OLIS Logbook General
  General, Page 24 of 26  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  182   Sat Nov 7 12:21:35 2009 Keerthi Jayamanna  17O hand valve status17O+3 at FC6 became 550nA.
17O hand valve found to be closed.
Probable cause may be the cold weather.
  
  188   Wed Nov 18 23:46:14 2009 Keerthi Jayamanna  OLIS development startedAll turbos in the OLIS and MCIS are off.
No controls for the MCIS. Pumps switched
of by pulling the CG cable.
  
  193   Thu Nov 26 06:20:21 2009 Keerthi Jayamanna  Supernanogan DevelopmentSwiched off all the pumps and ion gauge
for oven installation.
 
  
  194   Thu Nov 26 06:22:58 2009 Keerthi Jayamanna  Cusp sourceArc power supply does not hold any voltage.   
  263   Fri May 7 12:29:41 2010 Keerthi Jayamanna  Supernanogan developmentSupernanogan development for 33S started.
All MW and MW and MCIS power sypplies are
off.
  
  264   Fri May 7 19:10:05 2010 Keerthi JayamannaRoutineGeneralOLIS statusMW source is back and running.
A new vacuum
chamber is added to the Supernanogan RF block.
SO2
is not filled in yet.
  
  275   Mon May 24 22:42:51 2010 Keerthi Jayamanna  33S developmentTried to see the background before 33S
installation. Found few problems: MCIS:YCB1
 Picture_1.png 
  276   Tue May 25 00:19:18 2010 Keerthi Jayamanna  33S 
Finally
got something going. YCB1 short to the ground.
  
  277   Tue May 25 11:28:00 2010 Keerthi Jayamanna  33D devafter 24 hours background spectrum saved
as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power=
  
  278   Tue May 25 11:58:02 2010 Keerthi Jayamanna  33S devafter 24 hours background spectrum saved
as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power=
  
  279   Tue May 25 22:02:41 2010 Keerthi Jayamanna  33S spectrum33S spectrum is saved as 33S_spectrum.dat    
  383   Fri Feb 18 11:05:50 2011 Keerthi Jayamanna  OLIS ProblemsPE set point is ok but read back is half of
the real value.
  
  384   Fri Feb 18 11:43:32 2011 Keerthi Jayamanna  IOS: EE StatusIOS:EE found damaged. It has been replaced
with IOS:SSEE-Michael B.
  
  385   Tue Feb 22 18:52:53 2011 Keerthi Jayamanna  Ti+7 efficiency studies2mm diameter Ti was installed to set the
optics. Later 0.0005 in thick foil will be
installed for real efficiency studies.
  
  386   Tue Feb 22 18:54:43 2011 Keerthi Jayamanna  EE and SSEEBoth EE and SSEE problems were solved.
They are working OK now.
  
  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnetKlixon at the OLIS bemding magnet is not
funtioning properly.
  
  389   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall peice of titanium wire is installed
and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
  
  388   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall piece of titanium foil 0.0005"
thick is installed and running around 100pA
of Ti+7 at FC6.
  
  390   Sat Feb 26 22:06:03 2011 Keerthi Jayamanna  Ti+7 status90pA of Ti+7 is running smoothly. 22:05 
Feb26th
  
  391   Wed Mar 9 11:09:02 2011 Keerthi Jayamanna  IOS:SSW failedIOS:SSW failed unexpectedly. No reason
found. Came back on easily.
  
ELOG V2.9.2-2455