OLIS Logbook General
  General, Page 25 of 26  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  33   Wed Jun 24 10:27:23 2009 Damien GallopRoutineGeneral16O2+ tune ready for Sophia and MarcoSee ISAC elog entry today. 
Keerthi developed a dual-mode tune last night,
so that we can run the MWS at will if so
 Picture_22.pngPicture_23.pnggrab.s21695.pnggrab.H11995.png 
  32   Tue Jun 23 18:04:30 2009 Damien GallopRoutineGeneralMCIS HV conditioning to 20KVSupernanogan bias for this run is 16.32KV.
After we were finished with source tuning,
etc., we conditioned up to 20KV. Then beam
 grab.Vd9281.png 
  31   Tue Jun 23 16:48:00 2009 Damien GallopRoutineGeneral16O2+ on FC6 after source tuningAfter a first round of source and line
tuning for good current with minimum RF power,
we have about 8nA of 16O2+ on FC6. Here is
 grab.IW8732.pnggrab.wS8740.pnggrab.mb8690.pnggrab.ON8795.png 
  30   Tue Jun 23 15:02:38 2009 Damien GallopRoutineGeneral16O2+ on FC6We now have about 80nA of 16O2+, using
the same source parameters as before. Keep
a watch for a while, then tune the source
 grab.wE8003.pnggrab.YK8019.pnggrab.HH8254.pnggrab.WH8272.pnggrab.ly8245.png 
  29   Tue Jun 23 10:33:43 2009 Damien GallopRoutineGeneralEffects of RF on charge stateToday is the last day of this set of Supernanogan
Development. The source ran at 16KV overnight,
in anticipation of 16O2+ delivery later today.
 grab.aS7166.pnggrab.WZ7540.pnggrab.Ku7550.pnggrab.Pv7570.png 
  28   Mon Jun 22 20:28:37 2009 Damien GallopRoutineGeneralPreparations for 16O2+ deliveryIn anticipation of 16O2+ delivery mid-week,
we checked 16O2+ production from the Supernanogan
source. No problem. We did have to use the
 6x 
  27   Mon Jun 22 16:00:04 2009 Damien GallopRoutineGeneralEmittance thoughts and other mattersAn emittance scan of the 16O7+ beam follows.
Also, a stripchart of the same beam on FC6
overnight. Keerthi did some studies over
 7x 
  26   Fri Jun 19 20:15:19 2009 Damien GallopRoutineGeneralSummary of 16On+ emittance scansHere is a list of 16On+ emittance scans
for today. Although IOSIOC got rebooted,
restored tune was identical and trouble-free,
  
  25   Fri Jun 19 11:59:49 2009 Damien GallopRoutineGeneral16On+ emittance scans continueKeerthi developed a nice 16O7+ beam to
FC6 last night. Beam current is about 3nA
presently. Here is the first emittance scan
 18x 
  24   Thu Jun 18 09:38:52 2009 Damien GallopRoutineGeneralCheck Supernanogan beam after IOC reboot yesterdayAs mentioned before, IOSIOC was rebooted
yesterday afternoon to unfreeze the emittance
rig panel. It cost us our tune, which unfortunately
 15x 
  23   Wed Jun 17 17:01:07 2009 Damien GallopRoutineGeneral16On+ emittance scansA series of 16On+ emittance scans. Benchmark
scan of 16O5+ matched well with same scan
done this morning. Subsequent scans beginning
  
  22   Wed Jun 17 10:14:57 2009 Damien GallopRoutineGeneral16O5+ on FC6 overnightThe 16O5+ beam stayed up OK overnight.
ICR took some emittance
scans this morning. They look interesting.
 6x 
  21   Tue Jun 16 16:47:02 2009 Damien GallopRoutineGeneralMass scan around 16O5+Keerthi suggested using 16O5+ for optimizing
the source. I did a tight mass scan in that
area, and 16O5+ is clearly visible. I will
 grab.W16564.pnggrab.W24269.pnggrab.x24327.pnggrab.w24262.png 
  20   Tue Jun 16 12:10:17 2009 Damien GallopRoutineGeneral84Kr charge states begun


   
        
            
 grab.c14389.pnggrab.Q14911.pnggrab.T15712.pnggrab.F15724.png 
  19   Mon Jun 15 17:49:23 2009 Damien GallopRoutineGeneral84Kr charge states begunWe began looking at 84Kr this weekend.
Keerthi had 84Kr19+ on FC6 this morning,
which I was able to tweak up from ~300epA
  
  18   Fri Jun 12 14:24:49 2009 Damien GallopRoutineGeneral17O3+ beam at optimized RFA comment about RF power came up at the
presentation this morning. Intense X-rays
can be produced not only at the peak efficiency
 grab.Q22311.pnggrab.Z22325.pnggrab.F22387.png 
  17   Fri Jun 12 14:12:04 2009 Damien GallopRoutineGeneralOLIS & Supernanogan Facilities presentationPresentation this morning in Auditorium.
Players:
Keerthi: science
  
  16   Thu Jun 11 12:10:22 2009 Damien GallopRoutineGeneralSupernanogan statusPumping went well overnight. TP3 turned
on around noon. Issues with Kepco communications.
  
  15   Wed Jun 10 18:48:53 2009 Damien GallopRoutineGeneralKrypton source gas fittedKrypton source gas teed directly into ion
source. A Nupro valve and tee also added
for 17O line. At present, the 17O gas bottle
  
  14   Wed Jun 10 17:49:40 2009 Damien GallopRoutineGeneralBeam to RFQWe handed over the beam to Sophia for testing
Rick's new tune. Although there are RF issues
at the RFQ presently, her feedback to the
  
ELOG V2.9.2-2455