OLIS Logbook General
  General, Page 16 of 26  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categorydown Subject Text Attachments
  270   Fri May 14 08:50:56 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1MWS continues to provide 22Ne2+ for pilot
beam use. Beam quietly sitting on FC6. Stripchart
attached. Also, Supernanogan plasma is on
 Picture_5.png 
  271   Mon May 17 09:09:50 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Last day of this pilot beam to TUDA-II.
Expect a beam switch tomorrow for sake of
TIGRESS.
 Picture_6.png 
  272   Tue May 18 09:03:32 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1 EOBEOB for SEBT1 run at 08:30, taking 11Li
from ITE and 22Ne2+ from OLIS when needed.
Attempted emittance scans last evening, but
 Picture_6.pngPicture_7.pngPicture_8.png 
  273   Tue May 18 09:15:16 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESS setupPrepare to switch beam from 22Ne2+ to 20Ne1+.
Skimmers from 22Ne2+ run shown below. Table
of tune options below. We will be using the
 8x 
  274   Wed May 19 09:55:51 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESSISAC-I tuning done yesterday. TBC today
into ISAC-II. Beam very nice overnight.
 Picture_6.png 
  275   Mon May 24 22:42:51 2010 Keerthi Jayamanna  33S developmentTried to see the background before 33S
installation. Found few problems: MCIS:YCB1
 Picture_1.png 
  276   Tue May 25 00:19:18 2010 Keerthi Jayamanna  33S 
Finally
got something going. YCB1 short to the ground.
  
  277   Tue May 25 11:28:00 2010 Keerthi Jayamanna  33D devafter 24 hours background spectrum saved
as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power=
  
  278   Tue May 25 11:58:02 2010 Keerthi Jayamanna  33S devafter 24 hours background spectrum saved
as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power=
  
  279   Tue May 25 22:02:41 2010 Keerthi Jayamanna  33S spectrum33S spectrum is saved as 33S_spectrum.dat    
  280   Wed May 26 18:16:10 2010 Damien Gallop  33S DevelopmentSome 3enA of beam on FC6 presently. Let
it sit.
 grab.Cm6004.png 
  281   Thu May 27 09:11:10 2010 Damien Gallop  33S Development and Handover33S on FC6 overnight. Preparing to send
beam to DRAGON
now, and confirm isotope.
 Picture_2.png 
  282   Fri May 28 11:02:59 2010 Damien Gallop  33S to DRAGONBeam tuning in progress. Source gas canister
at -20"Hg. MCIS pressure at 7.62e-8
Torr.
 Picture_1.png 
  283   Mon May 31 09:18:39 2010 Damien Gallop  33S to DRAGONDelivery of 33S6+ to DRAGON continues.
A couple of RF tweaks done over the weekend.
Source gas canister pressure at -20"Hg.
 Picture_2.png 
  284   Tue Jun 1 09:12:39 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues. Looks
like there was an RF tweak overnight. Source
gas canister still at ~-20"Hg. MCIS
 Picture_2.png 
  285   Wed Jun 2 09:19:04 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues. It
is Maintenance Day for everybody else today.
Source gas canister pressure = -20"Hg.
  
  286   Thu Jun 3 09:29:11 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues until
Saturday morning. All the signs are that
beam is excellent. Source gas canister is
 Picture_1.png 
  287   Fri Jun 4 09:30:48 2010 Damien Gallop  33S to DRAGONDelivery of 33S6+ continues to DRAGON for
the final day. Some online tuning of the
line overnight. Source gas canister pressure
 Picture_2.png 
  288   Mon Jun 7 10:36:14 2010 Damien Gallop  15N setup over the weekendKeerthi set up the Supernanogan for 15N
operation and destined for TIGRESS, using
two source gas options: a miniature bottle
 Picture_2.png 
  289   Tue Jun 8 09:27:54 2010 Damien Gallop  15N4+ to TIGRESSUser tuning began Sunday night. Beam physics
expert chose to retire the IOS:Q1 defeat,
as he did not know until yesterday that it
 Picture_4.pngPicture_5.png 
ELOG V2.9.2-2455