Friday, October 17, 2014, 11:55, Laura Lambert, UC2, 40282-5, LP-SIS, In progress, Conditioning UCx #11
|
Monday, October 20, 2014, 16:22, John Wong, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11
|
Monday, November 10, 2014, 13:50, Laura Lambert, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11
|
|
Laura Lambert wrote: |
Friday, October 17, 2014, 11:47
Target container was previously coated with TaC spray and sintered.
It's is wrapped with 3 layers of Ta-heat shield, including the center block.
The target consists of 255 discs of UCx with 10.5cm in length.
A regular TaC coated endcap is inserted right, wrt the ionizer tube pointing down, so the left is open with a removable half-cap to allow out-gassing.
The chamber was pumped down overnight.
TGHT will be ramped up to 520A - keep heating the current for 4-5 hours.
Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.
Auto ramp at 0.1A/min.
Friday, October 17, 2014, 13:25
IG1 = 2.6e-6 Torr
Manually stepped up to 35A
Waited ~1hr15
IG1 = 4.2e-6 Torr
Initiating auto-ramp.
|
Monday, October 20, 2014, 14:10
There were two big power bumps occurred on Saturday Oct 18 and wiped all the IOC/PLC on the Evaporators. All the system, including TGHT/pumps/EPICS/Alarm handlers were found off. The ion gauge was turned on this morning and showed the pressure was around 16mTorr. (see attachment).
The pump has been turned back on; pressure is currently at 3.5e-6 Torr.
Ramping up TGHT...
Monday, November 03, 2014, 12:05
TGHT has reached to 580A and the target has conditioned at that current for about 3 days.
Cooling down at 2A/min.
Wednesday, November 05, 2014, 16:40
UCx conditioning complete.
Target is now in the Ar-glove box. End caps are inserted but need to be expanded.
Need to insert Re foil prior to assembly.
|