 5e-2 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A  to 80A at 1A/10s.  Then at 1A/min to 120 A, allow degas and then autoramp 1A/10s from 120A to (450-550A)


Friday, June 03, 2022, 06:52

starting autoramp at 1A/min to 120A


Friday, June 03, 2022, 07:30

note*: At approximately 108A the pressure did not rise again but was stable.


Friday, June 03, 2022, 07:46

started autoramp at 1A/10s to 450A 


Friday, June 03, 2022, 09:29

start autoramp to 500A at 1A/min


Friday, June 03, 2022, 09:40

pressure keeps stable as ramping continues. 

increased ramp rate to 2A/min


Friday, June 03, 2022, 09:56

Drop in pressure observed as current increased at 2A/min.

Final current is 490A.  Will keep at this current for 4 hours. 


Friday, June 03, 2022, 14:05

Start auroramp to 400A at -2A/30s

will keep at 400A for 8 hours


Friday, June 03, 2022, 22:06

Start autoramp down at -2A/min to 0A

IGP1= 1.6e-06 Torr

TGHT= 400A, 3.6 V

  283   Tuesday, June 07, 2022, 07:09 Darwin Ortiz RosalesUO2/CTarget Boat DoneUO2 reduction ID C220510-1

Tuesday, June 07, 2022, 07:05

A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous day)

IGP1 = 1.2 e-6 Torr

Good vacuum = 5e-2 Torr

Bad vacuum = 5e-1 Torr

Current ramp is 1A per 10s from 0A to 80A at 1A/10s.  Then at 1A/min to 120 A and allow degas and then autoramp 1A/10s from 120A to (450-550A)


Tuesday, June 07, 2022, 08:28

IGP1=9.8e-5 Torr

TGHT = 120A, 0.85V

Start autoramp at 1A/10s to 420A


Tuesday, June 07, 2022, 08:45

Increased ramp rate to 3A/10 s as per SOP to 450 A then will slow down the ramp to observe pressure behavior.


Tuesday, June 07, 2022, 09:04

slowed autoramp to 2A/min to observe (1A/30s)

some erratic pressure oscillations observed then stabilized. 


Tuesday, June 07, 2022, 09:32

At TGHT = 495A pressure started dropping even while current ramping up.  Stopped ramp.  Will keep for 4 hours.

TGHT = 495.6A, 4.7V


Tuesday, June 07, 2022, 13:30

TGHT = 495.6 A, 4.7V

IGP1= 8.5 e-6 Torr

Start rampdown to 400A at 2A/30s and leave for 8 hour treatment

 

  284   Friday, October 07, 2022, 08:14 Darwin Ortiz RosalesUO2/C LP-SISDoneC-220928UCx conditioning experiments

Friday, October 07, 2022, 07:55

Cartridge-220928UCx was installed in the EVAP1 and pumped down yesterday.

Material will be reduced in LP-SIS wrapped with 3 Ta foils.

IGP1 = 2.1e-6 Torr

a cap was installed to collect material coming out from the ionizer tube

The initial weight of the cap 1 + small bag was recorded to be: 2.82 g   Final weight of cap1 + small bag = 2.84g (see attached picture)

Good vacuum = 5e-4 Torr

Bad vacuum = 5e-2 Torr

Power desired 1900W as approximate power used online. 

Will autoramp @2A/min to 30A, then slow down ramp to 1A/min to 120A.

After first pressure bump cleared, will ramp up to 400 A @ 2A/20s to 425A on TGHT.  TBHT will be topped off at 230A. 

from 425A, TGHT will be ramped at 1A/min and monitored for pressure behaeviour. 

sytem will be left at reduction current for 4 hours.  Then, the current will be dropped to 1900W and allow to run for 8 hours.

The cup will be collected and the system will be run again in increments of two hours. 

*slight change from test plan to save time*

 


Friday, October 07, 2022, 21:55

A true pressure max was not observed.  A max while current still rising.  stopped at 560A on TGHT and 5.3V

will leave at the above conditions for 4 hours.

Suspect that the thinner Ta shields make a difference.  Suggest to add a fourth shield and process the previous cartridge in a tube rather than a boat.  Treat for four hours (pressure max) and then test increasing the current to see if there is a pressure bump.  If no pressure bump then lower current to deposit 1900W for 8 additional hours. 

 


After 4 hours at max current, the current was dropped to 450A (TGHT) and left for 8 hours.

 


Saturday, October 08, 2022, 09:26

start autoramp down @-2A/min for TGHT and -1A/min for TBHT

Cap+ bag = 2.82 g

final cap +bag = 2.84 g


Tuesday, October 11, 2022, 10:15

Today will switch end-cup.  Will weigh new end-cup and place inside the evap1 glovebox.  Then will remove used end-cap and install new end-cap.  Used end-cup will be weighed on same balance as before.  All mass measurements will be done with the same balance. Note, that a makeshift balance air isolation container was built to allow balance to not be affected by air currents.

 Cap 2+bag initial weight = 2.80 g +/- 0.01 g

Cap 2+bag final weight = 2.81g +/- 0.01 g

No visible deposition on cap


Wednesday, October 12, 2022, 07:51

 

Start ramp up at 2A/min.  TGHT to 450A, TBHT to 230A

IGP1= 6.7e-07Torr


Wednesday, October 12, 2022, 09:47

Ramping up @ 4A/min to same final settings: TGHT = 450A and TBHT = 230A

 


Wednesday, October 12, 2022, 11:15

@10:45am 450A, 4.15V were reached on TGHT

Will leave for 2 hours at 450A then ramp down, then switch cap. 


Monday, October 17, 2022, 09:40

The second cap was taken out over the weekend  (attachment number 2).

The final weight of this cap with bag = 2.81 +/- 0.01 g

Installed a nex cap (3) with initial weigh of cap +bag = 2.74 g

Allowed vacuum to settle over Sunday and will start ramping today

Will ramp to 470 A and hold for 2 hours.  Ramp rate  2A /30s

IGP1= 4.6e-07 Torr


 Monday, October 17, 2022, 11:39

ramping with no issues.  will finish ramp around 12:03 pm and will start rampdown @ around 2:05 pm.

 


Monday, October 17, 2022, 12:03

TGHT= 470A, 4.5V

TBHT= 228A, 2.9V

IGP1= 5.6e-06 Torr


Monday, October 17, 2022, 14:05

Start rampdown at 2A/min TGHT and 1A/min TBHT to zero amp

current IGP1= 2.6e-06 Torr

TGHT = 470A, 4.5V

TBHT= 228.3A, 2.9V

 


Tuesday, October 18, 2022, 09:39

IGP1=4.4e-7 Torr

ready to dismount


Tuesday, October 18, 2022, 13:50

Cap 3 + bag initial weight = 2.74 g

Final weight of cap+bag = 2.74 g (no change)

no visible deposition on cap either

Attachment 1: Cap_1_221011.png
Cap_1_221011.png
Attachment 2: Cap_2.png
Cap_2.png
Attachment 3: cap3.png
cap3.png
  285   Wednesday, October 19, 2022, 12:28 Darwin Ortiz RosalesUC240253-5LP TUBEDoneC-220510 further conditioning

Wednesday, October 19, 2022, 10:27

Cartridge-220510Cx was installed in the EVAP1 and pumped down yesterday.

Material will be further conditioned at 450A for 4 hours.

The material will be conditioned inside a container tube with both ends open at the ends.  Two springs are inserted at the ends of the graphite cartridge to contain the material as graphite caps not inserted.

IGP1 = 7.8e-07 Torr

 

Good vacuum = 5e-4 Torr

Bad vacuum = 5e-2 Torr

 

Will autoramp @2A/30s (4A/min) to 40 A and then to 120A.  Fast ramp rate because material had previously been conditioned


 

Wednesday, October 19, 2022, 12:23

TGHT 450A, 5.2 V

Will leave for 4 hours and then begin ramp-down.


Wednesday, October 19, 2022, 16:21

IGP1= 3.1e-06Torr

450A, 5.2V

Start rampdown @- 2A/min


Thursday, October 20, 2022, 09:23

IGP1= 4.6e-7 Torr

 

  286   Monday, November 28, 2022, 05:59 Darwin Ortiz RosalesUO2/C LP-SISDoneC221125experiment

Monday, November 28, 2022, 05:58

Left weekend to pump down

current IGPI= 7.23e-7 Torr

 

Material will be reduced in LP-SIS wrapped with 3 Ta foils.

a cap was installed to collect material coming out from the ionizer tube

Initial weight of target material plus cartridge was recorded

All relevant data and findings will be reported and added to docushare as document :

 

Good vacuum = 5e-4 Torr

Bad vacuum = 5e-2 Torr

Power desired 1900W as approximate power used online. 

Will autoramp @2A/min to 30A, then slow down ramp to 1A/min to 120A.

After first pressure bump cleared, will ramp up to 400 A @ 2A/20s to 425A on TGHT.  TBHT will be topped off at 230A. 

from 425A, TGHT will be ramped at 1A/min and monitored for pressure behaeviour. 

sytem will be left at reduction current for 4 hours.  Then, the current will be dropped to 425 A and allow to run for 8 hours.

The cup will be collected and the system will be run again for two hours. at the same current until no material visible on cap.  Then it will be run at 450A for increments of two hours until no significant mass change of target material.

 


Monday, November 28, 2022, 06:05

started initial heating to 30A at 2A/min on both TGHT and TBHT.


Monday, November 28, 2022, 08:46

was ramping at 6A/min (2A/20s) on both tGHT and TBHT but aborted due to pressure spike.  will allow pressure to stabilize.

TGHT = 162A, 1.35V

TBH 162A, 1.9V


Monday, November 28, 2022, 08:51

Restarting the heating at 6A/min (2A/20s)


Monday, November 28, 2022, 09:21

Pausing heating @ TGHT= 323 A 3.0V

Allow pressure to stabilize to better spot reduction current


Monday, November 28, 2022, 09:49

Started heating TGHT at 2A/min so reduction current can be better resolved


Monday, November 28, 2022, 10:12

heating aborted to allow pressure to stabilize

IGP1> 5.0e-4 Torr


Monday, November 28, 2022, 11:31

IGP1= 1.5e-4 Torr start autoramp TGHT @1A/min


Monday, November 28, 2022, 11:51

paused heating.  Second peak has been passed.  Will let pressure drop before starting heating again to try and better observe reduction peak.


Monday, November 28, 2022, 12:46

start autoramp at 2A/min from 389A on TGHT

IGP1- 6.4e-6 Torr


Monday, November 28, 2022, 14:21

Pressure starts to drop at around 535A, but large bump observed around 386A. 

Will leave four hours. 

TGHT= 539A, 4.98V

TBHT= 229A, 2.9V

 


Monday, November 28, 2022, 18:19

Ramping down at 4A/min to 425A

Currently IGP1= 6.2e-6 Torr

TGHT = 539A, 4.98 V

TBHT= 230A, 2.98V

 


Monday, November 28, 2022, 22:23

425 A on TGHT reached at 6:50 pm.  Will ramp down at 2:50 am .  -2A/min TGHT and -1A/min TBHT


Tuesday, November 29, 2022, 09:34

Final IGP1 when TGHT and TBHT = 0A  is 5.0e-7 Torr


Tuesday, November 29, 2022, 14:08

Weighed materials and reloaded

Currently at 1.1 e-05 Torr

Will initiate heat ramp at 2A/min to 425 A

@241A increase ramp rate to 4A/min on TGHT


Wednesday, November 30, 2022, 12:44

heating B finished and cartridge loading for heating C

Current pressure = 2.09 E-05 Torr.  Will ramp up to 450A at 4A/min and regulate as needed.

Will heat at 450A TGHT for 2 hours, TBHT max= 230A


Wednesday, November 30, 2022, 16:30

Starting rampdown @-2A/min TGHT and -1A/min TBHT

Final heating was @ 450A, 4.0V TGHT and 230A, 2.7V TBHT

 


Friday, December 02, 2022, 09:00

IGP1= 7.2 e-07 Torr

Starting ramp at 2A/min to 450A on TGHT and 230A on TBHT

 


Friday, December 02, 2022, 10:02

pressure stated dropping.  Will increase ramp to 4A/min (2A/30s)


Friday, December 02, 2022, 15:35

Starting ramp down at -2A/min TGHT and -1A/min TBHT

IGP1= 2.6 e-06 Torr

TGHT 450A   4.2V

TBHT  230A  2.9V

 

Attachment 1: Data_summary.png
Data_summary.png
  287   Monday, December 19, 2022, 10:45 Darwin Ortiz RosalesUO2/C LP TUBEDoneC-221207 Reduction

Monday, December 19, 2022, 10:38

Cartridge with 175 discs (including 5 analysis discs) loaded into a graphite cartridge. 

To be reduced inside a Ta container tube.  Tube wrapped in 3 Ta foil heatshields

Will keep at reducing current for 4 hours and then 10 hours @ 425A

Good Vacuum: 5.0e-04 Torr

Bad Vacuum: 5.0e-02 Torr

Initial pressure was 6.36 e-07 Torr

Autoramped to 56A @ 1A/30s

Outgassing bump observed starting at 50A and at 56A the maximum pressure was ~1.9e-05 Torr


Monday, December 19, 2022, 10:47

started autoramping at 1A/30s to 90A


Monday, December 19, 2022, 10:50

observed that pressure not increasing radically, therefore ramping up faster.  2A/30s


Monday, December 19, 2022, 10:58

Second pressure bump observed at 90A, 1.0V

leaving at this current until pressure drops


Monday, December 19, 2022, 17:15

ramped to 280A and left at 280 until pressure started dropping

ramping again to 500A @ 2A/30s

 


Monday, December 19, 2022, 17:26

Stopped at 330A due to pressure hike.  Will allow pressure to drop then continue ramp.


Monday, December 19, 2022, 18:00

restarting ramp @ 2A/30s


Monday, December 19, 2022, 18:11

Pressure started dropping around 350A corresponding to additive gas-off.  Will rampt to 500A @ 2A/30 seconds and then at 1A/30s to 530A


Final current was 548A, 6.7 V.  Will test increasing current after 4 hours (11 pm)


Monday, December 19, 2022, 23:10

ramping down @ 2A/min to 425A .  should be done by 12:00 am and cooling at9:00 am (includes 1 hour ramp down to 425).


Ramping down to zero @ -2A/min


Wednesday, December 21, 2022, 10:47

Final IGP1= 3.7e-07 Torr

  288   Thursday, January 19, 2023, 10:02 Darwin Ortiz RosalesUO2/C LP TUBEDoneC230105 Reduction

Thursday, January 19, 2023, 09:57

Cartridge #8 loaded with 198 discs

To be reduced inside a Ta container tube.  Tube wrapped in 3 Ta foil heatshields.

Reduction for 4 hours and then 10 hours @ 425A

Good Vacuum: 5.0e-04 Torr

Bad Vacuum: 5.0e-02 Torr

Initial pressure is 1.41e-06 Torr


Thursday, January 19, 2023, 10:02 Auto ramping to 120A @ 1A/min

 


Thursday, January 19, 2023, 18:58

Autoramping to  300A @ 4/min (2A/30s)

IGP1=3.34e-06 Torr

 


Friday, January 20, 2023, 07:37

left at 300 A for 8 hours and pressure dropped.  Restarted autoramp at 2A/30s and pressure was increasing until 425A where it peaked.  Reduced autoramp to 1A/min and observed slow but definite pressure drop.  Will go to 450A and leave there for 4 hours. 

Currently 440A, 5.3V on TGHT and 1.28e-05 Torr on IGP1


Friday, January 20, 2023, 12:06

After 4 hours at 450A IGP1= 3.49e-06 Torr

TGHT = 450A 5.4V

Will drop to 425A and leave for 10 hours

 


Friday, January 20, 2023, 21:53

TGHT 425A, 5.2V

IGP1= 1.81e-06 Torr

autoramping to 0 A @ -2A/min

  289   Wednesday, March 22, 2023, 22:29 Darwin Ortiz RosalesUO2/C LP TUBEDone230316 Reduction

Wednesday, March 22, 2023, 22:29

Cartridge #9 loaded with 213 plus 3 analysi discs

To be reduced inside a Ta container tube.  Tube wrapped in 3 Ta foil heatshields.

Reduction for 4 hours and then 8 hours @ 450A

Good Vacuum: 5.0e-04 Torr

Bad Vacuum: 5.0e-02 Torr

Initial pressure is 3.71e-06 Torr

 


Wednesday, March 22, 2023, 22:33

Autoramping to 400A @ 1A/min


Thursday, March 23, 2023, 06:57

Starting heating at 2A/min

Currently at 400A and 4.5V

IGP1= 9.6e-06 Torr


At around 500A, the reduction was observed.  Current manually increased to 508 A and left there for remainder of four hours.  4 hours will be done at 1210 pm, then will ramp down to 450 and 8 hours


Thursday, March 23, 2023, 12:01

IGP1= 7.6 e-06 Torr

508 A, 6.0 V TGHT

Start rampdown to 450 @ -2A/min


Thursday, March 23, 2023, 20:27

IGP1= 2.36e-06 Torr

TGHT = 452A, 5.3A

Starting ramp down @-2A/min

 

 

  290   Wednesday, October 11, 2023, 10:06 Darwin Ortiz RosalesUO2/C LP TUBEDoneTUCx-231005 reduction & conditioning

Wednesday, October 11, 2023, 9:36

Cartridge #10 loaded with 213 plus 3 analysi discs

To be reduced inside a Ta container tube.  Tube wrapped in 3 Ta foil heatshields.

Reduction for 4 hours and then 8 hours @ 450A

Good Vacuum: 5.0e-04 Torr

Bad Vacuum: 5.0e-02 Torr

Initial pressure is 2.4 e-06 Torr


 Wednesday, October 11, 2023, 10:56

Starting heat ramp at 2A/min to 60A

First pressure bump observed at 60A

Allowing pressure to restabilize


Wednesday, October 11, 2023, 13:12

IGP1=2.6 e-5 Torr

continuing to heat at 2A/min


Wednesday, October 11, 2023, 13:35

another pressure bump observed around 90A (should go slowly in these current range).  Aborted ramp, waiting for pressure to stabilize.

pressure rose to around 2.5e-02 Torr (close to our bad pressure)


Wednesday, October 11, 2023, 13:52

IGP1=5.4e-04 Torr Start ramp at 2A/min


Wednesday, October 11, 2023, 17:53

Pressure has started to drop so increased ramp to 4A/min

 


 Wednesday, October 11, 2023, 18:18

 Second small pressure bump observed at 482A and 5.0 V.  Pressure falling.  Will leave at 500A for 4 hours . 

 


 Wednesday, October 11, 2023, 22:00

IGP1= 8.0 e-06 Torr

TGHT=500A, 5.2V

Initiate rampdown to 450A and will leave there for 8 hours


Thursday, October 12, 2023, 07:02

Initiate rampdown to zero.  IGP1=3.21e-06 Torr

TGHT= 450A, 4.6V

  291   Tuesday, April 09, 2024, 14:43 Darwin Ortiz RosalesUO2 LP TUBEIn progressUCx240408 reduction

Tuesday, April 09, 2024, 14:42

Cartridge #16 loaded with 213 plus 3 analysi discs

To be reduced inside a Ta container tube.  Tube wrapped in 3 Ta foil heatshields.

Reduction for 4 hours and then 8 hours @ 450A

Good Vacuum: 5.0e-04 Torr

Bad Vacuum: 5.0e-02 Torr

Initial pressure is 2.4 e-06 Torr


Tuesday, April 09, 2024, 14:42

Start ramp @2A/min to 120A then wait for pressure drop to continue.


Tuesday, April 09, 2024, 16:51

Set ramp to 2A/30s to 480A


Wednesday, April 10, 2024, 00:02

Ramping down to 450 A


Thursday, April 11, 2024, 09:56

Cool down Wednesday morning

Will be left under vacuum in EVAP1 due to hotlab closure.


 

 