Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 15 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  258   Friday, January 31, 2020, 15:36 Marla CervantesUO2/CP2N-02 DoneP2N target material carbothermal reduction

    

       
            
 P2N-Carbothermal_reduction.JPG 
  261   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  260   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  263   Thursday, August 13, 2020, 14:37 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
 200815-Vacuum_P2N.PNG 
  264   Tuesday, August 18, 2020, 12:40 Aaron Schmidt    IEVAP:IGP1 swap out INIFICON -  BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38:
  
  265   Tuesday, August 18, 2020, 20:45 Marla CervantesUO2/CP2N-02 Problems resolvedP2N target material carbothermal reduction

    

       
            
  
  266   Wednesday, August 19, 2020, 07:49 Marla CervantesUO2/CP2N-02 DoneP2N carbothermal reduction (#2)Wednesday,
August 19, 2020, 07:47 
 P2N.PNG 
  267   Tuesday, September 08, 2020, 20:45 Marla CervantesUO2/CP2N-02 DoneP2N-2 carbothermal reduction Tuesday, September 08, 2020, 20:44
A P2N oven with three heat shields,
 P2N-2-CR-1.PNG 
  268   Thursday, September 10, 2020, 14:07 Marla CervantesUO2/CP2N-02 DoneP2N-2 Conditioning Thursday, September 10, 2020, 14:01
A P2N target was carbothermal reduced
but at the maximum current, the power supply
  
  269   Tuesday, March 30, 2021, 16:04 Marla CervantesUO2/CP2N-02 DoneP2N-3 carbothermal reductionGreen
target material characteristics  (elog 
  
  270   Thursday, April 15, 2021, 15:01 Marla Cervantes    IGP1 patchThursday, March 31, 2021, 14:42 
 
EVAP1's TGHT has
  
  278   Wednesday, November 24, 2021, 10:38 Luca EgoritiTa  In progressIPF release testsWednesday, November 24, 2021, 10:38
A first, short "FullTa1"
target was loaded into the evap1. It consists
  
  281   Wednesday, June 01, 2022, 08:42 Darwin Ortiz RosalesUO2/CTarget Boat DoneUO2 reduction Provisional ID C211209-1 Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge
  
  283   Tuesday, June 07, 2022, 07:09 Darwin Ortiz RosalesUO2/CTarget Boat DoneUO2 reduction ID C220510-1Tuesday, June 07, 2022, 07:05
A loaded graphite cartridge
  
ELOG V2.9.2-2455