OLIS Logbook General
  General, Page 7 of 26  Not logged in ELOG logo
  ID Date Author Type Category Subject
  393   Tue Mar 29 15:32:08 2011 Damien Gallop  Controls and Panel MRO

Controls is working on an interlock issue. Electrical panel MCC-X maintenance is planned for tomorrow afternoon.

Loaned a Horiba SEC-7320 flow controller to Mel. This unit belongs to Friedhelm.

  392   Fri Mar 25 17:42:38 2011 Keerthi Jayamanna  OLIS HV start up

High Voltage cage is on at ~17:43pm

Interlock cleard and HV (10kV) is on at 17:53pm

  391   Wed Mar 9 11:09:02 2011 Keerthi Jayamanna  IOS:SSW failed

IOS:SSW failed unexpectedly. No reason found. Came back on easily.

  390   Sat Feb 26 22:06:03 2011 Keerthi Jayamanna  Ti+7 status

90pA of Ti+7 is running smoothly. 22:05  Feb26th

  389   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency test

Small peice of titanium wire is installed and running aroung 100pA of Ti+7 at FC6.

OSAC are OPs taking data.

  388   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency test

Small piece of titanium foil 0.0005" thick is installed and running around 100pA of Ti+7 at FC6.

OSAC are OPs taking data.

  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnet

Klixon at the OLIS bemding magnet is not funtioning properly.

  386   Tue Feb 22 18:54:43 2011 Keerthi Jayamanna  EE and SSEE

Both EE and SSEE problems were solved. They are working OK now.

  385   Tue Feb 22 18:52:53 2011 Keerthi Jayamanna  Ti+7 efficiency studies

2mm diameter Ti was installed to set the optics. Later 0.0005 in thick foil will be installed for real efficiency studies.

  384   Fri Feb 18 11:43:32 2011 Keerthi Jayamanna  IOS: EE Status
IOS:EE found damaged. It has been replaced with IOS:SSEE-Michael B.
  383   Fri Feb 18 11:05:50 2011 Keerthi Jayamanna  OLIS Problems
PE set point is ok but read back is half of the real value.
  382   Fri Dec 24 13:06:07 2010 Damien Gallop  Merry Christmas and Happy New Year

Our very best to all of you.

  381   Tue Dec 21 09:43:22 2010 Damien Gallop  In Memoriam... Mike McDonald

At 5:00 this morning, after a lengthy battle with cancer, Mike passed from this life to his eternal reward. He has left us a great legacy. May he rest in peace.

Attachment 1: Mike1526.jpg
Mike1526.jpg
  380   Mon Dec 20 09:50:07 2010 Damien Gallop  MCIS Development & EOB

Development and the quest for gold continue.

Later... Mass scans in region of 197Au33 A/q=5.97, with graph of all theoretically possible charge states in the same A/q region. The thing to note in that last graph is how clean is the region (just left of A/q=6) where 197Au33 is predicted.

Later... Panning for gold ended prematurely due to a decision to end. The reason cited was DSB:MB14.

Attachment 1: Picture_5.png
Picture_5.png
Attachment 2: Au_Scan.png
Au_Scan.png
Attachment 3: Au_Scan_Zoom.png
Au_Scan_Zoom.png
Attachment 4: AoverQ.png
AoverQ.png
  379   Fri Dec 17 09:18:57 2010 Damien Gallop  MCIS Development

Development continues in the search for gold. A=197 Present A/q=5.94, which suggests 197Au+33. It could also be a tail of 12C+2. We'll see.

Attachment 1: Picture_1.png
Picture_1.png
  378   Wed Dec 15 09:18:41 2010 Damien Gallop  MCIS Development

Source development in preparation for Au beam in progress.

  377   Tue Dec 14 09:15:58 2010 Damien Gallop  MCIS Development

Beam development started yesterday. Looks like the HERACLES run, which started Thursday, ended yesterday morning.

  376   Tue Dec 7 08:57:26 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT Development

Development should continue today. Looks like Supernanogan went through a plasma mode change overnight and settled into a new mode.

Attachment 1: Picture_1.png
Picture_1.png
  375   Mon Dec 6 09:08:52 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT Development

The previous 12C2+ development run from the Supernanogan ended Friday morning. Starting Friday afternoon, the Supernanogan was prepared for an upcoming SEBT development using krypton beams. The source was ready overnight. There were some teething pains over the weekend. An A/q=5.71 beam is sitting on FC6 presently. The beam schedule shows an experiment change on Thursday morning.

Later... Some notes about krypton.

Naturally occurring isotopes:
Kr-78   ( 0.35% , 2.0E+21 ) Kr-80   ( 2.25% ) Kr-82   ( 11.6% ) Kr-83   ( 11.5% ) Kr-84   ( 57.0% ) Kr-86   ( 17.3% )

Some A/q values:

  • 40/7 = 5.7143
  • 80/14 = 5.7143
  • 82/14 = 5.8571
  • 82/15 = 5.4667
  • 83/15 = 5.5333
  • 84/15 = 5.6
  • 86/15 = 5.7333

Keerthi's mass scans from Saturday:

  1. Background scan
  2. Krypton scan (note multi-peaks in A/q = 5.7 to 5.75 range)
  3. FC6 at A/q=7.3333

 

 

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: Picture_2.png
Picture_2.png
Attachment 3: NoKr.png
NoKr.png
Attachment 4: WithKr.png
WithKr.png
Attachment 5: mass7point333.png
mass7point333.png
  374   Fri Dec 3 09:37:14 2010 Damien Gallop  12C2+ for Commissioning

Last moments of beam development for SEBT commissioning. Attached is an FC6 plot and the present optics and 1mm slits. Decision was to not do a vertical emittance scan at this time, but proceed with 15Kr development, up next. Before we shut off, one last emittance scan coming up.

Later... Emittance scan with 2.5mm slits (default position setting used) in progress... Done. 101203_1017ILTEMIT.txt. Looks a little boxy... Both raw and cleaned-up versions attached.

Next: Emittance scan with 5mm slits... Done. 101203_1039ILTEMIT.txt. Looks a little more boxy... Both raw and cleaned-up versions attached.

Next: Repeat scan with original 1mm slits and scanner settings... Done. 101203_1104ILTEMIT.txt. It reproduced. Both raw and cleaned-up versions plus scanner panel attached.

Next: Quick look at 16O beams before shutting off...

Attachment 1: Picture_1.png
Picture_1.png
Attachment 2: Picture_2.png
Picture_2.png
Attachment 3: Picture_3.png
Picture_3.png
Attachment 4: Picture_4.png
Picture_4.png
Attachment 5: Picture_5.png
Picture_5.png
Attachment 6: Picture_6.png
Picture_6.png
Attachment 7: Picture_7.png
Picture_7.png
Attachment 8: Picture_8.png
Picture_8.png
Attachment 9: Picture_9.png
Picture_9.png
Attachment 10: Picture_10.png
Picture_10.png
Attachment 11: Picture_11.png
Picture_11.png
Attachment 12: Picture_12.png
Picture_12.png
Attachment 13: Picture_13.png
Picture_13.png
Attachment 14: Picture_14.png
Picture_14.png
Attachment 15: Picture_15.png
Picture_15.png
ELOG V2.9.2-2455