Entry  Tuesday, November 07, 2017, 12:04, Laura Lambert, , , , Maintenance, Noise levels checked - ear protection not required. 
 Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor by Terry.
Max readings in lab reached ~83dB but sat between 70-78dB in most areas.
Entry  Wednesday, November 22, 2017, 14:20, Laura Lambert, , , , Maintenance, New eye wash for hot lab! 
 Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple attachment on sink spout.
Easy to use, simply twist attachment 180 degrees.
Entry  Tuesday, March 29, 2011, 10:30, , , , , Done, Loss of cooling water update 
It's the NON-ACTIVE water that will go off.  The evaporator is on sity water, so it will be OK.
Entry  Tuesday, March 29, 2011, 10:20, , , , , Problems, Loss of cooling water 
According to Jonathan Aoki, the electricians will be servicing another MCC which will result in loss of cooling water for about 8 hours starting at 16:00
March 30.  We shouldn't be running the evaporator or any condensers at that time.
Entry  Wednesday, September 20, 2017, 08:07, Aaron Schmidt, , , , Maintenance, Ion gauge & RP status 
Wednesday, September 20, 2017, 08:00: 
-A new ion gauge was installed yesterday afternoon and the old one removed. The old IG was found to be contaminated (300 cpm) and as of 20/09/2017,
it is double bagged and stashed underneath the evaporator for the time being. 
Entry  Tuesday, April 21, 2015, 11:28, Laura Lambert, , , , Maintenance, Ion Gauge replaced March 23rd 2015 
 
Entry  Tuesday, November 07, 2017, 11:57, Laura Lambert, , , , Maintenance, Interlocks limits changed to 100mTorr 
 Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed to 100mTorr for both TGHT and TBHT by Ray

 
Entry  Friday, October 04, 2013, 15:56, John Wong, Empty, , LP-SIS, Done, Ignore this entry - Process was done in Evap2 
Friday, October 04, 2013, 15:37
A LP target container is coated with TaC.  The container is wrapped with 3 layers to heat shield.  
This container will be used for the graphite tube test.  
Entry  Wednesday, November 24, 2021, 10:38, Luca Egoriti, Ta, , , In progress, IPF release tests 
Wednesday, November 24, 2021, 10:38
A first, short "FullTa1" target was loaded into the evap1. It consists of a short container (10 cm) with lateral thickness of ~0.2mm.
The ends of the target connect with the TGHT terminals through two copper adapters.
Entry  Thursday, April 15, 2021, 15:01, Marla Cervantes, , , , , IGP1 patch 
Thursday, March 31, 2021, 14:42 
 
EVAP1's TGHT has been tripping even when the pressure is below the tripping limits. The temperature of the turbo pump and the
Entry  Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out 
 Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Monday, June 01, 2020, 09:37: Swap complete. 
Entry  Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out 
 Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Entry  Tuesday, August 18, 2020, 12:40, Aaron Schmidt, , , , , IEVAP:IGP1 swap out 
 INIFICON -  BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: Control head for IGP1 swapped with bagged one.
Entry  Wednesday, March 27, 2019, 08:56, Marla Cervantes, , 43630-6, , Done, Graphite insert test 4 
 Wednesday, March 27, 2019, 08:50
A graphite insert was set into a tantalum tube in the evaporator 2 for 3 days
The objective of the test was to determine the current and voltage required to reach 2000 C
Entry  Friday, May 24, 2019, 15:25, Marla Cervantes, , 43943-1, , Done, Graphite insert test - FOILS 
 Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded with graphite foils was transferred to EVAP1
https://elog.triumf.ca/TIS/Evaporator_2/445
Entry  Wednesday, April 10, 2019, 13:38, Marla Cervantes, , 43630-3 , , Done, Graphite insert test #6 caps.jpgCurren-voltage-plot.JPG
 Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to a graphite insert (see picture caps)
 The insert was set in a tantalum tube previously coated and wrapped with 3 Ta sheets.
Entry  Friday, November 01, 2013, 13:08, Anders Mjos, , , , Maintenance, Gloves, window and window gasket replaced. 
Work covered under work permit 2013-11-01-3 and performed by Anders
and Rick with the help of Danno (RPG).
No significant contamination was found during the work. The old window could be disposed as normal waste.
Entry  Tuesday, June 26, 2018, 12:12, Aaron Schmidt, , , , Problems resolved, Gloves replaced. 
 Tuesday, June 26, 2018, 09:30. Gloves on evap 1 changed out. 
The original right one was otrn. Left was o but worn. Both replaced with new gloves.
Entry  Friday, November 05, 2021, 13:38, Luca Egoriti, Ta, , LP-SIS, In progress, Full target release test 2 Ta-ReleaseTest-2_low-current.JPG
 Friday, November 05, 2021, 13:23
Full target loaded with ~500 non-active foils plus 4 active foils.  
Initial pressure when heating: 1.6E-5 T 
Entry  Friday, September 24, 2021, 15:40, Luca Egoriti, Ta, , LP-SIS, In progress, Full target release test 1 
 Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active foils plus 4 active foils.  
Initial pressure when heating: 6.6E-5 T 