ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
73
|
Friday, August 02, 2013, 11:06 |
Laura Lambert | UC2 | 38634-7 | LP-SIS | In progress | Conditioning UCx # 07 | Thursday, August 01, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2. |
|
|
74
|
Monday, August 05, 2013, 07:52 |
John Wong | UC2 | 38634-7 | LP-SIS | Done | Conditioning UCx # 07 |
|
|
|
29
|
Monday, August 29, 2011, 11:21 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 | Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night. The target oven is in the evaporator |
|
|
32
|
Tuesday, September 06, 2011, 17:05 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 |
|
|
|
34
|
Wednesday, September 07, 2011, 13:41 |
John Wong | TaC | 38634-6 | LP-SIS | Done | TaC#1: Sintering and Organics burn-off | Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125 |
|
|
25
|
Monday, July 18, 2011, 15:55 |
John Wong | Empty | 38634-3 | LP-SIS | Done | Sintering TaC coating for UCx#2 | Monday, July 18, 2011, 15:53: Target
oven was coated with TaC and let dry over
the weekend. The target is now installed |
|
|
26
|
Wednesday, July 27, 2011, 13:02 |
John Wong | UC2 | 38634-3 | LP-SIS | Problems | UCx#2 conditioning | Wednesday, July 27, 2011, 12:58:
Target length = 11.2cm
Total UC2/C foils = 245 discs |
|
|
39
|
Wednesday, September 21, 2011, 13:23 |
John Wong | Empty | 38634-10 | LP-SIS | Done | Sintering TaC coating on target oven for UCx#3 | Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. |
|
|
43
|
Thursday, November 03, 2011, 09:24 |
John Wong | UC2 | 38634-10 | LP-SIS | Done | UCx#3: Final conditioning | Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields, |
|
|
44
|
Monday, November 14, 2011, 11:56 |
Peter Kunz | UC2 | 38634-10 | LP-SIS | Done | UCx03: Conditioning up to 175A | Evaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid |
|
|
45
|
Tuesday, February 14, 2012, 21:56 |
John Wong | UO2 | 38481-9 | LP-FEBIAD | Done | UO2/Nb sintering process | Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process. |
|
|
4
|
Monday, March 28, 2011, 12:29 |
John Wong | Empty | 38481-8 | HP-FEBIAD | Done | Fins diffusion bonding | March 28, 2011
12:28: Target oven is wrapped
with 3 Ta-heat shields. Pumping down |
|
|
17
|
Wednesday, April 20, 2011, 16:42 |
John Wong | Empty | 38481-8 | HP-FEBIAD | Done | Sintering target oven coated with TaC | Wed Apr 20 16:39:46 2011: Target
oven was coated with TaC early today.
The target was allowed to dry and then wrapped |
|
|
20
|
Wednesday, May 11, 2011, 16:23 |
John Wong | SiC | 38481-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 11 16:20:21 2011: The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs). The target is wrapped with |
9x |
|
12
|
Wednesday, April 13, 2011, 10:37 |
John Wong | Empty | 38481-7 | HP-FEBIAD | Done | Diffusion bonding of Ta Fins for FEBIAD-HP | Wed Apr 13 10:37:25 2011: Target
is wrapped with 3 Ta-heat shields.
Evaporator is currently being pumped down. |
|
|
15
|
Thursday, April 14, 2011, 17:03 |
John Wong | Empty | 38481-7 | HP-FEBIAD | Problems resolved | Evap. bolt/washer problems & solutions | Thu Apr 14 14:03:17 2011:
What did we see after the fin diffusion bonding
of Ta fins for FEBIAD-HP (w.o#38481-7) |
6x |
|
7
|
Tuesday, April 05, 2011, 10:37 |
John Wong | Empty | 38481-6 | HP-FEBIAD | Done | Fins diffusion bonding | Tue Apr 5 10:36:53 2011: Target
oven is wrapped with 3 Ta-heat shields.
The evaporator is in the process of pumping |
|
|
11
|
Tuesday, April 12, 2011, 10:30 |
John Wong | Empty | 38481-5 | HP-FEBIAD | Done | Fins diffusion bonding | Tue Apr 12 10:29:38 2011: Target
wrapped with 3 Ta-heat shields. Evaporator
is currently being pumped down. |
|
|
10
|
Monday, April 11, 2011, 10:22 |
John Wong | Empty | 38295-9 | HP-FEBIAD | Done | Fins diffusion bonding | Mon Apr 11 10:21:56 2011: Target is wrapped
with 3 Ta-heat shields. Evaporator
is pumping down. |
|
|
38
|
Tuesday, September 13, 2011, 16:53 |
John Wong | SiC | 38295-9 | HP-FEBIAD | Done | Ready | Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. |
9x |