ID |
Date |
Author |
Type |
Category |
Subject |
370
|
Mon Nov 29 08:55:35 2010 |
Damien Gallop | | | 12C2+ for Commissioning |
Supernanogan is online. MCIS:TP3 is off. It should be on. It is required for best production of higher charge states. |
371
|
Tue Nov 30 08:47:47 2010 |
Damien Gallop | | | 12C2+ for Commissioning |
Commissioning and development continue. |
372
|
Wed Dec 1 08:51:54 2010 |
Damien Gallop | | | 12C2+ for Commissioning |
Continuing from Supernanogan. Source touch-up last evening. |
373
|
Thu Dec 2 10:02:46 2010 |
Damien Gallop | | | 12C2+ for Commissioning |
Accelerator development continues. Save: 101201_2157.snaiosvault. Today's agenda: emittance scans. Attached: overnight beam plus a preliminary horizontal emittance scan 101202_0951ILTEMIT.txt.
Later... First good scan 101202_1016ILTEMIT.txt.
Next... Second scan 101202_1016ILTEMIT.txt with FC at lower gain, due to lots of red in the first scan. Too noisy.
Next... Third scan 101202_1041ILTEMIT.txt, first the raw pic, then filtered a couple of ways.
Scanner parked, and beam on FC6 again. There is interest in doing a vertical scan. This will require physically moving the emittance rig to the perpendicular face of its diagnostics box. Awaiting decision. |
374
|
Fri Dec 3 09:37:14 2010 |
Damien Gallop | | | 12C2+ for Commissioning |
Last moments of beam development for SEBT commissioning. Attached is an FC6 plot and the present optics and 1mm slits. Decision was to not do a vertical emittance scan at this time, but proceed with 15Kr development, up next. Before we shut off, one last emittance scan coming up.
Later... Emittance scan with 2.5mm slits (default position setting used) in progress... Done. 101203_1017ILTEMIT.txt. Looks a little boxy... Both raw and cleaned-up versions attached.
Next: Emittance scan with 5mm slits... Done. 101203_1039ILTEMIT.txt. Looks a little more boxy... Both raw and cleaned-up versions attached.
Next: Repeat scan with original 1mm slits and scanner settings... Done. 101203_1104ILTEMIT.txt. It reproduced. Both raw and cleaned-up versions plus scanner panel attached.
Next: Quick look at 16O beams before shutting off... |
375
|
Mon Dec 6 09:08:52 2010 |
Damien Gallop | | | 80Kr14+/40Ar7+ for SEBT Development |
The previous 12C2+ development run from the Supernanogan ended Friday morning. Starting Friday afternoon, the Supernanogan was prepared for an upcoming SEBT development using krypton beams. The source was ready overnight. There were some teething pains over the weekend. An A/q=5.71 beam is sitting on FC6 presently. The beam schedule shows an experiment change on Thursday morning.
Later... Some notes about krypton.
Naturally occurring isotopes:
Kr-78 ( 0.35% , 2.0E+21 ) Kr-80 ( 2.25% ) Kr-82 ( 11.6% ) Kr-83 ( 11.5% ) Kr-84 ( 57.0% ) Kr-86 ( 17.3% )
Some A/q values:
- 40/7 = 5.7143
- 80/14 = 5.7143
- 82/14 = 5.8571
- 82/15 = 5.4667
- 83/15 = 5.5333
- 84/15 = 5.6
- 86/15 = 5.7333
Keerthi's mass scans from Saturday:
- Background scan
- Krypton scan (note multi-peaks in A/q = 5.7 to 5.75 range)
- FC6 at A/q=7.3333
|
376
|
Tue Dec 7 08:57:26 2010 |
Damien Gallop | | | 80Kr14+/40Ar7+ for SEBT Development |
Development should continue today. Looks like Supernanogan went through a plasma mode change overnight and settled into a new mode. |
377
|
Tue Dec 14 09:15:58 2010 |
Damien Gallop | | | MCIS Development |
Beam development started yesterday. Looks like the HERACLES run, which started Thursday, ended yesterday morning. |
378
|
Wed Dec 15 09:18:41 2010 |
Damien Gallop | | | MCIS Development |
Source development in preparation for Au beam in progress. |
379
|
Fri Dec 17 09:18:57 2010 |
Damien Gallop | | | MCIS Development |
Development continues in the search for gold. A=197 Present A/q=5.94, which suggests 197Au+33. It could also be a tail of 12C+2. We'll see. |
380
|
Mon Dec 20 09:50:07 2010 |
Damien Gallop | | | MCIS Development & EOB |
Development and the quest for gold continue.
Later... Mass scans in region of 197Au33 A/q=5.97, with graph of all theoretically possible charge states in the same A/q region. The thing to note in that last graph is how clean is the region (just left of A/q=6) where 197Au33 is predicted.
Later... Panning for gold ended prematurely due to a decision to end. The reason cited was DSB:MB14. |
381
|
Tue Dec 21 09:43:22 2010 |
Damien Gallop | | | In Memoriam... Mike McDonald |
At 5:00 this morning, after a lengthy battle with cancer, Mike passed from this life to his eternal reward. He has left us a great legacy. May he rest in peace. |
382
|
Fri Dec 24 13:06:07 2010 |
Damien Gallop | | | Merry Christmas and Happy New Year |
Our very best to all of you. |
383
|
Fri Feb 18 11:05:50 2011 |
Keerthi Jayamanna | | | OLIS Problems |
PE set point is ok but read back is half of the real value. |
384
|
Fri Feb 18 11:43:32 2011 |
Keerthi Jayamanna | | | IOS: EE Status |
IOS:EE found damaged. It has been replaced with IOS:SSEE-Michael B. |
385
|
Tue Feb 22 18:52:53 2011 |
Keerthi Jayamanna | | | Ti+7 efficiency studies |
2mm diameter Ti was installed to set the optics. Later 0.0005 in thick foil will be installed for real efficiency studies. |
386
|
Tue Feb 22 18:54:43 2011 |
Keerthi Jayamanna | | | EE and SSEE |
Both EE and SSEE problems were solved. They are working OK now. |
387
|
Wed Feb 23 22:29:48 2011 |
Keerthi Jayamanna | | | OLIS mahnet |
Klixon at the OLIS bemding magnet is not funtioning properly. |
389
|
Fri Feb 25 17:27:11 2011 |
Keerthi Jayamanna | | | Titaniums efficiency test |
Small peice of titanium wire is installed and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data. |
388
|
Fri Feb 25 17:27:11 2011 |
Keerthi Jayamanna | | | Titaniums efficiency test |
Small piece of titanium foil 0.0005" thick is installed and running around 100pA of Ti+7 at FC6.
OSAC are OPs taking data. |