M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 7 of 15  ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Operational Mode Subject Text Attachments
  81   Tue Nov 23 15:10:06 2004 Doug PreddyQuench Recoveryswitched to parallel cold return mode    
  84   Wed Nov 24 14:58:42 2004 Doug PreddyQuench RecoverytodayCame in this morning to find the helium return
line to the buffer tank 
frosted up. MV51 has been stuck open the
  
  85   Thu Nov 25 07:21:37 2004 Doug PreddyQuench Recoverystarted power lead flowCurtis switched to series mode last night
at 7:00.
Startedflow to power leads at 7:00 this morning.
  
  87   Mon Nov 29 09:28:16 2004 Doug PreddyNormal RunningBuffer tank emptyCame down to check on system. CV211 was fully
open, trying to charge the 
system. Ripples on LHe in and PL neg. CV141
  
  88   Wed Dec 1 12:55:56 2004 Doug PreddyNormal Runningadded one bottle helium gasbuffer tank pressure is up to 6.5 psi.   
  89   Thu Dec 2 10:51:16 2004 Doug PreddyNormal Runningpower lead rippleRipples got worse overnight.LHe in 10.3-11.7,
PL Neg 8.0-8.7. Flows <200mm.
cycled CV142. Flows 240mm. LHe in 10.3-11.3
  
  90   Sun Dec 5 11:15:24 2004 Doug PreddyNormal Runningmore ripplesI loked at the power lead temps this morning.
LHe_in 10.4-12.0  PL-Neg 8.0-
9.0  PL-Pos 9.8-10.4. Flows down to 160mm.
  
  91   Fri Mar 11 09:18:30 2005 Doug PreddyMaintenanceservices on systemThe cold box was isolated and pumped out after
it warmed up. It has been 
refilled with helium.
  
  92   Mon Apr 18 09:52:11 2005 Doug PreddyMaintenanceRelays replacedThe following relays have been replaced in
the Sulzer control panel:
K341, K379, K132, K324A, K314, K125, K127,
  
  93   Thu May 19 15:05:31 2005 Doug PreddyMaintenanceSTA 120 replacedThe turbine 2 speed indicator control box
STA 120 has been replaced with a 
newer style Jaquet controller. This is similar
 M9 Turbine 2.doc 
  94   Wed Jun 1 08:23:19 2005 Doug PreddyStart Upstart up notesThe solenoid was pumped out Monday and yesterday
after the quads just 
downstream of the solenoid were put back
  
  95   Wed Jun 1 23:48:02 2005 Doug PreddyQuench Recoverythe first quenchI recieved a call from ops at 22:00 tonight
that the solenoid had alarmed. 
I came in and found a cold box fault, with
  
  96   Thu Jun 2 01:26:30 2005 Doug PreddyQuench Recoverystarted flow to solenoidSee attached file for a screen grab of temps.  Capture6-2-05-1.13.33 AM.jpg 
  97   Thu Jun 2 01:38:25 2005 Doug PreddyQuench Recoverystrip tool plotThis is a strip tool  plot of the cooldown  02-06-05-12.57.26 AM.jpg 
  98   Thu Jun 2 09:16:40 2005 Doug PreddyQuench Recoverycontinuing to coolSee screen grab  02-06-05-7.32.49 AM.jpg 
  100   Thu Jun 9 08:56:10 2005 Doug PreddyQuench Recoverysystem back onThe compressor was restarted and the solenoid
is cooling (sort of) in 
parallel cold return.
  
  103   Tue Jun 14 20:53:19 2005 Doug PreddyQuench Recoveryrestarted refrigerator after power bumpsee bitmap for temps/pressures after presurrizing
coldbox. Preparing to 
start flow to turbines, then will start flow
 june142045.BMP 
  104   Tue Jun 14 23:01:22 2005 Doug PreddyQuench Recoveryswitched to parallel cold return    
  105   Mon Jul 18 11:18:40 2005 Doug PreddyQuench RecoverySolenoid Quenched over the weekendThe solenoid was found to be warm on Monday
morning. M9Q3 had a bad water 
leak over the weekend. The water header serving
  
  106   Mon Jul 18 15:51:17 2005 Doug PreddyQuench RecoveryCompressor restarted, flow to solenoidRecovered the vacuum in the solenoid, then
started the compressor.
Started flow to solenoid in parallel warm
  
ELOG V2.9.2-2455