  11   Tue Jun 9 16:53:55 2009 Damien GallopRoutineGeneralSupernanogan development in progressKeerthi started the Supernanogan source
today. His primary goal was to test out Rick's
theoretical tune calculations. He was ecstatic
  
  40   Thu Jul 2 11:58:18 2009 Damien GallopRoutineGeneralSupernanogan development in progressHappy Canada Day!
I noticed a long-term trend in beam
intensity. I have every reason to believe
 Picture_29.pnggrab.x14914.pnggrab.C15389.png 
  72   Wed Jul 15 09:20:26 2009 Damien Gallop  Supernanogan development in progressProposed run plan for this time:

    Document TIGRESS tune.

   18O4+ emittance scan.
    Mass
  
  106   Fri Jul 17 11:10:21 2009 Damien Gallop  Supernanogan development doneBeam switched back to 18O4+ by 11:00 as
agreed. Some glitches. Here are snapshots
of how it looked at handover time.
 6x 
  69   Mon Jul 13 17:41:04 2009 Damien Gallop  Supernanogan development Monday morningAs noted, Keerthi was called to restart
the source after a power bump. He continued
Supernanogan development through the night
 Picture_20.png 
  263   Fri May 7 12:29:41 2010 Keerthi Jayamanna  Supernanogan developmentSupernanogan development for 33S started.
All MW and MW and MCIS power sypplies are
off.
  
  266   Mon May 10 16:42:55 2010 Damien Gallop  Supernanogan developmentBy agreement, the source came down this
morning for continuing Supernanogan development.
Main event: leak detecting.
  
  267   Tue May 11 08:55:41 2010 Damien Gallop  Supernanogan developmentLeak checking on the Supernanogan continues
today. We are preparing for an up-coming
33S run, for which we want "perfect"
 grab.tg1846.pnggrab.bE1993.pnggrab.ed2041.pnggrab.or2050.png 
  12   Tue Jun 9 20:49:32 2009 Damien GallopRoutineGeneralSupernanogan RF & IOS slitsI have been testing various RF power settings
for cold starts and beam stability. No surprise,
the best tuner setting is approximately midway
 grab.T18854.pnggrab.s18900.png 
  418   Mon Aug 8 17:08:28 2011 Damien Gallop  Supernanogan MROCart removed for source servicing. Source
opened and split at front seal. Ground and
plasma electrodes removed. All internal areas
 grab.w19243.pnggrab.q19378.png 
  35   Tue Jun 30 09:33:00 2009 Damien GallopRoutineGeneralSupernanogan Development begins today for two weeksSupernanogan development starts today.
The TACTIC run, which ended around 08:30
today, appears to have been a success. TACTIC
  
  129   Mon Aug 17 13:58:35 2009 Damien Gallop  Supernanogan Development begins today for one weekSupernanogan Development begins. It will
be a marathon. Main goals are high-charge
emittance scans and RF frequency scans. Tall
 Picture_43.pnggrab.a30699.png 
  193   Thu Nov 26 06:20:21 2009 Keerthi Jayamanna  Supernanogan DevelopmentSwiched off all the pumps and ion gauge
for oven installation.
 
  
  493   Thu Oct 30 22:09:02 2014 Keerthi Jayamanna  Suoernanogan steeringIOS mass scan does not work.
A/Q        
   FC6     
  
  26   Fri Jun 19 20:15:19 2009 Damien GallopRoutineGeneralSummary of 16On+ emittance scansHere is a list of 16On+ emittance scans
for today. Although IOSIOC got rebooted,
restored tune was identical and trouble-free,
  
  469   Sun Dec 2 22:32:19 2012 Keerthi JayamannaRoutineGeneralStill cannot write anything other than Subject    
  513   Wed Feb 22 21:51:40 2017 Keerthi Jayamanna  SIS first beam is N1+1Chris confirmed the first SIS beam would
be Na+1. Next Rb+1 and then Li+1
  
  501   Thu Nov 13 16:31:54 2014 Brian MinatoOtherOtherSISA new SIS source has been installed. 
The oven has been loaded with Sodium Hydrogen
Carbonate (Alfa Aesar 10863) and Rubidium
  
  509   Wed Apr 29 07:48:22 2015 Brian MinatoOtherOtherRepair- Water leak inside HV cageA water leak was reported inside the HV
cage (FR#8079).  The cage was accessed
to determine the source of the leak (WP#I2015-04-27-1).
  
  43   Fri Jul 3 10:29:15 2009 Damien GallopRoutineGeneralRF frequency scans versus each charge state of 16O cont'd.16O2+ beam on FC6 = 10nA as before. Move
to 16O3+ A/q = 5.33...
A frequency scan between 13 &
 grab.Cr7150.pnggrab.yi7257.pnggrab.vt7264.pnggrab.vP7271.png 