John Wong wrote: |
Laura Lambert wrote: |
Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov 3rd, 2016.
This is the first cast made with the new batch of UO2 [but from the same purchase as the last batch]
The cast peeled off the glass nicely Nov 4th, 2016 and finished drying over the weekend.
Some materials were stuck on the WC jar wall and balls, consistent with every time.
Initial UO2 powder used = 50.16g (Inventory R-01032A, UO2 + bottle = 1078.15g before use)
Graphite powder used = 10.03g
Green cast dried UO2/C + organic mass = 61.91g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield and installed in evap1 today.
Chamber is currently pumping down, IG1 = 2.4e-5 Torr.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, November 08, 2016, 07:43
IG1 = 2.4e-6 Torr
Tapped up to 35A, 0.50V
Waited ~50min, vacuum stable.
IG1 = 1.3e-5 Torr
Initiating auto-ramp
|
Tuesday, November 15, 2016, 09:59
TGHT reached to 520A/5.12V; however the pressure was still remained high at the limit 5.0e-5 Torr which indicating that the carbonization process isn't complete yet.
Increase TGHT to 520A at a ramping rate of 0.1A/min.
|
Wednesday, November 16, 2016, 11:55
*John increased maxTGHT setpoint to 530A not 520A
When the TGHT reached 520A, the vacuum was still at it's limit. Usually the vacuum starts to drop and stabilize slightly before the max setpoint is reached.
In the photo from UCx_flk10 at ~490A, the vacuum started to drop indicating the carbonization process was complete.
In the image posted from the current carbonization process one can see the vacuum was still at its limit when the TGHT reached its max set point of 520A meaning the carbonization process remains incomplete.
Thursday, November 17, 2016, 07:36
Vacuum still high, carbonization remains incomplete.
Remained at 530A for ~18hrs
TGHT = 530A, 5.24V
IG1 = 3.8e-5 Torr
Increasing max setpoint to 540A.
Thursday, November 17, 2016, 13:54
Vacuum remains high after ramping up to 540A, IG1 = 4.5e-5 Torr - still not fully carbonized
TGHT = 540A, 5.36V
Increasing max setpoint to 550A
Thursday, November 17, 2016, 15:29
Vacuum still high
Increasing max setpoint to 580A
See excel to confirm this remains under 4kW
Wouldn't want to go much above 4kW otherwise container will break
Friday, November 18, 2016, 13:14
Vacuum stable and decreasing - carbonization process complete.
Evap1 has remained at max setpoints for ~6.5hrs
IG1 = 5.6e-6 Torr
TGHT = 580A, 5.69V
Initiating auto-cool at 1.0A/min
Monday, November 21, 2016, 16:20
Vented in Ar and opened up evap1 today.
Stored in glove box.
UC2 flakes produced = 47.23g
|