OLIS Logbook General
  General, Page 17 of 26  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subject Text Attachments
  193   Thu Nov 26 06:20:21 2009 Keerthi Jayamanna  Supernanogan DevelopmentSwiched off all the pumps and ion gauge
for oven installation.
 
  
  192   Tue Nov 24 13:55:55 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dKeerthi found and fixed a couple more vacuum
leaks last night. Present vacuum at IOS:IG1
= 4.4e-7 Torr. Electrical and water services
  
  191   Mon Nov 23 10:32:34 2009 Damien Gallop  OLIS development for CUSP source - installation cont'd4He2+ "alpha" CUSP source under
vacuum: IOS:IG1=7.3e-7 Torr. Electrical installations
today.
  
  190   Fri Nov 20 17:26:57 2009 Damien Gallop  OLIS development for CUSP source - installationToday we installed the CUSP "alpha"
source on the MWS port at OLIS. It is vacuum-tight.
Looking good. Also we installed remaining
  
  189   Thu Nov 19 11:14:19 2009 Damien Gallop  OLIS development for CUSP sourcePumps were switched off last night. IOS
was vented to Ar and swiped clean this morning.
MCIS ready for disembarking from F-cage.
  
  188   Wed Nov 18 23:46:14 2009 Keerthi Jayamanna  OLIS development startedAll turbos in the OLIS and MCIS are off.
No controls for the MCIS. Pumps switched
of by pulling the CG cable.
  
  187   Tue Nov 17 09:18:37 2009 Damien Gallop  21Ne4+ to DRAGON for charge distribution studiesAfter their EOB with 17O3+ yesterday, DRAGON
switched to 21Ne4+ running for charge distribution
studies. Keerthi changed over the source
 Picture_2.pngPicture_1.pngPicture_2.pngPicture_5.png 
  186   Mon Nov 16 10:00:41 2009 Damien Gallop  17O3+ beam to DRAGON end of run this morningDRAGON declared EOB at around 08:00 today.
Source and beam were switched to 21Ne4+ for
calibration studies.
 Picture_1.png 
  185   Fri Nov 13 10:26:07 2009 Damien Gallop  17O3+ beam to DRAGON continuingBeam and energy changes continued over
the weekend. The ICR reports that things
are going swimmingly, and that the users
 Picture_1.pngPicture_2.png 
  184   Tue Nov 10 09:36:39 2009 Damien Gallop  17O3+ beam to DRAGON continuingBeam ran well overnight. Last evening Vacuum
Group diagnosed and repaired a catastrophic
leak in the ILT cross region. You can see
 Picture_1.png 
  183   Mon Nov 9 09:30:10 2009 Damien Gallop  17O3+ beam to DRAGONBeam delivery continued through the weekend.
As noted on Saturday, current dropped precipitously
due to source gas pressure. We have 2.3e-6eµA
  
  182   Sat Nov 7 12:21:35 2009 Keerthi Jayamanna  17O hand valve status17O+3 at FC6 became 550nA.
17O hand valve found to be closed.
Probable cause may be the cold weather.
  
  181   Fri Nov 6 11:17:54 2009 Damien Gallop  17O3+ setup to DRAGONAs noted, we handed over the beam to our
users yesterday by noon. Setup to DRAGON
is continuing. The report this morning that
 Picture_9.png 
  180   Thu Nov 5 09:45:03 2009 Damien Gallop  MCIS online with 17O3+ on FC6 overnightBeam was quiet overnight. Keerthi touched
up the tune this morning, and it is quieter
yet and a little more of it too.
 Picture_7.png 
  179   Wed Nov 4 09:46:07 2009 Damien Gallop  MCIS online with 17O3+ on FC6 for developmentBeam stayed up overnight nicely. Development
today. RF scans in progress now.
Later... scanning done for the moment.
 9x 
  178   Tue Nov 3 09:25:31 2009 Damien Gallop  MCIS online with 17O3+ on FC6 overnightWe completed 33S operation last night,
and roughed in a setup for 17O. We had 17O3+
on FC6 overnight; chart attached. It grew
 Picture_1.png 
  177   Mon Nov 2 17:42:54 2009 Damien Gallop  MCIS online with 17O3+ on FC6As noted earlier, we have opened the OLIS
cage and set up the source gases for 17O
operation. It will take a while for the SO2
  
  176   Mon Nov 2 09:32:40 2009 Damien Gallop  MCIS on with 33S5+ on FC6 over the weekendBeam came up nicely on  Friday, and
stayed up quuietly over the weekend. Note
the absence of periodic spikes in the separator
 Picture_1.pngPicture_2.pngPicture_3.pngPicture_4.png 
  175   Fri Oct 30 09:44:49 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnightControls finished with IOSIOC work yesterday.
ICR had restored most optics. I restarted
the source last evening. As you can see below,
 Picture_2.pngPicture_1.pngPicture_2.pngPicture_3.png 
  174   Thu Oct 29 09:42:23 2009 Damien Gallop  IOSIOC work in progressYesterday there was an IOSIOC reboot for
a purpose. It was an opportunity to demonstrate
to Controls that IOSIOC reboots materially
  
ELOG V2.9.2-2455