|
ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
|
253
|
Mon Apr 26 10:58:46 2010 |
Damien Gallop | | | 16O1+ at 32.64keV to SEBT2 | Our first experiment of the year started
right around midnight last night, after extensive
tuning. As I understand it, S1151 |
|
|
252
|
Fri Apr 23 10:18:32 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Marco and experimenters are busy at it,
tuning the DTL. Regarding the source, he
is "happy as always!" Well, that |
|
|
251
|
Thu Apr 22 14:57:25 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Accelerator development continued this
morning. Beam from source was reported to
be "good". ICR showed me their |
|
|
250
|
Wed Apr 21 15:30:09 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam up as of last evening. Controls performed
some network upgrades today, which impacted
beam operations. One glitch on our side: |
|
|
249
|
Tue Apr 20 09:02:18 2010 |
Damien Gallop | | | OLIS Maintenance | Maintenance Day for OLIS started late yesterday
afternoon. Source up at end of the day. See
attached Stripchart and in particular how |
|
|
248
|
Mon Apr 19 17:12:55 2010 |
Damien Gallop | | | OLIS Maintenance | Just in: an active work permit for OLIS
maintenance. Underway through tomorrow (Tuesday)
evening. |
|
|
247
|
Mon Apr 19 10:11:17 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Development on Friday; idle over the weekend.
Stripchart attached.
Meanwhile, there was a power bump |
|
|
246
|
Fri Apr 16 09:26:01 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam development through accelerators continues
today. Beam was rock-stable overnight. |
|
|
245
|
Thu Apr 15 09:39:11 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Yesterday's RF troubles in ISAC-I are reportedly
solved. Beam development is expected to resume
this morning. |
|
|
244
|
Wed Apr 14 17:28:32 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam reserved for continuing accelerator
development, but there are some ISAC-I RF
phase troubles. However, maintenance was |
|
|
243
|
Tue Apr 13 10:20:27 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Accelerator commissioning has resumed for
the day. Beam was nice and stable overnight.
See attached Stripchart. |
|
|
242
|
Mon Apr 12 11:53:22 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam was used last week for DRAGON commissioning.
Successful run, completed yesterday, as reported
by Colin this morning. |
|
|
241
|
Thu Apr 1 09:23:08 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam idle overnight. Another night of super-stable
beam. If no users today, then we may take
it for MRO. |
|
|
240
|
Wed Mar 31 09:43:30 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam set up for accelerator commissioning.
Sophia took beam yesterday. Beam idle overnight.
Stripchart of overnight performance attached. |
|
|
239
|
Tue Mar 30 10:27:09 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | 16O1+ beam requested yesterday. Source
switched over and beam ready by evening.
Nice overnight Stripchart, attached. Sophia |
|
|
238
|
Mon Mar 29 12:15:00 2010 |
Damien Gallop | | | 20Ne1+ at 40.8keV for accelerator commissioning | OLIS sprung a water leak last night. Problem
was sparking through a coiled cooling
line. I replaced the pair of cooling lines |
|
|
237
|
Fri Mar 26 09:31:04 2010 |
Damien Gallop | | | 20Ne1+ at 40.8keV for accelerator commissioning | Beam idling overnight. Yesterday ICR called
me regarding an IOSIOC reboot and consequent
fallout. In short, it turned off IOS:MB. |
|
|
236
|
Thu Mar 25 12:43:16 2010 |
Damien Gallop | | | 20Ne1+ at 40.8keV for accelerator commissioning | Beam stable as a rock overnight. Pity we
have no-one using it at the moment! Stripchart
attached. |
|
|
235
|
Wed Mar 24 11:42:32 2010 |
Damien Gallop | | | 20Ne1+ at 40.8keV for accelerator commissioning | Beam is on standby. Target
snapshot in IOPS elog. Over the
last little while... |
|
|
234
|
Fri Mar 19 09:00:21 2010 |
Damien Gallop | | | 20Ne1+ at 40.8keV for accelerator commissioning | MWS is running well. Tune save: 100319_0901.snapiosdragon
with beam observed to Prague magnet. Stripchart
of last 24h attached. |
|