  269   Tuesday, March 30, 2021, 16:04 Marla CervantesUO2/CP2N-02 DoneP2N-3 carbothermal reduction

Green target material characteristics  (elog 105)

#discs = 49

Average disc thickness = 0.453mm

Empty cartridge weight = 9.42 g

Full cartridge weight = 39.86 g

UO2+C weight = 30.44 g 


Tuesday, March 30, 2021, 16:04

The target material was loaded in a P2N oven, wrapped with three heat shields, and set in the EVAP1

EVAP1 is currently being evacuated.


Wednesday, March 31, 2021, 09:42

IGP1 = 3.24e-6 Torr

Good vacuum 1e-1 Torr

Bad vacuum 5e-1 Torr

Autoramp set to 1A/10s to 150 A. 


Wednesday, March 31, 2021, 10:17

TGHT = .54 V, 149.88 A

IGP1 = 6.3e-4 Torr and increasing

Max pressure = 0.06 Torr


Wednesday, March 31, 2021, 10:33 

IGP1= 0.004 Torr

Autoramp set to 1A/10s to 200 A


Wednesday, March 31, 2021, 10:43

Maximum pressure 0.03 Torr and going down

Autoramp set to 1A/10s to 250 A


Wednesday, March 31, 2021, 11:04 

TGHT = 1.1 V, 299.9 A

IGP1 = 6e-4 Torr and going down

Autoramp set to 2.5 A/10 s to 700 A


Wednesday, March 31, 2021, 11:35

Ramp stopped at 690 A

TGHT = 2.9V, 689.1A

IGP1 = 0.127 Torr 


Wednesday, March 31, 2021, 11:37

Autoramp  set to 700 A at 1A/20s

Manually ramped to 740 A (3V) to make sure carbothermal reduction is done.


 Wednesday, March 31, 2021, 12:00

The power supply tripped, Gelo was monitoring the heating process.



Wednesday, March 31, 2021, 14:33

The target will be heated for 4 hours to get read of impurities.

IGP1 = 6e-6 Torr 

Autoramp set to 650 at 1A/10s 


Wednesday, March 31, 2021, 20:37

TGHT = 2.77 V, 669.6A 

IGP1 = 8.5e-6 Torr

EVAP1 ramped down to 0 A at 2 A/min

  270   Thursday, April 15, 2021, 15:01 Marla Cervantes    IGP1 patch

Thursday, March 31, 2021, 14:42

 

EVAP1's TGHT has been tripping even when the pressure is below the tripping limits. The temperature of the turbo pump and the TGHT's power supply were monitored discarding the possibility of tripping due to the overheating of these pieces of equipment.

Gelo has been monitoring the IGP1 during carbothermal reductions to pinpoint the tripping issue, below is Gelo description to the issue and the patch he implemented to fix it.

 

"IGP loses its STATON (On status) if the value from the device is not within the valid voltage window (0.7 to 10 V). IEVAP:IGP1 for some reason goes to 0V for a few seconds then goes back up to where it left off.

Prior to the latest software updated, I added a 2 second delay in the code so that any invalid signal <=2s will be ignored.

 

Here is the data that you sent me specifically looking at when it tripped. I also attached the data that you sent me.  << File: 310321-P2N-3-CR (1).txt >>

 

 

Time

 

IEVAP:TGHT:RDVOL [V]

 

IEVAP:TGHT:RDCUR [A]

 

IEVAP:IGP1:RDVAC [T]

03/31/2021 12:00:25

3.07

740.9

0.01866428

03/31/2021 12:00:26

3.07

741.1

0.01838651

03/31/2021 12:00:27

3.07

740.7

0.01838651

03/31/2021 12:00:28

3.07

740.8

0.01797758

03/31/2021 12:00:29

3.08

740.9

0.0178433

03/31/2021 12:00:30

3.08

740.6

0.0178433

03/31/2021 12:00:31

3.08

740.8

0

03/31/2021 12:00:32

3.08

741.1

0

03/31/2021 12:00:33

0.14

42.2

0.01680456

03/31/2021 12:00:34

0

3.3

0.01513015

03/31/2021 12:00:35

0

3.4

0.01071685

03/31/2021 12:00:36

0

3.2

0.00788081

03/31/2021 12:00:37

0

3.2

0.00673278

03/31/2021 12:00:38

0

2.6

0.00445774

 

TGHT Voltage and TGHT current are both read from the same PLC module, which tells me that the PLC module is not likely the issue since we were still reading other signals when IGP was reading 0.

 

For the new update, I adjusted the delay to 5 seconds since the signal drop seemed like it was about 2s and was enough to lose the IGP STATON bit which tripped TGHT.

 

The delay only applies for the STATON status which can also be described as reading OK status in this case. Any other trip will be instantaneous and work as normal. 

 

STATON is “ANDed” with other trips. i.e. IEVAPIGP_LESS10MTORR = IEVAPIGP1_RDVAC < 10mTorr AND IEVAPIGP1_STATON."

  271   Saturday, June 05, 2021, 09:14 Marla CervantesUC2 TARGET BOATIn progressUCx#33 Conditioning

 Saturday, June 05, 2021, 08:57

Target #33 was installed in the EVAP1 and pumped down yesterday (Friday 4).

Target #33 is going to be conditioned on a Ta boat wrapped with 3 Ta foils.

IGP1 = 3.85e-6 Torr

Good vacuum = 1e-1 Torr

Bad vacuum = 5e-1 Torr

Power desired 1.6kW. This is the first target conditioned this way, 


Saturday, June 05, 2021, 09:13

Current ramp is 2A/30s to 400 A


Saturday, June 05, 2021, 10:59

TGHT = 3.5V, 399.7 A, 1.4 kW

IGP1 = 4.4e-5 Torr


Saturday, June 05, 2021, 11:00  

Current ramp is 2A/30s to 450 A


Saturday, June 05, 2021, 11:14

 TGHT = 4.06 V, 451.584 A, 1.4 kW

IGP1 = 4.86e-5 Torr


Saturday, June 05, 2021, 11:15 

Current ramp is 2A/30s to 500 A


Saturday, June 05, 2021, 11:23

TGHT = 4.23 V, 467.2 A, 1.97 kW pressure was still increasing a little at 1.6kW

IGP1 = 4.86e-5 Torr


Saturday, June 05, 2021, 19:10

 TGHT = 4.08 V, 459.52 A, 

IGP1 = 6.4e-6 Torr

Initiate ramp down  at 2 A/min to 0A

  274   Wednesday, September 15, 2021, 07:19 Marla CervantesUC2 TARGET BOATDoneConditioning 2sc samples

Wednesday, September 14, 2021, 21:14

Boat is wrapped with 2 layers of Ta-heat shield

The samples consists of 15 discs of UCx of 14mm diameter

The chamber is currently pumping down.

TGHT will be ramped up to 450 A


Wednesday, September 15, 2021, 07:17

IGP1 = 6.75e-6 Torr

Tapped up manually to 40A.

TGHT = 60 A, 2.39 V

Vacuum stable IG1 = 7.25e-6 Torr

Initiating auto-ramp for TGHT at a rate of 0.2A/min to 445 A

Parameter setup: 5.0e-5 good vac, 8.0e-5 bad vac.


 Wednesday, September 15, 2021, 11:57

IGP1=2.24e-5 Torr

TGHT= 102.016 A, 1.275 V

Autoramp changed to 1A/min to 450 A


Wednesday, September 15, 2021, 12:53

IGP1 = 3.3e-5 torr

TGHT= 150 A,  V

Autoramp changed to 2A/30s to 450 A

 1e-1 good vac, 5e-1 bad vac


Wednesday, September 15, 2021, 12:59

 


Friday, September 17, 2021, 07:54

IGP1 = 3.81e-6 Torr

TGHT = 449.6 A, 4.31 V

Autoramp set to -2A/min to 0 A 

  44   Monday, November 14, 2011, 11:56 Peter Kunz UC238634-10LP-SISDoneUCx03: Conditioning up to 175A

Evaporator was cleaned Nov 11 from after target was conditioned up to 175A. There was significant condensation of oily fluid on the left side where the target container was open (D-shaped end cap). There were also deposits in the hole for the ionizer, but the ionizer itself seemed to be clean.

Attachment 1: 0--0009.jpg
0--0009.jpg
Attachment 2: 0--0011.jpg
0--0011.jpg
  58   Monday, September 03, 2012, 02:56 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05
Organic/volatile burnoff complete at TGHT = 190A. Rampdown initiated.
  59   Tuesday, September 04, 2012, 17:26 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05
Organic gunk cleaned out. Beginning 2nd phase of conditioning.
  60   Friday, September 07, 2012, 17:21 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05
Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr. Cool down sequence initiated.
  61   Monday, September 10, 2012, 11:00 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05
Plot of conditioning run: IEVAP:IG1, TGHT
Attachment 1: UC2_05_conditioning.png
UC2_05_conditioning.png
  70   Tuesday, July 02, 2013, 11:13 Peter Kunz UO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

 

1. stage - burning off organics complete

2. stage - carbonization began 1-8 am 2013/07/02

Attachment 1: UO2-C-01.png
UO2-C-01.png