Entry  Mon May 24 22:42:51 2010, Keerthi Jayamanna, , , 33S development Picture_1.png
Tried to see the background before 33S installation. Found few problems: MCIS:YCB1 does not hold more than
58V.
Very difficult to transport the beam without YCB1. Need to find a solution. Open and fix it is not
Entry  Tue May 25 00:19:18 2010, Keerthi Jayamanna, , , 33S 
 
Finally got something going. YCB1 short to the ground. YCB common plate connected to YCB1 power supply. We were lucky.
Polarity was right. Ran the source with no 33S.
Saved file as “backgroundNo33S.dat” No optics set yet.
Entry  Tue May 25 11:28:00 2010, Keerthi Jayamanna, , , 33D dev 
after 24 hours background spectrum saved as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power= 0, Output power (dB)=0  
Entry  Tue May 25 11:58:02 2010, Keerthi Jayamanna, , , 33S dev 
after 24 hours background spectrum saved as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power= 5W, Output power (dB)=36.4
Entry  Tue May 25 22:02:41 2010, Keerthi Jayamanna, , , 33S spectrum 
33S spectrum is saved as 33S_spectrum.dat 
Entry  Fri Feb 18 11:05:50 2011, Keerthi Jayamanna, , , OLIS Problems 
PE set point is ok but read back is half of the real value.
Entry  Fri Feb 18 11:43:32 2011, Keerthi Jayamanna, , , IOS: EE Status 
IOS:EE found damaged. It has been replaced with IOS:SSEE-Michael B.
Entry  Tue Feb 22 18:52:53 2011, Keerthi Jayamanna, , , Ti+7 efficiency studies 
2mm diameter Ti was installed to set the optics. Later 0.0005 in thick foil will be installed for real efficiency studies.
Entry  Tue Feb 22 18:54:43 2011, Keerthi Jayamanna, , , EE and SSEE 
Both EE and SSEE problems were solved. They are working OK now.
Entry  Wed Feb 23 22:29:48 2011, Keerthi Jayamanna, , , OLIS mahnet 
Klixon at the OLIS bemding magnet is not funtioning properly.
Entry  Fri Feb 25 17:27:11 2011, Keerthi Jayamanna, , , Titaniums efficiency test 
Small peice of titanium wire is installed and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
Entry  Fri Feb 25 17:27:11 2011, Keerthi Jayamanna, , , Titaniums efficiency test 
Small piece of titanium foil 0.0005" thick is installed and running around 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
Entry  Sat Feb 26 22:06:03 2011, Keerthi Jayamanna, , , Ti+7 status 
90pA of Ti+7 is running smoothly. 22:05  Feb26th
Entry  Wed Mar 9 11:09:02 2011, Keerthi Jayamanna, , , IOS:SSW failed 
IOS:SSW failed unexpectedly. No reason found. Came back on easily.
Entry  Fri Mar 25 17:42:38 2011, Keerthi Jayamanna, , , OLIS HV start up 
High Voltage cage is on at ~17:43pm
Interlock cleard and HV (10kV) is on at 17:53pm
Entry  Wed Jul 20 01:37:46 2011, Keerthi Jayamanna, , , Al beam development: 
 
Supernanogan is tested for Al+6 beam production.
A 8nA of mass 4.5 is seen. Background pressure is not good enough to
produce
more Al+6. Attempt to increase Al beam current with higher sputtering
voltages resulted in fast destruction of the Al sample.
Decided
Entry  Wed Aug 3 00:15:39 2011, Keerthi Jayamanna, Other, General, 22Ne+2 
Source started at 800W of microwave power and 2cc/min neon gas easily. New magnetron produces more power than the old one.
We should try to keep MW power under 500W during running and use only 800W for ignition.  EE left off for the night.
Entry  Wed May 23 17:11:57 2012, Keerthi Jayamanna, , , Changed beam to 12C++ beam 
Removed titanium from the back plate and clean the source.
But left the PE titanium insert since Bob and Marco badly want the 12C++ beam from the source fast.
Background 12C++ was only 400pA so installed a small canister with CO in it with bellow atm. pressure.
Entry  Sun Dec 2 22:32:19 2012, Keerthi Jayamanna, Routine, General, Still cannot write anything other than Subject 
 
Entry  Sun Dec 2 22:34:09 2012, Keerthi Jayamanna, , , Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam 
 