Thu Nov 26 06:20:21 2009
Keerthi Jayamanna
Supernanogan Development
Swiched off all the pumps and ion gauge
for oven installation.
192
Tue Nov 24 13:55:55 2009
Damien Gallop
OLIS development for CUSP source - installation cont'd
Keerthi found and fixed a couple more vacuum
leaks last night. Present vacuum at IOS:IG1
= 4.4e-7 Torr. Electrical and water services
191
Mon Nov 23 10:32:34 2009
Damien Gallop
OLIS development for CUSP source - installation cont'd
4He2+ "alpha" CUSP source under
vacuum: IOS:IG1=7.3e-7 Torr. Electrical installations
today.
190
Fri Nov 20 17:26:57 2009
Damien Gallop
OLIS development for CUSP source - installation
Today we installed the CUSP "alpha"
source on the MWS port at OLIS. It is vacuum-tight.
Looking good. Also we installed remaining
189
Thu Nov 19 11:14:19 2009
Damien Gallop
OLIS development for CUSP source
Pumps were switched off last night. IOS
was vented to Ar and swiped clean this morning.
MCIS ready for disembarking from F-cage.
188
Wed Nov 18 23:46:14 2009
Keerthi Jayamanna
OLIS development started
All turbos in the OLIS and MCIS are off.
No controls for the MCIS. Pumps switched
of by pulling the CG cable.
187
Tue Nov 17 09:18:37 2009
Damien Gallop
21Ne4+ to DRAGON for charge distribution studies
After their EOB with 17O3+ yesterday, DRAGON
switched to 21Ne4+ running for charge distribution
studies. Keerthi changed over the source
186
Mon Nov 16 10:00:41 2009
Damien Gallop
17O3+ beam to DRAGON end of run this morning
DRAGON declared EOB at around 08:00 today.
Source and beam were switched to 21Ne4+ for
calibration studies.
185
Fri Nov 13 10:26:07 2009
Damien Gallop
17O3+ beam to DRAGON continuing
Beam and energy changes continued over
the weekend. The ICR reports that things
are going swimmingly, and that the users
184
Tue Nov 10 09:36:39 2009
Damien Gallop
17O3+ beam to DRAGON continuing
Beam ran well overnight. Last evening Vacuum
Group diagnosed and repaired a catastrophic
leak in the ILT cross region. You can see
183
Mon Nov 9 09:30:10 2009
Damien Gallop
17O3+ beam to DRAGON
Beam delivery continued through the weekend.
As noted on Saturday, current dropped precipitously
due to source gas pressure. We have 2.3e-6eµA
182
Sat Nov 7 12:21:35 2009
Keerthi Jayamanna
17O hand valve status
17O+3 at FC6 became 550nA.
17O hand valve found to be closed.
Probable cause may be the cold weather.
181
Fri Nov 6 11:17:54 2009
Damien Gallop
17O3+ setup to DRAGON
As noted, we handed over the beam to our
users yesterday by noon. Setup to DRAGON
is continuing. The report this morning that
180
Thu Nov 5 09:45:03 2009
Damien Gallop
MCIS online with 17O3+ on FC6 overnight
Beam was quiet overnight. Keerthi touched
up the tune this morning, and it is quieter
yet and a little more of it too.
179
Wed Nov 4 09:46:07 2009
Damien Gallop
MCIS online with 17O3+ on FC6 for development
Beam stayed up overnight nicely. Development
today. RF scans in progress now.
Later... scanning done for the moment.
9x
178
Tue Nov 3 09:25:31 2009
Damien Gallop
MCIS online with 17O3+ on FC6 overnight
We completed 33S operation last night,
and roughed in a setup for 17O. We had 17O3+
on FC6 overnight; chart attached. It grew
177
Mon Nov 2 17:42:54 2009
Damien Gallop
MCIS online with 17O3+ on FC6
As noted earlier, we have opened the OLIS
cage and set up the source gases for 17O
operation. It will take a while for the SO2
176
Mon Nov 2 09:32:40 2009
Damien Gallop
MCIS on with 33S5+ on FC6 over the weekend
Beam came up nicely on Friday, and
stayed up quuietly over the weekend. Note
the absence of periodic spikes in the separator
175
Fri Oct 30 09:44:49 2009
Damien Gallop
MCIS on with 33S5+ on FC6 overnight
Controls finished with IOSIOC work yesterday.
ICR had restored most optics. I restarted
the source last evening. As you can see below,
174
Thu Oct 29 09:42:23 2009
Damien Gallop
IOSIOC work in progress
Yesterday there was an IOSIOC reboot for
a purpose. It was an opportunity to demonstrate
to Controls that IOSIOC reboots materially
Goto page
Previous
1
,
2
,
3
...
16
, 17,
18
...
24
,
25
,
26
Next
ELOG V2.9.2-2455