M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 9 of 15  ELOG logo
Entry  Tue Jun 13 15:52:46 2006, Willy Andersson, Quench Recovery, Doug has reduced and now closed CV155. 
Entry  Tue Jun 13 10:54:27 2006, Doug Preddy, Quench Recovery, Compressor tripped off 
Entry  Tue May 30 14:36:41 2006, Doug Preddy, Normal Running, power leads warming 
Entry  Fri May 26 14:34:24 2006, Doug Preddy, Start Up, Ready to run 
Entry  Fri May 26 10:03:03 2006, Doug Preddy, Start Up, Started flow to power leads 
Entry  Fri May 26 08:45:38 2006, Doug Preddy, Start Up, Changed to series mode 
Entry  Fri May 26 07:29:54 2006, Doug Preddy, Start Up, CV155 closed 
Entry  Thu May 25 07:34:18 2006, Doug Preddy, Start Up, switched to parallel cold return 
Entry  Tue May 23 08:44:28 2006, Doug Preddy, Start Up, Started turbines 
Entry  Thu Dec 22 15:10:44 2005, Doug Preddy, Shut Down, shut down system 
Entry  Mon Dec 12 09:24:29 2005, Doug Preddy, Quench Recovery, Solenoid Quench on power lead temp 
Entry  Tue Nov 15 07:25:10 2005, Doug Preddy, Normal Running, power supply problem 
Entry  Thu Nov 3 09:27:16 2005, Doug Preddy, Quench Recovery, started flow to solenoid 
Entry  Thu Nov 3 06:19:50 2005, Doug Preddy, Quench Recovery, restart system 
Entry  Wed Nov 2 10:17:27 2005, Willy Andersson, Start Up, M9B helium refrigerator and solenoid cooldown 
Entry  Mon Oct 31 07:48:57 2005, Willy Andersson, Quench Recovery, what a fine entry 
Entry  Sun Aug 14 10:03:13 2005, Willy Andersson, Normal Running, System stable 
Entry  Tue Jul 19 18:09:56 2005, Willy Andersson, Quench Recovery, Quench II 
Entry  Tue Jul 19 16:13:32 2005, Willy Andersson, Quench Recovery, switch to series mode 
Entry  Mon Jul 18 15:51:17 2005, Doug Preddy, Quench Recovery, Compressor restarted, flow to solenoid 
ELOG V2.9.2-2455