Friday, January 31, 2020, 15:36, Marla Cervantes, UO2/C, P2N-02, , Done, P2N target material carbothermal reduction
|
Marla Cervantes wrote:
|
Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out
|
Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Monday, June 01, 2020, 09:37: Swap complete.
|
Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out
|
Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips. |
Thursday, August 13, 2020, 14:37, Marla Cervantes, UO2/C, P2N-02, , Problems, P2N target material carbothermal reduction
|
Marla Cervantes wrote:
|
Tuesday, August 18, 2020, 12:40, Aaron Schmidt, , , , , IEVAP:IGP1 swap out
|
INIFICON - BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: Control head for IGP1 swapped with bagged one. |
Tuesday, August 18, 2020, 20:45, Marla Cervantes, UO2/C, P2N-02, , Problems resolved, P2N target material carbothermal reduction
|
Marla Cervantes wrote:
|
Wednesday, August 19, 2020, 07:49, Marla Cervantes, UO2/C, P2N-02, , Done, P2N carbothermal reduction (#2)
|
Wednesday, August 19, 2020, 07:47
XRD analysis of the P2N material showed that the carbothermal reduction was not completed
The material was loaded again in its oven, new Ta caps where secured to the edges, the body remained |
Tuesday, September 08, 2020, 20:45, Marla Cervantes, UO2/C, P2N-02, , Done, P2N-2 carbothermal reduction
|
Tuesday, September 08, 2020, 20:44
A P2N oven with three heat shields, loaded with a graphite container filled with UO2/C ring-discs
was set in the EVAP1 |
Thursday, September 10, 2020, 14:07, Marla Cervantes, UO2/C, P2N-02, , Done, P2N-2 Conditioning
|
Thursday, September 10, 2020, 14:01
A P2N target was carbothermal reduced but at the maximum current, the power supply tripped (elog. 267)
Therefore, the target was not hot long enough to fully outgas, that is why it will be reheated. |
Tuesday, March 30, 2021, 16:04, Marla Cervantes, UO2/C, P2N-02, , Done, P2N-3 carbothermal reduction
|
Green target material characteristics (elog 105)
#discs = 49 |
Thursday, April 15, 2021, 15:01, Marla Cervantes, , , , , IGP1 patch
|
Thursday, March 31, 2021, 14:42
EVAP1's TGHT has been tripping even when the pressure is below the tripping limits. The temperature of the turbo pump and the |
Wednesday, November 24, 2021, 10:38, Luca Egoriti, Ta, , , In progress, IPF release tests
|
Wednesday, November 24, 2021, 10:38
A first, short "FullTa1" target was loaded into the evap1. It consists of a short container (10 cm) with lateral thickness of ~0.2mm.
The ends of the target connect with the TGHT terminals through two copper adapters. |
Wednesday, June 01, 2022, 08:42, Darwin Ortiz Rosales, UO2/C, Target Boat, , Done, UO2 reduction Provisional ID C211209-1
|
Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous
day) |
Tuesday, June 07, 2022, 07:09, Darwin Ortiz Rosales, UO2/C, Target Boat, , Done, UO2 reduction ID C220510-1
|
Tuesday, June 07, 2022, 07:05
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous
day) |
|