OLIS Logbook General
  General, Page 22 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  184   Tue Nov 10 09:36:39 2009 Damien Gallop  17O3+ beam to DRAGON continuingBeam ran well overnight. Last evening Vacuum
Group diagnosed and repaired a catastrophic
leak in the ILT cross region. You can see
 Picture_1.png 
  185   Fri Nov 13 10:26:07 2009 Damien Gallop  17O3+ beam to DRAGON continuingBeam and energy changes continued over
the weekend. The ICR reports that things
are going swimmingly, and that the users
 Picture_1.pngPicture_2.png 
  183   Mon Nov 9 09:30:10 2009 Damien Gallop  17O3+ beam to DRAGONBeam delivery continued through the weekend.
As noted on Saturday, current dropped precipitously
due to source gas pressure. We have 2.3e-6eµA
  
  18   Fri Jun 12 14:24:49 2009 Damien GallopRoutineGeneral17O3+ beam at optimized RFA comment about RF power came up at the
presentation this morning. Intense X-rays
can be produced not only at the peak efficiency
 grab.Q22311.pnggrab.Z22325.pnggrab.F22387.png 
  143   Wed Sep 16 12:48:13 2009 Keerthi  17O+5 double peaks090916_1242ILTEMIT.txt  17O+5 has
two peaks.
090916_1355ILTEMIT.txt  Repeat
 grab.U24653.pnggrab.s24670.pnggrab.s24675.pnggrab.d24681.pnggrab.u24686.png 
  141   Wed Sep 16 12:20:10 2009 Keerthi  17O+3 emittance with increased EL090916_1215ILTEMIT.txt   
EL increased, ~4.5uA, emittance increases,
50x100   17O+3
  
  142   Wed Sep 16 12:26:51 2009 KeerthiRoutineGeneral17O+3 emittance with changed steering090916_1222ILTEMIT.txt  Changed the
MCIS steering to center the beam in the EL.
17O+3 ~5uA, 50x100
  
  140   Wed Sep 16 12:12:04 2009 KeerthiRoutineGeneral17O+3 emittance sacns090916_1156ILTEMIT.txt     
17O+3  good settings 50x100 ,  
333nA Scale, ~4uA
  
  182   Sat Nov 7 12:21:35 2009 Keerthi Jayamanna  17O hand valve status17O+3 at FC6 became 550nA.
17O hand valve found to be closed.
Probable cause may be the cold weather.
  
  149   Fri Oct 2 15:58:36 2009 Keerthi  17O and Ne gases are now connectedA  1e-5 atm.cc/sec of 17O leak and
a 1e-6 atm.cc/sec of neon leak are connected
to the source through center tube of the
  
  25   Fri Jun 19 11:59:49 2009 Damien GallopRoutineGeneral16On+ emittance scans continueKeerthi developed a nice 16O7+ beam to
FC6 last night. Beam current is about 3nA
presently. Here is the first emittance scan
 18x 
  23   Wed Jun 17 17:01:07 2009 Damien GallopRoutineGeneral16On+ emittance scansA series of 16On+ emittance scans. Benchmark
scan of 16O5+ matched well with same scan
done this morning. Subsequent scans beginning
  
  82   Thu Jul 16 14:41:46 2009 Damien Gallop  16O8+ surveyA/q = 2 Field = 662.3G FC6 = 150epA (unstable)
No emittance scan possible.
  
  104   Fri Jul 17 10:32:42 2009 Damien Gallop  16O8+ recheckA/q = 2 Field = 667.3 FC6 = ~10enA  grab.X25481.png 
  84   Thu Jul 16 14:46:52 2009 Damien Gallop  16O7+ surveyA/q = 2.2857 Field = 708.0G FC6 = 70epA
(noisy)
No emittance scan possible.
  
  103   Fri Jul 17 10:30:27 2009 Damien Gallop  16O7+ recheckA/q = 2.2857 Field = 710.5G FC6 = 100pA   
  86   Thu Jul 16 15:11:16 2009 Damien Gallop  16O6+ surveyA/q = 2.6667 Field = 764.7G FC6 = 3.0nA  grab.e16164.pnggrab.z16169.pnggrab.a16173.png 
  105   Fri Jul 17 10:46:06 2009 Damien Gallop  16O6+ recheckA/q = 2.666 Field = 767.1G FC6 = 3enA  grab.C25591.pnggrab.q25595.pnggrab.Q25796.pnggrab.w25831.pnggrab.c25693.png 
  88   Thu Jul 16 15:38:58 2009 Damien Gallop  16O5+ surveyA/q = 3.2 Field = 837.7G FC6 = 14.5enA  grab.a16526.pnggrab.l16532.pnggrab.N16536.png 
  22   Wed Jun 17 10:14:57 2009 Damien GallopRoutineGeneral16O5+ on FC6 overnightThe 16O5+ beam stayed up OK overnight.
ICR took some emittance
scans this morning. They look interesting.
 6x 
ELOG V2.9.2-2455