  313   Wed Jul 14 09:23:19 2010 Damien Gallop  12C2+ for TIGRESSOLIS is set up for 12C2+ delivery, with
about 13enA on FC6 from the Supernanogan
source presently. Beam was reasonably stable
 Picture_1.png 
  312   Tue Jul 13 18:33:04 2010 Damien Gallop  OLIS Maintenance and DevelopmentA source switchover day was negotiated,
with a goal to provide 12C2+ beam. As a practical
matter, it's been an OLIS Maintenance Day,
  
  311   Mon Jul 12 10:55:14 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam used sporadically over the weekend.
Note temperature response in beam. A power
bump occurred at about 10:00, knocking out
 Picture_1.png 
  310   Fri Jul 9 10:00:03 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningSource drifted overnight. Operators made
a slight correction to silence an alarm.
I have tweaked this up. Shown below are before
 8x 
  309   Thu Jul 8 09:38:36 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam idle overnight. Source conditioned
and changed a bit. Slight tweaking required
to bring it back to stable.
 Picture_5.png 
  308   Wed Jul 7 15:21:36 2010 Damien Gallop  16O1+ for SCC CommissioningA 16O1+ beam from the MWS is being used
for SCC development and commissioning by
agreement. Some sideshows getting there.
  
  307   Tue Jul 6 19:10:33 2010 Damien Gallop  OLIS MaintenanceSource pulled down for Mg removal and cleanup.
Done. Supernanogan refurbishing of MCIS optics
complete, plus a comple of other items. Opened
 grab.CK3013.png 
  306   Tue Jul 6 08:57:33 2010 Damien Gallop  26Mg6+ for TIGRESS EOBPhoto-finish for TIGRESS this morning,
apart from a cavity trip
at around 6:00 a.m.. The MWS is running very
 Picture_2.pngPicture_3.pngPicture_4.png 
  305   Mon Jul 5 11:58:49 2010 Damien Gallop  26Mg6+ for TIGRESSBeam was switched from 24Mg5+ to 26Mg6+
on Canada
Day. Also, the source blinked out on
 Picture_1.png 
  304   Wed Jun 30 09:11:25 2010 Damien Gallop  24Mg5+ to TIGRESSDelivery / standby continues.  Picture_2.pngPicture_3.png 
  303   Tue Jun 29 09:16:33 2010 Damien Gallop  24Mg5+ to TIGRESSDelivery to TIGRESS has begun. Beam from
the source looks perfect. Looks  like happy
times for them. The plan is to eventually
 6x 
  302   Mon Jun 28 09:19:16 2010 Damien Gallop  24Mg5+ to TIGRESSDelivery looks like it was pretty smooth
over the weekend. TIGRESS expects to receive
24Na from ITW via the CSB this week. Yield
 Picture_1.png 
  301   Thu Jun 24 11:52:34 2010 Damien Gallop  24Mg5+ to TIGRESS setupTuning into ISAC-II was done yesterday,
and continues today. The source was idle
overnight. There were a couple of magnesium
 Picture_2.png 
  300   Wed Jun 23 09:17:34 2010 Damien Gallop  24Mg5+ to TIGRESS setupMass change yesterday morning from 26Mg1+
to 24Mg1+ from the MWS. It was tough to get
stable beam from the source, and there are
 Picture_1.pngPicture_2.pngPicture_3.pngPicture_1.png 
  299   Tue Jun 22 08:42:33 2010 Damien Gallop  26Mg6+ for TUDA-IIBeam was redirected to TIGRESS yesterday.
RIB delivery to TIDA-II was rendered impossible
due to a failure in the target or module.
 Picture_3.png 
  298   Mon Jun 21 09:20:30 2010 Damien Gallop  26Mg6+ for TUDA-IIBeam waiting quietly on FC6. There was
a power
bump on Friday just after noon that tripped
 Picture_1.pnggrab.oS5646.png 
  297   Thu Jun 17 09:21:56 2010 Damien Gallop  26Mg6+ for TUDA-IITUDA-II began taking beam around midnight
last night. Beam on FC6 for a good part of
the night. Steady as she goes.
 Picture_1.png 
  296   Wed Jun 16 10:12:58 2010 Damien Gallop  26Mg6+ for TUDA-IIBeam idle overnight. Beam is being used
as a pilot beam for this run. Source was
knocked off by a power
 Picture_1.png 
  295   Mon Jun 14 09:44:06 2010 Damien Gallop  26Mg6+ for TUDA-IIOn Saturday we opened the MWS and set it
up for Mg operation. Everything went well.
We are using the pair of half-moon Mg metal
 Picture_4.png 
  294   Sat Jun 12 11:23:40 2010 Damien Gallop  26Mg6+ to TUDA-II source setupAfter EOB activities from 15N4+ run that
ended this morning, we have begun preparations
to switch over the ion sources. Turbos off
 grab.x14118.png 