Mon Apr 26 10:58:46 2010, Damien Gallop, , , 16O1+ at 32.64keV to SEBT2
|
Our first experiment of the year started right around midnight last night, after extensive tuning. As I understand it, S1151
will confirm the age of the universe. The MWS source performed flawlessly over the weekend. |
Fri Apr 23 10:18:32 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Marco and experimenters are busy at it, tuning the DTL. Regarding the source, he is "happy as always!" Well, that makes at least two of us.
After this segment of tuning is complete, then he will move on to setup for the upcoming S1151 run at SEBT2 on Sunday. |
Thu Apr 22 14:57:25 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Accelerator development continued this morning. Beam from source was reported to be "good". ICR showed me their long-term Stripchart
of our beam. There is a clear daily correlation of beam intensity with weather. Interesting. Beam idle on FC6 since ~lunchtime. I took the opportunity
to do a little magstab development. The server now runs Konstantin's ser2net patch which fixes |
Wed Apr 21 15:30:09 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Beam up as of last evening. Controls performed some network upgrades today, which impacted beam operations. One glitch on our side: OLIS:MB drive bit
was lost. Fault report. Otherwise, all's
right with the world, and Sophia has resumed accelerator development. |
Tue Apr 20 09:02:18 2010, Damien Gallop, , , OLIS Maintenance
|
Maintenance Day for OLIS started late yesterday afternoon. Source up at end of the day. See attached Stripchart and in particular how the source (blue
trace is beam at FC6) came back to its nominal state within a reasonable time. Maintenance TBC after lunch.
Later... Hardware maintenance complete. Source HV and source gas tests followed by source startup around 16:30. Next up: magstab development. |
Mon Apr 19 17:12:55 2010, Damien Gallop, , , OLIS Maintenance
|
Just in: an active work permit for OLIS maintenance. Underway through tomorrow (Tuesday) evening.
Save: 100416_2339.snapiosvault
Later... done for today. Source is on for the night. |
Mon Apr 19 10:11:17 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Development on Friday; idle over the weekend. Stripchart attached.
Meanwhile, there was a power bump at around 09:30, and the source went out. Restarted OK. |
Fri Apr 16 09:26:01 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Beam development through accelerators continues today. Beam was rock-stable overnight. |
Thu Apr 15 09:39:11 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Yesterday's RF troubles in ISAC-I are reportedly solved. Beam development is expected to resume this morning. |
Wed Apr 14 17:28:32 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Beam reserved for continuing accelerator development, but there are some ISAC-I RF phase troubles. However, maintenance was not permitted today... until
just now. Too late for today. |
Tue Apr 13 10:20:27 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Accelerator commissioning has resumed for the day. Beam was nice and stable overnight. See attached Stripchart. |
Mon Apr 12 11:53:22 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Beam was used last week for DRAGON commissioning. Successful run, completed yesterday, as reported by Colin this morning.
Milestone: First coasting beam through
new SCC on Thursday, 8-Apr-2010 at ~20:00, using 16O(1+)4+ at 1.5MeV/u from MWS. |
Thu Apr 1 09:23:08 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Beam idle overnight. Another night of super-stable beam. If no users today, then we may take it for MRO.
Later... Check out magstab program while we have quiet time. Test outcomes when serial link is opened. Purpose: Improve fault tolerance. Done.
Sophia will take the beam shortly. |
Wed Mar 31 09:43:30 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Beam set up for accelerator commissioning. Sophia took beam yesterday. Beam idle overnight. Stripchart of overnight performance attached. |
Tue Mar 30 10:27:09 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
16O1+ beam requested yesterday. Source switched over and beam ready by evening. Nice overnight Stripchart, attached. Sophia has the beam now. |
Mon Mar 29 12:15:00 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
OLIS sprung a water leak last night. Problem was sparking through a coiled cooling line. I replaced the pair of cooling lines and rerouted them
somewhat. Source is up again now. |
Fri Mar 26 09:31:04 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Beam idling overnight. Yesterday ICR called me regarding an IOSIOC reboot and consequent fallout. In short, it turned off IOS:MB. Not good. While the
fix was easy enough, it took time to find it, which would translate to downtime during regular delivery. A lesson learned. I just noticed now that the
magnet stability program was out of range and obviously had been since the IOC reboot. I reset the power supply and field. This procedure will need to |
Thu Mar 25 12:43:16 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Beam stable as a rock overnight. Pity we have no-one using it at the moment! Stripchart attached. |
Wed Mar 24 11:42:32 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Beam is on standby. Target snapshot
in IOPS elog. Over the last little while...
* IOS:IG1 repaired last evening. IOS vented to Ar, flowing for duration of repair. Standard Varian filament repair kit used with Dimo's instructions. |
Fri Mar 19 09:00:21 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
MWS is running well. Tune save: 100319_0901.snapiosdragon with beam observed to Prague magnet. Stripchart of last 24h attached. |