Tuesday, November 07, 2017, 12:04, Laura Lambert, , , , Maintenance, Noise levels checked - ear protection not required.
|
Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor by Terry.
Max readings in lab reached ~83dB but sat between 70-78dB in most areas. |
Wednesday, November 22, 2017, 14:20, Laura Lambert, , , , Maintenance, New eye wash for hot lab!
|
Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple attachment on sink spout.
Easy to use, simply twist attachment 180 degrees. |
Tuesday, March 29, 2011, 10:30, , , , , Done, Loss of cooling water update
|
It's the NON-ACTIVE water that will go off. The evaporator is on sity water, so it will be OK. |
Tuesday, March 29, 2011, 10:20, , , , , Problems, Loss of cooling water
|
According to Jonathan Aoki, the electricians will be servicing another MCC which will result in loss of cooling water for about 8 hours starting at 16:00
March 30. We shouldn't be running the evaporator or any condensers at that time. |
Wednesday, September 20, 2017, 08:07, Aaron Schmidt, , , , Maintenance, Ion gauge & RP status
|
Wednesday, September 20, 2017, 08:00:
-A new ion gauge was installed yesterday afternoon and the old one removed. The old IG was found to be contaminated (300 cpm) and as of 20/09/2017,
it is double bagged and stashed underneath the evaporator for the time being. |
Tuesday, April 21, 2015, 11:28, Laura Lambert, , , , Maintenance, Ion Gauge replaced March 23rd 2015
|
|
Tuesday, November 07, 2017, 11:57, Laura Lambert, , , , Maintenance, Interlocks limits changed to 100mTorr
|
Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed to 100mTorr for both TGHT and TBHT by Ray
|
Friday, October 04, 2013, 15:56, John Wong, Empty, , LP-SIS, Done, Ignore this entry - Process was done in Evap2
|
Friday, October 04, 2013, 15:37
A LP target container is coated with TaC. The container is wrapped with 3 layers to heat shield.
This container will be used for the graphite tube test. |
Wednesday, November 24, 2021, 10:38, Luca Egoriti, Ta, , , In progress, IPF release tests
|
Wednesday, November 24, 2021, 10:38
A first, short "FullTa1" target was loaded into the evap1. It consists of a short container (10 cm) with lateral thickness of ~0.2mm.
The ends of the target connect with the TGHT terminals through two copper adapters. |
Thursday, April 15, 2021, 15:01, Marla Cervantes, , , , , IGP1 patch
|
Thursday, March 31, 2021, 14:42
EVAP1's TGHT has been tripping even when the pressure is below the tripping limits. The temperature of the turbo pump and the |
Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out
|
Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Monday, June 01, 2020, 09:37: Swap complete.
|
Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out
|
Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips. |
Tuesday, August 18, 2020, 12:40, Aaron Schmidt, , , , , IEVAP:IGP1 swap out
|
INIFICON - BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: Control head for IGP1 swapped with bagged one. |
Wednesday, March 27, 2019, 08:56, Marla Cervantes, , 43630-6, , Done, Graphite insert test 4
|
Wednesday, March 27, 2019, 08:50
A graphite insert was set into a tantalum tube in the evaporator 2 for 3 days
The objective of the test was to determine the current and voltage required to reach 2000 C |
Friday, May 24, 2019, 15:25, Marla Cervantes, , 43943-1, , Done, Graphite insert test - FOILS
|
Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded with graphite foils was transferred to EVAP1
https://elog.triumf.ca/TIS/Evaporator_2/445 |
Wednesday, April 10, 2019, 13:38, Marla Cervantes, , 43630-3 , , Done, Graphite insert test #6
|
Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to a graphite insert (see picture caps)
The insert was set in a tantalum tube previously coated and wrapped with 3 Ta sheets. |
Friday, November 01, 2013, 13:08, Anders Mjos, , , , Maintenance, Gloves, window and window gasket replaced.
|
Work covered under work permit 2013-11-01-3 and performed by Anders
and Rick with the help of Danno (RPG).
No significant contamination was found during the work. The old window could be disposed as normal waste. |
Tuesday, June 26, 2018, 12:12, Aaron Schmidt, , , , Problems resolved, Gloves replaced.
|
Tuesday, June 26, 2018, 09:30. Gloves on evap 1 changed out.
The original right one was otrn. Left was o but worn. Both replaced with new gloves. |
Friday, November 05, 2021, 13:38, Luca Egoriti, Ta, , LP-SIS, In progress, Full target release test 2
|
Friday, November 05, 2021, 13:23
Full target loaded with ~500 non-active foils plus 4 active foils.
Initial pressure when heating: 1.6E-5 T |
Friday, September 24, 2021, 15:40, Luca Egoriti, Ta, , LP-SIS, In progress, Full target release test 1
|
Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active foils plus 4 active foils.
Initial pressure when heating: 6.6E-5 T |
|