OLIS Logbook
General
General, Page 14 of 26
Not logged in
List
|
Find
|
Select
|
Import
|
Login
|
Help
Full
| Summary |
Threaded
513 Entries
Goto page
Previous
1
,
2
,
3
...
13
, 14,
15
...
24
,
25
,
26
Next
ID
Date
Author
Type
Category
Subject
Text
229
Fri Feb 19 17:54:40 2010
Damien Gallop
OLIS Shutdown in progress
Partial disassembly of DB1 optics today.
Shielding of insulators is definitely working
and indicated for unshielded insulators.
230
Thu Mar 11 23:02:18 2010
Keerthi
OLIS status after shutdown
Microwave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
231
Fri Mar 12 11:33:09 2010
Keerthi
IOS:IG!
IOS:IG1 is faulty. Need to replac it during
next earliest window.
232
Fri Mar 12 11:35:34 2010
Keerthi
Cusp water cooling
Cusp source water cooling (#4) interlick
does not work.
233
Wed Mar 17 09:25:27 2010
Damien Gallop
20Ne1+ at 40.8keV for accelerator commissioning
20Ne1+ set up from the MWS and handed over
to Sophia & Marco for accelerator recommissioning.
Strip to 5+ at M:5. First day of beam. Happy
234
Fri Mar 19 09:00:21 2010
Damien Gallop
20Ne1+ at 40.8keV for accelerator commissioning
MWS is running well. Tune save: 100319_0901.snapiosdragon
with beam observed to Prague magnet. Stripchart
of last 24h attached.
235
Wed Mar 24 11:42:32 2010
Damien Gallop
20Ne1+ at 40.8keV for accelerator commissioning
Beam is on standby. Target
snapshot in IOPS elog. Over the
last little while...
236
Thu Mar 25 12:43:16 2010
Damien Gallop
20Ne1+ at 40.8keV for accelerator commissioning
Beam stable as a rock overnight. Pity we
have no-one using it at the moment! Stripchart
attached.
237
Fri Mar 26 09:31:04 2010
Damien Gallop
20Ne1+ at 40.8keV for accelerator commissioning
Beam idling overnight. Yesterday ICR called
me regarding an IOSIOC reboot and consequent
fallout. In short, it turned off IOS:MB.
238
Mon Mar 29 12:15:00 2010
Damien Gallop
20Ne1+ at 40.8keV for accelerator commissioning
OLIS sprung a water leak last night. Problem
was sparking through a coiled cooling
line. I replaced the pair of cooling lines
239
Tue Mar 30 10:27:09 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
16O1+ beam requested yesterday. Source
switched over and beam ready by evening.
Nice overnight Stripchart, attached. Sophia
240
Wed Mar 31 09:43:30 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Beam set up for accelerator commissioning.
Sophia took beam yesterday. Beam idle overnight.
Stripchart of overnight performance attached.
241
Thu Apr 1 09:23:08 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Beam idle overnight. Another night of super-stable
beam. If no users today, then we may take
it for MRO.
242
Mon Apr 12 11:53:22 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Beam was used last week for DRAGON commissioning.
Successful run, completed yesterday, as reported
by Colin this morning.
243
Tue Apr 13 10:20:27 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Accelerator commissioning has resumed for
the day. Beam was nice and stable overnight.
See attached Stripchart.
244
Wed Apr 14 17:28:32 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Beam reserved for continuing accelerator
development, but there are some ISAC-I RF
phase troubles. However, maintenance was
245
Thu Apr 15 09:39:11 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Yesterday's RF troubles in ISAC-I are reportedly
solved. Beam development is expected to resume
this morning.
246
Fri Apr 16 09:26:01 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Beam development through accelerators continues
today. Beam was rock-stable overnight.
247
Mon Apr 19 10:11:17 2010
Damien Gallop
16O1+ at 32.64keV for accelerator commissioning
Development on Friday; idle over the weekend.
Stripchart attached.
Meanwhile, there was a power bump
248
Mon Apr 19 17:12:55 2010
Damien Gallop
OLIS Maintenance
Just in: an active work permit for OLIS
maintenance. Underway through tomorrow (Tuesday)
evening.
Goto page
Previous
1
,
2
,
3
...
13
, 14,
15
...
24
,
25
,
26
Next
ELOG V2.9.2-2455