Entry  Tue Mar 29 15:32:08 2011, Damien Gallop, , , Controls and Panel MRO 

Controls is working on an interlock issue. Electrical panel MCC-X maintenance is planned for tomorrow afternoon.

Loaned a Horiba SEC-7320 flow controller to Mel. This unit belongs to Friedhelm.

Entry  Fri Mar 25 17:42:38 2011, Keerthi Jayamanna, , , OLIS HV start up 

High Voltage cage is on at ~17:43pm

Interlock cleard and HV (10kV) is on at 17:53pm

Entry  Wed Mar 9 11:09:02 2011, Keerthi Jayamanna, , , IOS:SSW failed 

IOS:SSW failed unexpectedly. No reason found. Came back on easily.

Entry  Sat Feb 26 22:06:03 2011, Keerthi Jayamanna, , , Ti+7 status 

90pA of Ti+7 is running smoothly. 22:05  Feb26th

Entry  Fri Feb 25 17:27:11 2011, Keerthi Jayamanna, , , Titaniums efficiency test 

Small peice of titanium wire is installed and running aroung 100pA of Ti+7 at FC6.

OSAC are OPs taking data.

Entry  Fri Feb 25 17:27:11 2011, Keerthi Jayamanna, , , Titaniums efficiency test 

Small piece of titanium foil 0.0005" thick is installed and running around 100pA of Ti+7 at FC6.

OSAC are OPs taking data.

Entry  Wed Feb 23 22:29:48 2011, Keerthi Jayamanna, , , OLIS mahnet 

Klixon at the OLIS bemding magnet is not funtioning properly.

Entry  Tue Feb 22 18:54:43 2011, Keerthi Jayamanna, , , EE and SSEE 

Both EE and SSEE problems were solved. They are working OK now.

Entry  Tue Feb 22 18:52:53 2011, Keerthi Jayamanna, , , Ti+7 efficiency studies 

2mm diameter Ti was installed to set the optics. Later 0.0005 in thick foil will be installed for real efficiency studies.

Entry  Fri Feb 18 11:43:32 2011, Keerthi Jayamanna, , , IOS: EE Status 
IOS:EE found damaged. It has been replaced with IOS:SSEE-Michael B.
Entry  Fri Feb 18 11:05:50 2011, Keerthi Jayamanna, , , OLIS Problems 
PE set point is ok but read back is half of the real value.
Entry  Fri Dec 24 13:06:07 2010, Damien Gallop, , , Merry Christmas and Happy New Year 

Our very best to all of you.

Entry  Tue Dec 21 09:43:22 2010, Damien Gallop, , , In Memoriam... Mike McDonald Mike1526.jpg

At 5:00 this morning, after a lengthy battle with cancer, Mike passed from this life to his eternal reward. He has left us a great legacy. May he rest in peace.

Entry  Mon Dec 20 09:50:07 2010, Damien Gallop, , , MCIS Development & EOB Picture_5.pngAu_Scan.pngAu_Scan_Zoom.pngAoverQ.png

Development and the quest for gold continue.

Later... Mass scans in region of 197Au33 A/q=5.97, with graph of all theoretically possible charge states in the same A/q region. The thing to note in that last graph is how clean is the region (just left of A/q=6) where 197Au33 is predicted.

Later... Panning for gold ended prematurely due to a decision to end. The reason cited was DSB:MB14.

Entry  Fri Dec 17 09:18:57 2010, Damien Gallop, , , MCIS Development Picture_1.png

Development continues in the search for gold. A=197 Present A/q=5.94, which suggests 197Au+33. It could also be a tail of 12C+2. We'll see.

Entry  Wed Dec 15 09:18:41 2010, Damien Gallop, , , MCIS Development 

Source development in preparation for Au beam in progress.

Entry  Tue Dec 14 09:15:58 2010, Damien Gallop, , , MCIS Development 

Beam development started yesterday. Looks like the HERACLES run, which started Thursday, ended yesterday morning.

Entry  Tue Dec 7 08:57:26 2010, Damien Gallop, , , 80Kr14+/40Ar7+ for SEBT Development Picture_1.png

Development should continue today. Looks like Supernanogan went through a plasma mode change overnight and settled into a new mode.

Entry  Mon Dec 6 09:08:52 2010, Damien Gallop, , , 80Kr14+/40Ar7+ for SEBT Development Picture_1.pngPicture_2.pngNoKr.pngWithKr.pngmass7point333.png

The previous 12C2+ development run from the Supernanogan ended Friday morning. Starting Friday afternoon, the Supernanogan was prepared for an upcoming SEBT development using krypton beams. The source was ready overnight. There were some teething pains over the weekend. An A/q=5.71 beam is sitting on FC6 presently. The beam schedule shows an experiment change on Thursday morning.

Later... Some notes about krypton.

Naturally occurring isotopes:
Kr-78   ( 0.35% , 2.0E+21 ) Kr-80   ( 2.25% ) Kr-82   ( 11.6% ) Kr-83   ( 11.5% ) Kr-84   ( 57.0% ) Kr-86   ( 17.3% )

Some A/q values:

  • 40/7 = 5.7143
  • 80/14 = 5.7143
  • 82/14 = 5.8571
  • 82/15 = 5.4667
  • 83/15 = 5.5333
  • 84/15 = 5.6
  • 86/15 = 5.7333

Keerthi's mass scans from Saturday:

  1. Background scan
  2. Krypton scan (note multi-peaks in A/q = 5.7 to 5.75 range)
  3. FC6 at A/q=7.3333

 

 

Entry  Fri Dec 3 09:37:14 2010, Damien Gallop, , , 12C2+ for Commissioning 15x

Last moments of beam development for SEBT commissioning. Attached is an FC6 plot and the present optics and 1mm slits. Decision was to not do a vertical emittance scan at this time, but proceed with 15Kr development, up next. Before we shut off, one last emittance scan coming up.

Later... Emittance scan with 2.5mm slits (default position setting used) in progress... Done. 101203_1017ILTEMIT.txt. Looks a little boxy... Both raw and cleaned-up versions attached.

Next: Emittance scan with 5mm slits... Done. 101203_1039ILTEMIT.txt. Looks a little more boxy... Both raw and cleaned-up versions attached.

Next: Repeat scan with original 1mm slits and scanner settings... Done. 101203_1104ILTEMIT.txt. It reproduced. Both raw and cleaned-up versions plus scanner panel attached.

Next: Quick look at 16O beams before shutting off...