OLIS Logbook General
  General, Page 13 of 26  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categorydown Subject Text Attachments
  209   Thu Dec 10 08:59:05 2009 Damien Gallop  OLIS development for CUSP source continued Source stayed up quietly overnight. Current
dropped off gradually. I will tweak things
shortly.
 Picture_12.pngPicture_13.png 
  210   Fri Dec 11 18:03:30 2009 Damien Gallop  OLIS development for CUSP source continued Today we swapped power supplies between
the arc and plasma electrode. This gives
us a higher voltage range on the arc, at
  
  211   Mon Dec 14 10:01:52 2009 Damien Gallop  OLIS development for CUSP source continuedDevelopment over the weekend. Results to
come. Restart source now and let it warm
up. 4He2+ on FC6. Plasma at zero, to duplicate
  
  212   Tue Dec 15 17:50:38 2009 Damien Gallop  OLIS development for CUSP source continued Four larger apertures were installed yesterday.
This morning we fired up the modified source.
It lit immediately. Plenty of beam. Development
  
  213   Wed Dec 16 14:07:37 2009 Damien Gallop  OLIS development for CUSP source continued Today we vary source gas pressure.
Later... Several iterations of pressure,
tuning and standing on our heads. Representative
 grab.n10208.pnggrab.o10214.pnggrab.G10224.pnggrab.T10230.png 
  214   Fri Dec 18 13:14:01 2009 Damien Gallop  OLIS development for CUSP source continued Yesterday: Busy! Source filment changed
last night. Source pumped overnight. First
start this morning.
 9x 
  215   Mon Dec 21 10:22:33 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dKeerthi and Marco achieved visible 4He2+
through the RFQ on Friday (or so). Mass spec
attached. Development continues today.
 grab.I28800.pngPicture_8.png 
  216   Wed Dec 23 11:09:37 2009 Damien Gallop  OLIS developmentSo... lots has happened.
* Supernanogan *
Heater components installed in plasma
 7x 
  217   Thu Dec 24 10:13:00 2009 Damien Gallop  OLIS development 20Ne1+ from MWSThe MWS stayed up flawlessly overnight.
Beam grew from about 2µA to over 5µA
this morning. Was it the pre-conditioning
 Picture_5.png 
  218   Mon Jan 11 17:40:07 2010 Damien Gallop  Happy New Year!Welcome to 2010. Shutdown is underway across
the site, while beam development is going
on at OLIS.
  
  219   Mon Jan 11 17:46:31 2010 Damien Gallop  OLIS development for 4He2+ beam loose endsOLIS was shut down over Christmas. We did
a "soft start" of the MWS last
Tuesday, after refurbishing and installation
 grab.r14041.pnggrab.Q14048.pnggrab.h14058.png 
  220   Wed Jan 13 18:16:22 2010 Damien Gallop  OLIS development with MWS at 28keVWe will be delivering a 28keV beam to the
tuning boys tomorrow for further diagnosis
of the 8pi line. In anticipation, I restarted
 6x 
  221   Thu Jan 14 09:57:05 2010 Damien Gallop  20Ne1+ beam from MWS for 8pi diagnosisBeam is on for 8pi diagnosis by special
request.
We set up beam in IOS yesterday.
 9x 
  222   Fri Jan 15 15:30:02 2010 keerthi  Supernanogan oven start upVoltage             
Current          
  MCIC:IG1
  
  223   Tue Feb 2 10:06:41 2010 Damien Gallop  Supernanogan development wind-upWe ran 32S5+ overnight. Keerthi has been
working with the new surface source oven
for the last couple of weeks. His results
 9x 
  224   Wed Feb 3 16:30:02 2010 Damien Gallop  OLIS Shutdown began todayWe prepared stuff last night. This morning
we vented IOS to argon, then swiped. Clean.
Lu and Ajit craned out DB3 for us. Nice job,
  
  225   Wed Feb 10 17:18:24 2010 Damien Gallop  OLIS Shutdown in progressOLIS Shutdown has been in progress for
a week. IOS is vented, was swiped clean and
opened. DB3 was craned out, a precision job.
  
  226   Fri Feb 12 14:42:06 2010 Damien Gallop  OLIS Shutdown in progressSupernanogan cart removed from Faraday
cage to dock today. Some beam safety tests
on FC6 in progress presently. FC3 was already
 8x 
  227   Tue Feb 16 16:04:18 2010 Damien Gallop  OLIS Shutdown in progressPreparations for rewiring the DB1/3 optics
have begun. Sgan gas manifold work is in
progress. Note: IOS:MP1 is scheduled for
  
  228   Wed Feb 17 18:28:33 2010 Damien Gallop  OLIS Shutdown in progressMore materials prepared for optics refit.   
ELOG V2.9.2-2455