  275   Mon May 24 22:42:51 2010 Keerthi Jayamanna  33S development

Tried to see the background before 33S installation. Found few problems: MCIS:YCB1 does not hold more than 58V.

Very difficult to transport the beam without YCB1. Need to find a solution. Open and fix it is not an option even though we have a ready spare. It will take two weeks to get the vacuum back.

------------------------------

Outgoing TIGRESS experiment was the occasion for another ISAC milestone, 8MeV/u through the SCC for the first time just around midnight last Friday, May 21st. This also represented the first 8MeV/u beam to an experiment. And we can proudly say that OLIS beam was used. TIGRESS run ended at 08:30 as scheduled. Attached is a trar graph of beam on FC6, snapped periodically throughout the run. As before, you can see a small daily variation likely related to temperature of NA-LCW. There were reports of HPL tests this past Thursday and Friday. Evidently no effect over here.

 

Attachment 1: Picture_1.png
Picture_1.png
  276   Tue May 25 00:19:18 2010 Keerthi Jayamanna  33S

 

Finally got something going. YCB1 short to the ground. YCB common plate connected to YCB1 power supply. We were lucky. Polarity was right. Ran the source with no 33S.
Saved file as “backgroundNo33S.dat” No optics set yet. SO2 connected not open yet. 33S 17% is in the oven, but not heated yet.
  277   Tue May 25 11:28:00 2010 Keerthi Jayamanna  33D dev

after 24 hours background spectrum saved as "BackgroungNo33S002.dat"

RF Amplitude :1.553 , RFoutput power= 0, Output power (dB)=0  

  278   Tue May 25 11:58:02 2010 Keerthi Jayamanna  33S dev

after 24 hours background spectrum saved as "BackgroungNo33S003.dat"

RF Amplitude :7.767 , RFoutput power= 5W, Output power (dB)=36.4

  279   Tue May 25 22:02:41 2010 Keerthi Jayamanna  33S spectrum

33S spectrum is saved as 33S_spectrum.dat 

  383   Fri Feb 18 11:05:50 2011 Keerthi Jayamanna  OLIS Problems
PE set point is ok but read back is half of the real value.
  384   Fri Feb 18 11:43:32 2011 Keerthi Jayamanna  IOS: EE Status
IOS:EE found damaged. It has been replaced with IOS:SSEE-Michael B.
  385   Tue Feb 22 18:52:53 2011 Keerthi Jayamanna  Ti+7 efficiency studies

2mm diameter Ti was installed to set the optics. Later 0.0005 in thick foil will be installed for real efficiency studies.

  386   Tue Feb 22 18:54:43 2011 Keerthi Jayamanna  EE and SSEE

Both EE and SSEE problems were solved. They are working OK now.

  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnet

Klixon at the OLIS bemding magnet is not funtioning properly.

  389   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency test

Small peice of titanium wire is installed and running aroung 100pA of Ti+7 at FC6.

OSAC are OPs taking data.

  388   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency test

Small piece of titanium foil 0.0005" thick is installed and running around 100pA of Ti+7 at FC6.

OSAC are OPs taking data.

  390   Sat Feb 26 22:06:03 2011 Keerthi Jayamanna  Ti+7 status

90pA of Ti+7 is running smoothly. 22:05  Feb26th

  391   Wed Mar 9 11:09:02 2011 Keerthi Jayamanna  IOS:SSW failed

IOS:SSW failed unexpectedly. No reason found. Came back on easily.

  392   Fri Mar 25 17:42:38 2011 Keerthi Jayamanna  OLIS HV start up

High Voltage cage is on at ~17:43pm

Interlock cleard and HV (10kV) is on at 17:53pm

  415   Wed Jul 20 01:37:46 2011 Keerthi Jayamanna  Al beam development:

 

Supernanogan is tested for Al+6 beam production.
A 8nA of mass 4.5 is seen. Background pressure is not good enough to
produce more Al+6. Attempt to increase Al beam current with higher sputtering
voltages resulted in fast destruction of the Al sample.
Decided to move to the microwave ion source.
Clean all the Mg and installed Al liners and the Al PE electrode.

Source is now pumping down. Damien, Please start the source as soon as you arive. Try to keep PE current below 500mA. Optimum is ~200mA

  417   Wed Aug 3 00:15:39 2011 Keerthi JayamannaOtherGeneral22Ne+2

Source started at 800W of microwave power and 2cc/min neon gas easily. New magnetron produces more power than the old one.

We should try to keep MW power under 500W during running and use only 800W for ignition.  EE left off for the night.

  468   Wed May 23 17:11:57 2012 Keerthi Jayamanna  Changed beam to 12C++ beam

Removed titanium from the back plate and clean the source.

But left the PE titanium insert since Bob and Marco badly want the 12C++ beam from the source fast.

Background 12C++ was only 400pA so installed a small canister with CO in it with bellow atm. pressure.

Now source is running with ~2nA current.

  469   Sun Dec 2 22:32:19 2012 Keerthi JayamannaRoutineGeneralStill cannot write anything other than Subject
  470   Sun Dec 2 22:34:09 2012 Keerthi Jayamanna  Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam