313
|
Wed Jul 14 09:23:19 2010 |
Damien Gallop | | | 12C2+ for TIGRESS | OLIS is set up for 12C2+ delivery, with
about 13enA on FC6 from the Supernanogan
source presently. Beam was reasonably stable |
|
|
312
|
Tue Jul 13 18:33:04 2010 |
Damien Gallop | | | OLIS Maintenance and Development | A source switchover day was negotiated,
with a goal to provide 12C2+ beam. As a practical
matter, it's been an OLIS Maintenance Day, |
|
|
311
|
Mon Jul 12 10:55:14 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam used sporadically over the weekend.
Note temperature response in beam. A power
bump occurred at about 10:00, knocking out |
|
|
310
|
Fri Jul 9 10:00:03 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Source drifted overnight. Operators made
a slight correction to silence an alarm.
I have tweaked this up. Shown below are before |
8x |
|
309
|
Thu Jul 8 09:38:36 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam idle overnight. Source conditioned
and changed a bit. Slight tweaking required
to bring it back to stable. |
|
|
308
|
Wed Jul 7 15:21:36 2010 |
Damien Gallop | | | 16O1+ for SCC Commissioning | A 16O1+ beam from the MWS is being used
for SCC development and commissioning by
agreement. Some sideshows getting there. |
|
|
307
|
Tue Jul 6 19:10:33 2010 |
Damien Gallop | | | OLIS Maintenance | Source pulled down for Mg removal and cleanup.
Done. Supernanogan refurbishing of MCIS optics
complete, plus a comple of other items. Opened |
|
|
306
|
Tue Jul 6 08:57:33 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS EOB | Photo-finish for TIGRESS this morning,
apart from a cavity trip
at around 6:00 a.m.. The MWS is running very |
|
|
305
|
Mon Jul 5 11:58:49 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS | Beam was switched from 24Mg5+ to 26Mg6+
on Canada
Day. Also, the source blinked out on |
|
|
304
|
Wed Jun 30 09:11:25 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery / standby continues. |
|
|
303
|
Tue Jun 29 09:16:33 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery to TIGRESS has begun. Beam from
the source looks perfect. Looks like happy
times for them. The plan is to eventually |
6x |
|
302
|
Mon Jun 28 09:19:16 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery looks like it was pretty smooth
over the weekend. TIGRESS expects to receive
24Na from ITW via the CSB this week. Yield |
|
|
301
|
Thu Jun 24 11:52:34 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS setup | Tuning into ISAC-II was done yesterday,
and continues today. The source was idle
overnight. There were a couple of magnesium |
|
|
300
|
Wed Jun 23 09:17:34 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS setup | Mass change yesterday morning from 26Mg1+
to 24Mg1+ from the MWS. It was tough to get
stable beam from the source, and there are |
|
|
299
|
Tue Jun 22 08:42:33 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | Beam was redirected to TIGRESS yesterday.
RIB delivery to TIDA-II was rendered impossible
due to a failure in the target or module. |
|
|
298
|
Mon Jun 21 09:20:30 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | Beam waiting quietly on FC6. There was
a power
bump on Friday just after noon that tripped |
|
|
297
|
Thu Jun 17 09:21:56 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | TUDA-II began taking beam around midnight
last night. Beam on FC6 for a good part of
the night. Steady as she goes. |
|
|
296
|
Wed Jun 16 10:12:58 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | Beam idle overnight. Beam is being used
as a pilot beam for this run. Source was
knocked off by a power |
|
|
295
|
Mon Jun 14 09:44:06 2010 |
Damien Gallop | | | 26Mg6+ for TUDA-II | On Saturday we opened the MWS and set it
up for Mg operation. Everything went well.
We are using the pair of half-moon Mg metal |
|
|
294
|
Sat Jun 12 11:23:40 2010 |
Damien Gallop | | | 26Mg6+ to TUDA-II source setup | After EOB activities from 15N4+ run that
ended this morning, we have begun preparations
to switch over the ion sources. Turbos off |
|