275
Mon May 24 22:42:51 2010
Keerthi Jayamanna
33S development
Tried to see the background before 33S
installation. Found few problems: MCIS:YCB1
276
Tue May 25 00:19:18 2010
Keerthi Jayamanna
33S
Finally
got something going. YCB1 short to the ground.
277
Tue May 25 11:28:00 2010
Keerthi Jayamanna
33D dev
after 24 hours background spectrum saved
as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power=
278
Tue May 25 11:58:02 2010
Keerthi Jayamanna
33S dev
after 24 hours background spectrum saved
as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power=
279
Tue May 25 22:02:41 2010
Keerthi Jayamanna
33S spectrum
33S spectrum is saved as 33S_spectrum.dat
383
Fri Feb 18 11:05:50 2011
Keerthi Jayamanna
OLIS Problems
PE set point is ok but read back is half of
the real value.
384
Fri Feb 18 11:43:32 2011
Keerthi Jayamanna
IOS: EE Status
IOS:EE found damaged. It has been replaced
with IOS:SSEE-Michael B.
385
Tue Feb 22 18:52:53 2011
Keerthi Jayamanna
Ti+7 efficiency studies
2mm diameter Ti was installed to set the
optics. Later 0.0005 in thick foil will be
installed for real efficiency studies.
386
Tue Feb 22 18:54:43 2011
Keerthi Jayamanna
EE and SSEE
Both EE and SSEE problems were solved.
They are working OK now.
387
Wed Feb 23 22:29:48 2011
Keerthi Jayamanna
OLIS mahnet
Klixon at the OLIS bemding magnet is not
funtioning properly.
389
Fri Feb 25 17:27:11 2011
Keerthi Jayamanna
Titaniums efficiency test
Small peice of titanium wire is installed
and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
388
Fri Feb 25 17:27:11 2011
Keerthi Jayamanna
Titaniums efficiency test
Small piece of titanium foil 0.0005"
thick is installed and running around 100pA
of Ti+7 at FC6.
390
Sat Feb 26 22:06:03 2011
Keerthi Jayamanna
Ti+7 status
90pA of Ti+7 is running smoothly. 22:05
Feb26th
391
Wed Mar 9 11:09:02 2011
Keerthi Jayamanna
IOS:SSW failed
IOS:SSW failed unexpectedly. No reason
found. Came back on easily.
392
Fri Mar 25 17:42:38 2011
Keerthi Jayamanna
OLIS HV start up
High Voltage cage is on at ~17:43pm
Interlock cleard and HV (10kV) is
on at 17:53pm
415
Wed Jul 20 01:37:46 2011
Keerthi Jayamanna
Al beam development:
Supernanogan is tested for Al+6
beam production.
A 8nA of mass
417
Wed Aug 3 00:15:39 2011
Keerthi Jayamanna
Other
General
22Ne+2
Source started at 800W of microwave power
and 2cc/min neon gas easily. New magnetron
produces more power than the old one.
468
Wed May 23 17:11:57 2012
Keerthi Jayamanna
Changed beam to 12C++ beam
Removed titanium from the back plate and
clean the source.
But left the PE titanium insert since
469
Sun Dec 2 22:32:19 2012
Keerthi Jayamanna
Routine
General
Still cannot write anything other than Subject
470
Sun Dec 2 22:34:09 2012
Keerthi Jayamanna
Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam