  313  
 | 
Wed Jul 14 09:23:19 2010 | 
Damien Gallop |   |   | 12C2+ for TIGRESS | OLIS is set up for 12C2+ delivery, with 
about 13enA on FC6 from the Supernanogan 
source presently. Beam was reasonably stable | 
    | 
| 
  312  
 | 
Tue Jul 13 18:33:04 2010 | 
Damien Gallop |   |   | OLIS Maintenance and Development | A source switchover day was negotiated, 
with a goal to provide 12C2+ beam. As a practical 
matter, it's been an OLIS Maintenance Day, | 
   | 
| 
  311  
 | 
Mon Jul 12 10:55:14 2010 | 
Damien Gallop |   |   | 16O1+ at 32.64keV for accelerator commissioning | Beam used sporadically over the weekend. 
Note temperature response in beam. A power 
bump occurred at about 10:00, knocking out | 
    | 
| 
  310  
 | 
Fri Jul  9 10:00:03 2010 | 
Damien Gallop |   |   | 16O1+ at 32.64keV for accelerator commissioning | Source drifted overnight. Operators made 
a slight correction to silence an alarm. 
I have tweaked this up. Shown below are before | 
 8x   | 
| 
  309  
 | 
Thu Jul  8 09:38:36 2010 | 
Damien Gallop |   |   | 16O1+ at 32.64keV for accelerator commissioning | Beam idle overnight. Source conditioned 
and changed a bit. Slight tweaking required 
to bring it back to stable. | 
    | 
| 
  308  
 | 
Wed Jul  7 15:21:36 2010 | 
Damien Gallop |   |   | 16O1+ for SCC Commissioning | A 16O1+ beam from the MWS is being used 
for SCC development and commissioning by 
agreement. Some sideshows getting there. | 
   | 
| 
  307  
 | 
Tue Jul  6 19:10:33 2010 | 
Damien Gallop |   |   | OLIS Maintenance | Source pulled down for Mg removal and cleanup. 
Done. Supernanogan refurbishing of MCIS optics 
complete, plus a comple of other items. Opened | 
    | 
| 
  306  
 | 
Tue Jul  6 08:57:33 2010 | 
Damien Gallop |   |   | 26Mg6+ for TIGRESS EOB | Photo-finish for TIGRESS this morning, 
apart from a cavity trip 
at around 6:00 a.m.. The MWS is running very | 
      | 
| 
  305  
 | 
Mon Jul  5 11:58:49 2010 | 
Damien Gallop |   |   | 26Mg6+ for TIGRESS | Beam was switched from 24Mg5+ to 26Mg6+ 
on Canada 
Day. Also, the source blinked out on | 
    | 
| 
  304  
 | 
Wed Jun 30 09:11:25 2010 | 
Damien Gallop |   |   | 24Mg5+ to TIGRESS | Delivery / standby continues. | 
     | 
| 
  303  
 | 
Tue Jun 29 09:16:33 2010 | 
Damien Gallop |   |   | 24Mg5+ to TIGRESS | Delivery to TIGRESS has begun. Beam from 
the source looks perfect. Looks  like happy 
times for them. The plan is to eventually | 
 6x   | 
| 
  302  
 | 
Mon Jun 28 09:19:16 2010 | 
Damien Gallop |   |   | 24Mg5+ to TIGRESS | Delivery looks like it was pretty smooth 
over the weekend. TIGRESS expects to receive 
24Na from ITW via the CSB this week. Yield | 
    | 
| 
  301  
 | 
Thu Jun 24 11:52:34 2010 | 
Damien Gallop |   |   | 24Mg5+ to TIGRESS setup | Tuning into ISAC-II was done yesterday, 
and continues today. The source was idle 
overnight. There were a couple of magnesium | 
    | 
| 
  300  
 | 
Wed Jun 23 09:17:34 2010 | 
Damien Gallop |   |   | 24Mg5+ to TIGRESS setup | Mass change yesterday morning from 26Mg1+ 
to 24Mg1+ from the MWS. It was tough to get 
stable beam from the source, and there are | 
       | 
| 
  299  
 | 
Tue Jun 22 08:42:33 2010 | 
Damien Gallop |   |   | 26Mg6+ for TUDA-II | Beam was redirected to TIGRESS yesterday. 
RIB delivery to TIDA-II was rendered impossible 
due to a failure in the target or module. | 
    | 
| 
  298  
 | 
Mon Jun 21 09:20:30 2010 | 
Damien Gallop |   |   | 26Mg6+ for TUDA-II | Beam waiting quietly on FC6. There was 
a power 
bump on Friday just after noon that tripped | 
     | 
| 
  297  
 | 
Thu Jun 17 09:21:56 2010 | 
Damien Gallop |   |   | 26Mg6+ for TUDA-II | TUDA-II began taking beam around midnight 
last night. Beam on FC6 for a good part of 
the night. Steady as she goes. | 
    | 
| 
  296  
 | 
Wed Jun 16 10:12:58 2010 | 
Damien Gallop |   |   | 26Mg6+ for TUDA-II | Beam idle overnight. Beam is being used 
as a pilot beam for this run. Source was 
knocked off by a power | 
    | 
| 
  295  
 | 
Mon Jun 14 09:44:06 2010 | 
Damien Gallop |   |   | 26Mg6+ for TUDA-II | On Saturday we opened the MWS and set it 
up for Mg operation. Everything went well. 
We are using the pair of half-moon Mg metal | 
    | 
| 
  294  
 | 
Sat Jun 12 11:23:40 2010 | 
Damien Gallop |   |   | 26Mg6+ to TUDA-II source setup | After EOB activities from 15N4+ run that 
ended this morning, we have begun preparations 
to switch over the ion sources. Turbos off | 
    |