OLIS Logbook General
  General, Page 7 of 26  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subject Text Attachments
  393   Tue Mar 29 15:32:08 2011 Damien Gallop  Controls and Panel MROControls is working on an interlock issue.
Electrical panel MCC-X maintenance is planned
for tomorrow afternoon.
  
  392   Fri Mar 25 17:42:38 2011 Keerthi Jayamanna  OLIS HV start upHigh Voltage cage is on at ~17:43pm
Interlock cleard and HV (10kV) is
on at 17:53pm
  
  391   Wed Mar 9 11:09:02 2011 Keerthi Jayamanna  IOS:SSW failedIOS:SSW failed unexpectedly. No reason
found. Came back on easily.
  
  390   Sat Feb 26 22:06:03 2011 Keerthi Jayamanna  Ti+7 status90pA of Ti+7 is running smoothly. 22:05 
Feb26th
  
  389   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall peice of titanium wire is installed
and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
  
  388   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall piece of titanium foil 0.0005"
thick is installed and running around 100pA
of Ti+7 at FC6.
  
  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnetKlixon at the OLIS bemding magnet is not
funtioning properly.
  
  386   Tue Feb 22 18:54:43 2011 Keerthi Jayamanna  EE and SSEEBoth EE and SSEE problems were solved.
They are working OK now.
  
  385   Tue Feb 22 18:52:53 2011 Keerthi Jayamanna  Ti+7 efficiency studies2mm diameter Ti was installed to set the
optics. Later 0.0005 in thick foil will be
installed for real efficiency studies.
  
  384   Fri Feb 18 11:43:32 2011 Keerthi Jayamanna  IOS: EE StatusIOS:EE found damaged. It has been replaced
with IOS:SSEE-Michael B.
  
  383   Fri Feb 18 11:05:50 2011 Keerthi Jayamanna  OLIS ProblemsPE set point is ok but read back is half of
the real value.
  
  382   Fri Dec 24 13:06:07 2010 Damien Gallop  Merry Christmas and Happy New YearOur very best to all of you.   
  381   Tue Dec 21 09:43:22 2010 Damien Gallop  In Memoriam... Mike McDonaldAt 5:00 this morning, after a lengthy battle
with cancer, Mike passed from this life to
his eternal reward. He has left us a great
 Mike1526.jpg 
  380   Mon Dec 20 09:50:07 2010 Damien Gallop  MCIS Development & EOBDevelopment and the quest for gold continue.
Later... Mass scans in region of
197Au33 A/q=5.97, with graph of all theoretically
 Picture_5.pngAu_Scan.pngAu_Scan_Zoom.pngAoverQ.png 
  379   Fri Dec 17 09:18:57 2010 Damien Gallop  MCIS DevelopmentDevelopment continues in the search for
gold. A=197 Present A/q=5.94, which suggests
197Au+33. It could also be a tail of 12C+2.
 Picture_1.png 
  378   Wed Dec 15 09:18:41 2010 Damien Gallop  MCIS DevelopmentSource development in preparation for Au
beam in progress.
  
  377   Tue Dec 14 09:15:58 2010 Damien Gallop  MCIS DevelopmentBeam development started yesterday. Looks
like the HERACLES run, which started Thursday,
ended yesterday morning.
  
  376   Tue Dec 7 08:57:26 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT DevelopmentDevelopment should continue today. Looks
like Supernanogan went through a plasma mode
change overnight and settled into a new mode.
 Picture_1.png 
  375   Mon Dec 6 09:08:52 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT DevelopmentThe previous 12C2+ development run from
the Supernanogan ended Friday morning. Starting
Friday afternoon, the Supernanogan was prepared
 Picture_1.pngPicture_2.pngNoKr.pngWithKr.pngmass7point333.png 
  374   Fri Dec 3 09:37:14 2010 Damien Gallop  12C2+ for CommissioningLast moments of beam development for SEBT
commissioning. Attached is an FC6 plot and
the present optics and 1mm slits. Decision
 15x 
ELOG V2.9.2-2455