  275   Mon May 24 22:42:51 2010 Keerthi Jayamanna  33S developmentTried to see the background before 33S
installation. Found few problems: MCIS:YCB1
 Picture_1.png 
  276   Tue May 25 00:19:18 2010 Keerthi Jayamanna  33S 
Finally
got something going. YCB1 short to the ground.
  
  277   Tue May 25 11:28:00 2010 Keerthi Jayamanna  33D devafter 24 hours background spectrum saved
as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power=
  
  278   Tue May 25 11:58:02 2010 Keerthi Jayamanna  33S devafter 24 hours background spectrum saved
as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power=
  
  279   Tue May 25 22:02:41 2010 Keerthi Jayamanna  33S spectrum33S spectrum is saved as 33S_spectrum.dat    
  383   Fri Feb 18 11:05:50 2011 Keerthi Jayamanna  OLIS ProblemsPE set point is ok but read back is half of
the real value.
  
  384   Fri Feb 18 11:43:32 2011 Keerthi Jayamanna  IOS: EE StatusIOS:EE found damaged. It has been replaced
with IOS:SSEE-Michael B.
  
  385   Tue Feb 22 18:52:53 2011 Keerthi Jayamanna  Ti+7 efficiency studies2mm diameter Ti was installed to set the
optics. Later 0.0005 in thick foil will be
installed for real efficiency studies.
  
  386   Tue Feb 22 18:54:43 2011 Keerthi Jayamanna  EE and SSEEBoth EE and SSEE problems were solved.
They are working OK now.
  
  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnetKlixon at the OLIS bemding magnet is not
funtioning properly.
  
  389   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall peice of titanium wire is installed
and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
  
  388   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall piece of titanium foil 0.0005"
thick is installed and running around 100pA
of Ti+7 at FC6.
  
  390   Sat Feb 26 22:06:03 2011 Keerthi Jayamanna  Ti+7 status90pA of Ti+7 is running smoothly. 22:05 
Feb26th
  
  391   Wed Mar 9 11:09:02 2011 Keerthi Jayamanna  IOS:SSW failedIOS:SSW failed unexpectedly. No reason
found. Came back on easily.
  
  392   Fri Mar 25 17:42:38 2011 Keerthi Jayamanna  OLIS HV start upHigh Voltage cage is on at ~17:43pm
Interlock cleard and HV (10kV) is
on at 17:53pm
  
  415   Wed Jul 20 01:37:46 2011 Keerthi Jayamanna  Al beam development: 
Supernanogan is tested for Al+6
beam production.
A 8nA of mass
  
  417   Wed Aug 3 00:15:39 2011 Keerthi JayamannaOtherGeneral22Ne+2Source started at 800W of microwave power
and 2cc/min neon gas easily. New magnetron
produces more power than the old one.
  
  468   Wed May 23 17:11:57 2012 Keerthi Jayamanna  Changed beam to 12C++ beamRemoved titanium from the back plate and
clean the source.
But left the PE titanium insert since
  
  469   Sun Dec 2 22:32:19 2012 Keerthi JayamannaRoutineGeneralStill cannot write anything other than Subject    
  470   Sun Dec 2 22:34:09 2012 Keerthi Jayamanna  Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam    