Wednesday, March 22, 2023, 22:29, Darwin Ortiz Rosales, UO2/C, , LP TUBE, Done, 230316 Reduction
|
Wednesday, March 22, 2023, 22:29
Cartridge #9 loaded with 213 plus 3 analysi discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Wednesday, October 11, 2023, 10:06, Darwin Ortiz Rosales, UO2/C, , LP TUBE, Done, TUCx-231005 reduction & conditioning
|
Wednesday, October 11, 2023, 9:36
Cartridge #10 loaded with 213 plus 3 analysi discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Tuesday, April 09, 2024, 14:43, Darwin Ortiz Rosales, UO2, , LP TUBE, Done, UCx240408 reduction
|
Tuesday, April 09, 2024, 14:42
Cartridge #16 loaded with 213 plus 3 analysi discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Thursday, September 12, 2024, 06:23, Darwin Ortiz Rosales, UO2/C, , LP TUBE, Done, UCx240904 reduction
|
Thursday, September 12, 2024, 06:19
Cartridge #19 loaded with 232 discs including 5 analysis discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Tuesday, September 17, 2024, 06:49, Darwin Ortiz Rosales, UO2/C, , LP TUBE, Done, UCx240916 reduction
|
Tuesday, September 17, 2024, 06:45
Cartridge #20 loaded with 224 discs plus 3 analysis discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Thursday, September 19, 2024, 22:48, Darwin Ortiz Rosales, UO2/C, conditioning oven#3, LP TUBE, Done, UCx240917 reduction
|
Thursday, September 19, 2024, 22:44
Cartridge #21 loaded with 211 discs including 3 analysis discs |
Wednesday, March 23, 2011, 18:23, John Wong, , , , , Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
|
March 23, 2011
12:30: Target oven is wrapped with 3 Ta-heat shields. Pumping down evaporator
18:24: IEVAPIG1 is reading at 4.55e-6 Torr. The p/s will be turned on tomorrow since there is no ISAC Ops on site. |
Friday, March 25, 2011, 17:22, John Wong, , , , , Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
|
John Wong wrote:
March 23, 2011 |
Monday, May 14, 2012, 15:22, John Wong, , Target boat, , , Testing the new graphite foil from Ceramaterial
|
Monday, May 14, 2012, 15:04
Due to the differences in the use of the graphite foils in past SiC targets (C-grv foil from Alpha Aesar) and the newly prepared SiC#27 (C-grv
foil from Ceramaterial), the out-gassing period for SiC#27 took over 6 days compared to 3 days for the vacuum to come down (see https://elog.triumf.ca/TIS/Evaporator_1/47). |
Monday, May 16, 2016, 15:52, Laura Lambert, , , , , Full clean of EVAP1
|
Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.
|
Tuesday, August 23, 2016, 17:35, John Wong, , , TARGET BOAT, , Sintering TaC coated target boat
|
Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed) and wrapped with Ta-heat shield.
chamber is currently being pumped down. Vac currently at 3.3e-5Torr. |
Wednesday, June 07, 2017, 12:48, Aaron Schmidt, , , , , Turbo pump cooling
|
Wednesday, June 07, 2017, 10:00-12:00: Cooling was split/routed from two bottom lines with tees and run to the turbo pump.
|
Tuesday, August 18, 2020, 12:40, Aaron Schmidt, , , , , IEVAP:IGP1 swap out
|
INIFICON - BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: Control head for IGP1 swapped with bagged one. |
Thursday, April 15, 2021, 15:01, Marla Cervantes, , , , , IGP1 patch
|
Thursday, March 31, 2021, 14:42
EVAP1's TGHT has been tripping even when the pressure is below the tripping limits. The temperature of the turbo pump and the |
|